background image

 

 

SJS10-M HYDRAULIC STEPPED JAW SPREADER 

OPERATING AND SAFETY INSTRUCTIONS 

 

TDS:- 

1374 

Prepared by:-  Matthew Hughes 

Approved by:-  Mark Dalley 

Date:

05/12/12

 

REV NO:- 

002 

 

 

 

 

ECO:-  

3957 

 

 

 

 

 

Page 

1

 of 

9

 

 

 

The  Hi-Force  SJS10-M  hydraulic  spreader  is  a  self  contained  unit,  the  spreaders  are 
despatched from the factory pre-filled with oil, and are ready for use. 

 

 
INSPECTION UPON RECEIPT OF GOODS 

 

On  initial  receipt  of  goods  visually  check  for  transit  damage.  If  found  contact  the  carrier 
immediately. 

 

 

SAFETY 

 
Read these instructions and safety warnings fully. Failure to do so could result in  Death, 
Personal injury or equipment damage. 

  Wear suitable personal protection equipment when operating hydraulic equipment. 

 

Keep all body parts away from tool and work piece / load.  

 

  Do not work on an assembly held open only by hydraulic means. Always use the safety 

block provided to keep a joint open. 

 

    

Summary of Contents for SJS10-M

Page 1: ...r use INSPECTION UPON RECEIPT OF GOODS On initial receipt of goods visually check for transit damage If found contact the carrier immediately SAFETY Read these instructions and safety warnings fully F...

Page 2: ...g a pipe flange for example to replace the gasket it is often advantageous to use two spreading wedges opposite each other Please consult your distributor for details Be aware that as the tool expands...

Page 3: ...ach the stepped blocks with fixing screws as shown Note in certain circumstances when the hydraulic pressure is released and the tool is under external load the tool will not retract A gentle blow on...

Page 4: ...xpand Pump release valve open Pump oil level too low Pump malfunctioning Pump pressure relief valve set too low Load too great for tool Tool already at full stroke Tool only advances part way Pump oil...

Page 5: ...SJS10 M HYDRAULIC STEPPED JAW SPREADER OPERATING AND SAFETY INSTRUCTIONS TDS 1374 Prepared by Matthew Hughes Approved by Mark Dalley Date 05 12 12 REV NO 002 ECO 3957 Page 5 of 9 NOTE S...

Page 6: ...SJS10 M HYDRAULIC STEPPED JAW SPREADER OPERATING AND SAFETY INSTRUCTIONS TDS 1374 Prepared by Matthew Hughes Approved by Mark Dalley Date 05 12 12 REV NO 002 ECO 3957 Page 6 of 9 NOTE S...

Page 7: ...SJS10 M HYDRAULIC STEPPED JAW SPREADER OPERATING AND SAFETY INSTRUCTIONS TDS 1374 Prepared by Matthew Hughes Approved by Mark Dalley Date 05 12 12 REV NO 002 ECO 3957 Page 7 of 9 NOTE S...

Page 8: ...an Baku Azerbaijan Tel 994 12 447 4100 Email baku hi force com Hi Force Hydraulics Asia S B Selangor Malaysia Tel 603 5569 4209 Email malaysia hi force com Hi Force Nederland BV Strijen Netherlands Te...

Page 9: ...SJS10 M HYDRAULIC STEPPED JAW SPREADER OPERATING AND SAFETY INSTRUCTIONS TDS 1374 Prepared by Matthew Hughes Approved by Mark Dalley Date 05 12 12 REV NO 002 ECO 3957 Page 9 of 9...

Reviews: