background image

16826

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-577-9663

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Summary of Contents for 16826

Page 1: ...y or product information call our toll free number 1 800 577 9663 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ...

Page 2: ... This page intentionally left blank ...

Page 3: ...pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 CHECK ALL PARTS Inventory all parts listed on pages 4 6 Contact our Customer Service Team if any parts are missing or damaged ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 3 fo...

Page 4: ...or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Hammer ...

Page 5: ...3 Lbs For shingles PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists shown below Below is a list of additional materials not included x3 x6 2 x 4 x 8...

Page 6: ...x 162 5 cm UX x3 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x2 2 x 4 x 40 5 1 x 10 2 x 101 6 cm SKA x2 2 x 3 x 33 1 8 5 1 x 7 6 x 84 1 cm BQA x4 19 32 x 2 1 2 x 9 1 5 x 6 3 x 22 9 cm EY x2 2 x 4 x 86 1 8 5 1 x 10 2 x 203 5 cm JEA 3 4 1 9 cm 2 x 4 x 16 1 2 5 1 x 10 2 x 41 9 cm x8 RD x2 2 x 4 x 57 5 8 5 1 x 10 2 x 146 4 cm FGA x1 1 x 3 x 5 2 5 x 7 6 x 12 7 cm GAA x11 2 x 3 x 10 1 2 5 1 x 7 6 x 26 7 cm BRA ...

Page 7: ... x1 3 8 x 2 x 93 1 4 0 9 x 5 1 x 236 8 cm x2 3 8 x 2 x 68 3 4 0 9 x 5 1 x 174 6 cm x2 19 32 x 2 1 2 x 41 1 4 1 5 x 6 3 x 104 8 cm JFA x2 19 32 x 2 1 2 x 24 3 8 1 5 x 6 3 x 61 9 cm CY x1 2 x 3 x 59 1 4 5 1 x 7 6 x 150 5 cm GKA x1 PT 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x2 OY 2 x 3 x 72 5 1 x 7 6 x 182 8 cm x1 3 8 x 10 3 8 x 79 5 8 1 x 26 3 x 202 2 cm x2 3 8 x 5 1 4 x 95 1 2 1 x 13 3 x 242 5 cm 5 PANEL P...

Page 8: ...x 84 1 x 122 x 215 3 cm x1 3 8 x 42 x 96 1 x 106 7 x 243 8 cm x2 3 8 x 23 7 8 x 96 1 x 60 6 x 243 8 cm 6 x255 2 5 1 cm 3 7 6 cm x85 x76 x123 x4 1 1 4 3 2 cm 3 4 1 9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm x180 1 1 2 3 8 cm x2 8 x 16 20 3 x 35 6 cm x2 1 1 2 3 8 cm 1 2 1 2 cm x12 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged separately special coating x2 Window 16 1 4 x 22 1 4 41 3 x 56 5 cm x3 9 X 27 22 8 x 68...

Page 9: ...ing in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 12 10 x 10 x 365 8 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 40 3 screws exterior grade Use only wood treated for ground contact and fasteners approved for use with t...

Page 10: ...ill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2 x 4 x 12 0 5 1 x 10 2 x 365 8 cm 2 x 4 x 7 6 5 1 x 10 2 x 229 6 cm Caulk Requires x2 x2 x1 MUST be treated lumber MUST be treated lumber 144 365 8 cm 144 x 90 365 8 x...

Page 11: ...easier nailing stand on frame 2 1 Use two 3 nails at each mark Orient parts as shown on flat surface Measure and mark BEGIN You have finished your floor frame Proceed to level and square frame FINISH 3 Flush Flush Flush Flush TOENAILING 48 121 9 cm 48 121 9 cm 32 81 3 cm 16 40 6 cm 48 121 9 cm 64 162 6 cm 80 203 2 cm 90 228 6 cm 87 221 cm 96 243 8 cm 112 284 5 cm 128 325 1 cm 144 365 8 cm 96 243 8...

Page 12: ...t will be approximately 169 13 16 431 3 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame to the 4x4 runners at ea...

Page 13: ... by installing one panel and squaring frame Fig A Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 169 13 16 431 3 cm Fig C PARTS REQUIRED x1 x50 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm Grid lines up Seam Seam 2 5 1 cm Flush Flush 2 Nails FLOOR PANELS 3 4 1 9 cm Fig B Flus...

Page 14: ...ing your floor panels Continue installing panels with rough side up painted grid lines Use grid lines on panel for 2 nails 6 apart on edges and 12 apart inside panels 5 7 6 x1 x1 x91 5 8 x 48 x 90 1 6 x 60 6 x 122 cm 5 8 x 42 x 96 1 6 x 106 7 x 243 8 cm Grid lines up 2 5 1 cm FLOOR PANELS Flush Flush DOOR Flush Flush ...

Page 15: ...frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls DOOR ...

Page 16: ...cm UX x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x32 14 3 7 6 cm BEGIN 1 Use two 3 nails at each mark and four 3 nails at seams Orient parts on edge on floor Measure and mark 2 UX x7 TP SP SP TP 144 365 8 cm 120 304 8 cm 64 162 5 cm 1 1 2 3 8cm 96 243 8 cm 96 243 8 cm 48 122 cm 72 182 9 cm 48 122 cm 24 61 cm 96 243 8 cm TOENAILING 3 7 6 cm Nails ...

Page 17: ...t on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails Fig B 4 5 3 3 4 GAUGE BLOCK GAA Primed side up For squareness maintain 3 4 measurement along panel edges BEGI...

Page 18: ...8 x 72 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 7 You have finished building your back wall FINISH 9 48 x 72 121 9 x 213 4 cm x2 x90 BACK WALL PANELS PARTS REQUIRED 2 5 1 cm 8 Carefully flip the BACK wall over 3 4 GAUGE BLOCK GAA 3 4 GAUGE BLOCK Flush Primed side up Primed side up For squareness maintain 3 4 measurement along ...

Page 19: ... 2 x 101 6 cm x2 SKA 2 x 4 x 16 1 2 5 1 x 10 2 x 42 cm x1 RD x34 3 7 6 cm BEGIN 1 Use two 3 nails at each mark and four 3 nails at seams For front wall orient parts on edge on floor Measure and mark 2 Flush Flush Flush Flush 39 99 1 cm 24 61 cm 16 1 2 42 cm 40 101 6 cm 40 101 6 cm 24 61 cm 24 61 cm 16 40 6 cm 16 40 6 cm 57 5 8 146 4 cm 84 7 8 215 6 cm 94 1 2 240 1 cm 89 226 1 cm 69 1 2 176 5 cm 86...

Page 20: ... 5 1 x 10 2 x 41 9 cm x3 RD x12 3 7 6 cm Use two 3 nails at each mark Orient parts on edge as shown Measure and mark 3 4 64 162 6 cm You have finished building your front wall frame FINISH 5 27 1 2 69 9 cm 115 3 8 293 1 cm 57 3 8 145 7 cm 28 3 8 72 1 cm 27 1 2 69 9 cm 27 1 2 69 9 cm RD x3 ...

Page 21: ...64 DIMENSION BETWEEN STUDS Handle panels with care to avoid breakage Hold the 3 4 measurement along left edge of panel Use a gauge block Ensure top of panel is overhanging the top of frame by 6 UNTIL FRONT PANELS ARE INSTALLED HANDLE CAREFULLY TO AVOID BREAKING AT CORNERS AND EDGES CENTER CENTER Primed side up 3 4 GAUGE BLOCK Handle panels with care to avoid breakage 3 4 GAUGE BLOCK 6 15 2 cm 3 4 ...

Page 22: ...studs and square frame 4 5 3 Use OO as a brace to maintain 64 162 6 cm opening Use two 3 screws to attach MAINTAIN 64 DIMENSION BETWEEN STUDS Hold the 3 4 measurement along right edge of panel Use a gauge block Ensure top of panel is overhanging the top of frame by 6 Primed side up For squareness maintain 3 4 measurement along panel edge Overhang top 6 3 4 1 9 cm 3 4 GAUGE BLOCK Maintain Square 3 ...

Page 23: ...e flush to left 48 x 96 panel with primed side up as shown Ensure top of panel is overhanging the top of frame by 6 Nail the panel using 2 nails 6 apart on edges 7 6 You have finished building your front wall FINISH 9 Carefully flip the FRONT WALL over 6 15 2 cm Flush Flush Flush Flush 6 15 2 cm 6 15 2 cm MAINTAIN 64 DIMENSION BETWEEN STUDS 6 15 2 cm Primed side up Primed side up ...

Page 24: ...ION D O O R 3 Nails into bottom plate 3 7 6 cm Screws x2 BEGIN Stand backwall on floor It is important to secure the backwall in the following order ENSURE 4 MEASUREMENT IS AT TOP OF BACK WALL ASSEMBLY Center back wall assembly on the 144 floor dimension 1 144 365 8 cm 4 10 2 cm Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig B Use 2 JDA as a temporary brace Level wall and secure JDA with two...

Page 25: ...es to floor using 8 3 nails Fig B 4 3 7 6 cm x8 3 7 6 cm x4 x14 FRONT WALL INSTALLATION BOA x2 3 Nails into bottom plate 3 7 6 cm Screws x4 LEVEL BEGIN Stand front wall on floor Center front wall assembly on the 144 front floor dimension Use 2 BOA as temporary braces Level wall and secure BOA with two 3 screws 2 1 144 365 8 cm Nail 2 nails first 2 5 1 cm Nails 3 7 6 cm Nails Fig B 2 x 4 x 93 3 16 ...

Page 26: ...ails at each stud and four 3 nails at seam For back wall orient parts on flat on top of wall frame BE SURE DOUBLERS ARE FLUSH 3 For front wall use 3 nails as shown Use 4 3 nails at seam BE SURE DOUBLERS ARE FLUSH SP TP 3 7 6 cm Nails Stagger seams Flush Flush Flush x1 2 x 4 x 86 1 4 5 1 x 10 2 x 219 1 cm FHA x1 2 x 4 x 57 5 8 5 1 x 10 2 x 146 4 cm FGA 3 7 6 cm Nails Flush Flush Flush FGA FHA Stagg...

Page 27: ...d into outer rafter end Fig A and afterwards toenailed into inside of rafter Fig B Secure front of outer rafter using 3 screws installed centered into outer rafter end Fig C and afterwards toenailed into inside of rafter Fig D Repeat Steps 1 4 for opposite side outer rafter Orient front of outer rafter flush to front wall panel Fig C and flush to end of front wall doubler Fig D 1 2 4 5 3 3 7 6 cm ...

Page 28: ...26 2 5 1 cm x20 OUTER RAFTER INSTALLATION PARTS REQUIRED x2 H 2 5 Tie Plate Attach tie plates with 2 nails as shown 6 You have finished installing your outer rafters FINISH 7 2 5 1 cm Nails ...

Page 29: ...to install 6 remaining rafters Line up rafter centered with marks on front doubler Ensure rafter is flush to front wall panel Fig C and resting flush on top of front doubler Fig C Secure front of rafter using 3 screw installed centered into outer rafter end Fig C 2 3 5 6 DO NOT OVER DRIVE SCREW THROUGH PANEL BEGIN Starting at end as shown measure and mark location of each rafter 1 4 3 7 6 cm Screw...

Page 30: ...stalling your rafters FINISH 8 x9 H 2 5 Tie Plate Attach 9 tie plates with 1 1 2 nails as shown 7 Attach far left tie plate reversed position from others Fig A HINT Look for the Simpson name on the tie plate 1 1 2 3 8 cm Nails Fig A LEFT RIGHT DOOR 1 1 2 3 8 cm x90 ...

Page 31: ...ame along the entire length Fig B Angle nails to hit floor frame Fig C Attach OO as a support ledge to to help install side wall panels Measure down from floor 1 and mark Ensure OO is level and centered Secure to floor joist with two 3 screws Move to the top of panel Using the long edge of the panel as a lever move the panel side to side until top of panel is flush with front wall stud Secure uppe...

Page 32: ...n three corners Fig E Ensure the measurement between the panel edges are the same along the entire length Fig B Angle nails to hit floor frame Fig C 4 Fig E Primed side up Fig C Fig B 1 1 2 Nails 2 Nail Flush Flush 42 106 7 cm Same Measurement 6 Nail lower edge of panel to floor using 2 nails 6 apart Angle nail to hit floor frame Fig A Nail side wall panels to rafter and wall studs using 1 1 2 nai...

Page 33: ...A on seam of wall panels JEA JDA JCA RD 3 7 6 cm Screw D O O R MARK BEGIN Install JDA centered at seam of side wall panels Fig A Use a square to ensure 90 degree squareness of studs JDA JCA and JEA Mark locations of studs and ensure 90 degrees angle at top of each stud HINT Use RD as a guide to hold 16 1 2 between studs Secure side wall studs with 3 screws into end rafters and floor frame Fig B 1 ...

Page 34: ...ing your SIDE WALL PANELS FINISH 11 Nail side wall panels to inside wall studs using 1 1 2 nails 6 apart along panel seam and 12 apart in middle of panels as shown Measure align and mark side wall studs 24 from center of panel seam as shown 9 9 Repeat Step 9 to nail the opposite side panels 10 20 50 8 cm 20 50 8 cm ...

Page 35: ...P SIDE WALL WINDOW FRAMING PARTS REQUIRED 3 7 6 cm x16 2 x 4 x 16 1 2 5 1 x 10 2 x 41 9 cm x4 RD Choose the side wall you want to install your windows on From inside measure and mark locations of 4 RD Secure with 3 screws 2 3 7 6 cm Screws Angle nail to hit RD 3 1 2 8 9 cm 24 1 2 62 2 cm 41 1 2 105 4 cm 1 BEGIN ...

Page 36: ...rough both wall panels in each corner of window framing From outside mark straight lines connecting the holes Cut along lines using a saw Carefully trim panel openings after cutting as necessary 3 3 4 You have finished preparing your SIDE WALL for window installation FINISH 5 Pre drill hole 3 8 1 0 cm ...

Page 37: ...res 3 4 1 9 cm along the length of the rafter Fig B Secure panel with 2 nails as shown D O O R D O O R Place the 11 7 8 x 60 1 4 lower roof panel with the rough side up flush to installed 11 7 8 x 96 panel Ensure the 11 7 8 x 60 1 4 roof panel measures 2 7 8 8 3 cm overhanging back wall panel Fig B and is also flush with installed panel Fig C Secure panel with 2 nails as shown 2 Flush Fig C 2 7 8 ...

Page 38: ...ne up with 6 overhang measurement Fig D 4 You must square the roof by attaching one 48 x 96 panel at this time You will use the panel s long edge as a lever to bring your roof into square Place the 48 x 96 roof panel as shown with the rough side up Use a gauge block to ensure the panel measures 3 4 1 9 cm along the length of the rafter Fig A Panel should be flush with top edge of lower installed r...

Page 39: ... side up flush to first panel along edge and at both corners Fig E F Repeat nailing pattern Nail the third 48 x 96 roof panel with the rough side up flush to second 48 x 96 panel Repeat nailing pattern Ensure the 48 x 96 roof panel is flush to installed roof panels Fig F G Nail the 11 7 8 x 96 roof panel with the rough side up flush to third 48 x 96 panel using 2 nails 6 apart Ensure the 11 7 8 x ...

Page 40: ...rough roof panels Fig A At roof panel seams use 4 screws Fig B Use screws at rafter ends as a guide to line up BRA with rafter ends Line up with rafter screw Ensure BRA extensions at each side are flush with side wall panels Fig C FINISH 2 Fig B Fig A SQUARE SQUARE DOOR DO NOT OVER DRIVE SCREWS THROUGH ROOF PANELS You have finished installing your RAFTER EXTENSIONS BEGIN 1 Flush Fig C Fig C Flush ...

Page 41: ...FRAMING 1 Align BPA edge flush with rafter extension BRA Fig A Attach with 3 2 nails Fig B BEGIN HJ BPA BRA 2 3 4 Attach HJ flush with BPA with 5 2 nails Fig A FIg B Repeat Steps 1 2 on opposite side You have finished installing your gable rake framing FINISH Fig B 2 Finish Nail Flush Flush at seam Angled Ends Flush Fig A ...

Page 42: ...g A Secure to side rake frame BPA using 7 2 finish nails Fig A B Repeat Step 1 on opposite side BEGIN You have finished installing your side soffit panels FINISH 3 2 Finish Nails 2 Finish Nails FRONT WALL PANEL x2 3 8 x 5 1 4 x 95 1 2 1 x 13 3 x 242 5 cm Fig A Fig B 95 1 2 242 5 cm Flush Flush Flush BPA BPA BPA BR BR ...

Page 43: ...t right side of soffit into BRA Fig B Attach 79 5 8 soffit primed side down under rafter extensions BRA flush to side wall soffit Fig C Ensure soffit is flush to front wall panel Secure to BRA using 12 2 finish nails as shown Toenail at left side of soffit into BRA Fig D BEGIN PARTS REQUIRED x24 2 5 1 cm FRONT SOFFIT 2 You have finished installing your front soffit panels FINISH 3 2 Finish Nails F...

Page 44: ...extension BRA Secure HHA with 2 finish nails into BRA Fig B BEGIN 1 Position ZX primed side out flush with HHA and flush up under roof panels Secure ZX with 2 finish nails into BRA Fig B 2 x1 19 32 x 3 1 2 x 60 3 8 1 5 x 8 8 x 153 4 cm HHA 19 32 x 3 1 2 x 96 1 5 x 8 8 x 243 8 cm x1 ZX 2 Finish Nails 2 Finish Nails 1 4 3 4 APPROXIMATELY 60 3 8 153 4 cm FRONT WALL Flush Flush Flush Flush Flush BRA H...

Page 45: ...x 33 1 8 5 1 x 7 6 x 84 1 cm BQA x2 19 32 x 3 1 2 x 48 1 5 x 8 8 x 121 9 cm ZT x1 19 32 x 3 1 2 x 59 1 4 1 5 x 8 8 x 150 4 cm BXR x1 19 32 x 3 1 2 x 59 1 4 1 5 x 8 8 x 150 4 cm BXL x2 OY 2 x 3 x 72 5 1 x 7 6 x 182 8 cm BEGIN 1 2 4 3 OY OY BQA BQA Fig B Edges of BXR and BQA are flush BXL ZT OY BQA Fig D Edges of BXR and BQA are flush BXR ZT OY BQA To build left side fascia assembly place BQA and OY...

Page 46: ...nt fascia to side fascia with 2 2 finished nails Fig D x18 2 5 1 cm Secure fascia assembly under roof panels flush with front fascia board using 7 2 screws through roof sheathing Fig A Nail through side soffit into fascia assembly with 7 2 finish nails Fig C 2 3 4 x1 x1 LEFT FASCIA ASSEMBLY LEFT FASCIA ASSEMBLY RIGHT FASCIA ASSEMBLY 2 Finish Nails Flush Fig D 2 Finish Nails ROOF SHEATHING Fig B Ti...

Page 47: ...all panel Fig A BEGIN 1 Secure PT and GKA with 2 wood screws through roof sheathing Fig A 2 Nail HBA and ZX to PT and GKA using 2 nails Fig C Ensure trim is primed side out 4 Secure side fascia trim ZT to HBA and ZX using 1 2 nail at each end Fig D 5 Secure PT and GKA with 1 3 screw through side fascia trim nailer OY Fig B 3 FINISH 6 You are finished installing your rear fascia trim 2 Screw PT GKA...

Page 48: ...ur back corner trim 4 Repeat for other side 3 2 FINISH Fig C 68 3 4 174 6 cm 69 1 4 175 8 cm Angled End up Place 69 1 4 back side corner trim angled end up Fig E flush up under side soffit panel and flush with back corner trim along the length Fig E Attach trim using 6 2 finish nails into corner wall stud Fig D C Space nails equally Fig C Fig D Fig E 2 Nail 69 1 4 175 8 cm Angled end Flush at soff...

Page 49: ...x12 2 5 1 cm SIDE CORNER TRIM FINISH You have finished attaching your side corner trim boards 2 Attach 93 1 4 side corner trims on both sides flush with front wall panel Use 6 2 finish nails to secure side trim to side wall Fig A B C BEGIN 1 FRONT WALL PANEL Fig A Fig C Fig B Flush 2 Finish Nail Flush ...

Page 50: ...Attach 72 and 73 3 8 front horizontal frieze boards using 2 finish nails evenly spaced as shown Fig A Note The frieze boards will be flush with the side trim Fig B FRONT FRIEZE TRIM FINISH You have finished attaching your front frieze trim 2 Fig A Fig B 2 5 1 cm Flush 73 3 8 72 Flush 2 Finish Nail Flush Flush ...

Page 51: ...NER TRIM Attach both vertical 91 1 4 front corner trim on both sides flush to edge of installed side trim using 6 2 finish nails evenly spaced in each trim board Fig A B C FINISH You have finished attaching your front corner trim boards 2 BEGIN 1 Flush Flush 2 Finish Nail Fig A 91 1 4 231 7 cm ...

Page 52: ...d at ends as shown Tighten securely Attach temporary support GAA with two 1 1 4 screws as shown Tighten securely HINT Look for 3 8 SPACER attached to doors OO GAA Make sure spacer is attached Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bottom edges flush NOTE Screw hole will be used later 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm OO x1 1 1 2 x 2 1 2 x 69 ...

Page 53: ...ling your doors Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using 3 screws Fig A Screw hinge boards into wall frame and floor using ten 3 screws as shown Make sure screws go into framing and floor Fig C D Check ledger board is still flush under panels 3 7 6 cm Screws into the wall support and floor frame 1 1 2 x 2 1 2 x 69 3 8 x 6 3 x 175 3 cm x1 OO O...

Page 54: ... five 3 4 screws from inside of doors Fig B Secure hinge boards from inside using 3 4 screws as shown Fig A 5 Center metal threshold between doors and secure using 11 3 4 special coating screws into floor Fig D 6 Center trim ZJ over doors and secure using five 2 nails into framing as shown 4 Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown Fig B Us...

Page 55: ... 7 8 2 2 cm 5 8 1 6 cm OFFSET Screws 2 5 1 cm Fig B IT IS IMPORTANT TO HOLD THESE DIMENSIONS You have finished installing your door stiffeners BEGIN Center OO vertically on the left door in the door opening flush with the edge of door Fig A 1 FINISH 4 Repeat Steps 1 2 to install OO on right door 3 Secure using 5 2 screws through outside trim into OO Fig B 2 ...

Page 56: ...or stiffener BEGIN 1 2 Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit You have finished preparing your door for door handle FINISH 3 1 3 4 4 4 cm 35 3 4 90 cm RIGHT DOOR 1 2 1 3 cm SIDE VIEW Fig B Flush ...

Page 57: ...1 4 x2 1 1 4 x2 Handle locking with Screws x1 x4 3 4 Tech Screw with drill point 1 1 4 x8 3 Point Door Locking Mechanism RIGHT DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws 1 1 4 Pan Head Screw 1 3 4 4 4 cm 35 3 4 90 cm 1 2 1 3 cm SIDE VIEW Secure backplate with 1 screws and handle with 1 1 4 screws as shown ...

Page 58: ...g locations of brackets and plates 3 4 Tech Screw Washer Washer UPPER BRACKET with offset Orient bracket as shown Orient bracket as shown LOWER BRACKET without offset Washer 3 4 Tech Screw Plate 1 1 4 Pan Head Screw Washer Plate 1 1 4 Pan Head Screw ...

Page 59: ...57 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR IMPORTANT This rod to edge of door Make sure rods are straight up and down when locating brackets BOTTOM of Door ...

Page 60: ...58 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor PLATE FRAMING PLATE FLOOR VERTICAL RODS Drill with 3 8 bit to 2 depth ...

Page 61: ...s Maintain equal distance on both sides of door Do not fully tighten screws 2 Approximately 1 2 5 cm EQUAL EQUAL 2 Screws per window You must caulk around windows to validate warranty 3 4 1 9 cm x6 Apply high quality exterior grade caulk behind frame near edge before installing to seal window 2 Screws per window HINT Caulk behind frame near edge before installing ...

Page 62: ...wn Position EY at ends and in between window frame as shown Secure using 8 2 finish nails Remove 1 1 4 screws Position BSA centered on window frame as shown Secure using 4 2 finish nails x4 19 32 x 2 1 2 x 9 1 5 x 6 4 x 22 9 cm EY x19 EY x4 26 1 2 78 7 cm Centered Remove screws Remove screws Mark Center Flush Flush BSA Centered 3 4 1 9 cm BSA Centered FRAMING BEYOND FRAMING BEYOND ...

Page 63: ... 1 9 cm 6 You have finished installing your window FINISH 7 Install 12 3 4 screws from inside as shown Do not screw into window flange FRAMING BEYOND INSIDE OF SHED Install 3 4 1 9 cm screws from inside Install 3 4 1 9 cm screws from inside ...

Page 64: ...el 42 1 2 Fig A Center JFA with panel seam Level and secure with 4 2 finish nails Mark center of window frames as shown 2 Screws 2 Finish Nails x2 Window 16 1 4 x 22 1 4 41 3 x 56 5 cm CENTER CENTER PARTS REQUIRED SIDE WINDOWS x8 2 5 1 cm CENTER CENTER 2 5 1 cm x4 Caulk behind frame near edge Fig A JFA 42 1 2 108 cm 42 1 2 108 cm x1 19 32 x 2 1 2 x 41 1 4 1 5 x 6 3 x 104 8 cm JFA ...

Page 65: ...ith JFA Secure with 3 2 finish nails Center ZZ between windows and flush with JFA Secure with 3 2 finish nails PARTS REQUIRED SIDE WINDOWS 2 5 1 cm x13 FINISH 8 You have finished installing your side windows CENTER CENTER JFA ZZ CY CY CY JFA JFA Flush Flush Flush 2 Finish Nails 2 Finish Nails 2 Finish Nails Position JFA flush with CY Secure with 4 2 finish nails Flush Flush ...

Page 66: ...1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure using 1 2 1 3 cm screws You have finished installing your vents x12 1 2 1 3 cm x2 8 x 16 20 3 x 35 6 cm 6 15 2 cm 3 5 7 6 12 7 cm 14 35 6 cm Caulk 4 10 1 cm Caulk 4 10 1 cm 4 10 1 cm 14 35 6 cm 6 15 2 cm VENTS ...

Page 67: ...rovided by manufacturer Follow directions provided by manufacturer You must install drip edge to validate warranty PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place 3 OVERLAP Flush Flush You must install roof felt to validate warranty Drip Edge flush to trim Install drip edg...

Page 68: ...Install first starter row upside down color up and flush to drip edge at bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck Begin where indicated on image below install first row of shingles with notch flush with drip edge 2 2 Drip Edge Notch BACK OF SHED START HERE BACK OF SHED TABS UP BEGIN Shingle overlaps roof dec...

Page 69: ... shed make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at front roof edge cut to roof edge with a utility knife 1 2 5 cm 5 12 7 cm 5 12 7 cm or less BACK OF SHED Flush with rain slots Notch Notch Using your shingle hooked blade carefully cut shingles along chalk line 3 5 4 6 SHINGLES continued If more than 5 to rain slot you must install another row of ...

Page 70: ... with 1 overhang over roof edge Align remaining shingles with edge of the front drip edge Using your shingle hooked blade carefully cut shingles on a flat surface along the rain slots using a chalk line for reference You have finished shingling your roof FINISH 10 7 9 8 ...

Page 71: ...nt and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exteri...

Reviews: