background image

Summary of Contents for HOME-ESS-HV-5.3K

Page 1: ......

Page 2: ...sal of the products shall be carried out in accordance with the user manual relevant contract or relevant laws and regulations The products services or features you purchase are subject to the commerc...

Page 3: ...ss 9 2 9 EU Declaration of Conformity 9 3 Product Description 10 3 1 Product Description 10 3 2 Interface Description 15 3 3 Product Parameters 16 4 Installation 17 4 1 Installation Note 17 4 2 Instal...

Page 4: ...ance etc Unauthorized changes or modifications to the product are not permitted any unauthorized changes will void the HOME ESS HV 5 3K warranty and Hanchu ESS will not be liable for any damages cause...

Page 5: ...es the battery outside the scenarios specified by us including but not limited to connecting of excess loads mixing with batteries with different rated capacities or with other batteries Damage to the...

Page 6: ...ductor surface or terminal to verify that there is no risk of electric shock Repair the scratches that occur during equipment transportation and installation in time It is strictly forbidden to expose...

Page 7: ...ll the battery in a sheltered place or install an awning over it to avoid direct sunlight or rain Install the battery in a clean environment that is free from sources of strong infrared radiation orga...

Page 8: ...ents or areas This prevents damage of the insulation layer of the cables When the temperature is low violent impact or vibration may damage the plastic cable sheathing To ensure safety comply with the...

Page 9: ...if accidental grounding occurs 2 6 Battery Safety Do not expose batteries at high temperatures or around heat generating sources such as sunlight fire sources transformers and heaters The battery may...

Page 10: ...of the applicable EU directives Observe the documents Observe all documents supplied with the system Disposal Do not dispose of the system together with household waste please contact Hanchu service p...

Page 11: ...rubber gloves gas masks and protective clothing Electrolyte is corrosive and can cause irritation and chemical burns In case of direct contact with the battery electrolyte do as follows Inhalation Eva...

Page 12: ...eep away from the batteries to avoid skin irritation and chemical burns Dispose of used batteries in accordance with local laws and regulations Do not dispose of batteries as household waste If the ba...

Page 13: ...hu combiner box 3 1 Product Description 3 1 1 System Composition The battery system which consists of a Battery energy Distribution Unit BDU for short battery modules and a base can store and release...

Page 14: ...me energy storage 2 Voltage strength HV High Voltage 3 Battery system sizes 15 9 63 6K The battery system capacity is 15 9 63 6KW h The model of a BDU is HOME ESS HV 5 3K BDU Figure 2 Name of the BDU...

Page 15: ...ME ESS Home energy storage 2 Voltage strength HV High Voltage 3 Battery module sizes 5 3K The battery module capacity is 5 3KW h 3 1 3 Usable Energy Description The battery system supports capacity ex...

Page 16: ...g Energy Clean And Affordable 13 A max of 4 battery systems can be parallel connected in one energy storage system Figure 5 Diagram of Energy Storage System Note Ensure that the usable energy of each...

Page 17: ...eight This manual will show you the installation and electrical connection of 4 battery modules Table 5 Product Dimension And Weight Width Depth Height Weight BDU 650mm 330mm 183mm 13 5kg Battery modu...

Page 18: ...HOME ESS HV 5 3K Empowering Energy Clean And Affordable 15 3 2 Interface Description Figure 4 Interface Location Chart Figure 7 Battery Interface Description...

Page 19: ...5 4 Module configuration 3 12 parallel 16strings 3 12 P16S 5 Nominal voltage V 51 2 6 Operating voltage range V 43 2 57 6 7 Nominal Energy Wh 5324 8 8 Nominal discharge current A 40 9 Max discharge cu...

Page 20: ...injured Complying with local laws regulations standards and directives 4 1 2 Installation Environment Please make sure the installation location meets the following conditions The building is designed...

Page 21: ...tem can be installed on the ground Don t install the battery system at inclined horizontal or upside down positions Figure 9 Sample of Installation Directioon 4 1 4 Installation Space Leave enough spa...

Page 22: ...in case the module is accidentally dropped during installation Figure 11 Personal Protective Equipment 4 2 2 Installation Tools Tools needed in the process of installing equipment more effective to i...

Page 23: ...itive pole between the battery system and the inverter E Power cable 3 Optional Connector at both ends black 1200mm 1 Connect the negative pole between the battery systems F Power cable 4 Optional Con...

Page 24: ...n device below 30MHz near the equipment make sure that the equipment is at least 30m far away from the wireless device Step 1 Locate drill holes in the wall Locating drill holes in the wall using the...

Page 25: ...on the right Figure 15 Sample of Step 3 Step 4 Install the anti tipping bracket 1 There are threaded holes on the back of the BDU Using the M4x10 screws to install the anti tipping bracket 1 the short...

Page 26: ...y and the inverter should be no less than 400mm Figure 18 Sample of Step 6 Note 1 High voltage products of different models cannot be mixed and stacked High voltage stacked modules must be of the same...

Page 27: ...nition a DC positive output port b DC negative output port c BAT OUT Parallel communication port d BAT IN Parallel communication port e PCS Inverter communication port The communication port pins are...

Page 28: ...powering Energy Clean And Affordable 25 4 4 2 System General Wiring Diagram The electrical connections of a single battery system are shown in Figure 20 Figure 20 System General Wiring Diagram of a Si...

Page 29: ...ESS HV 5 3K Empowering Energy Clean And Affordable 26 The electrical connections of the parallel battery system are shown in Figure 21 Figure 21 System General Wiring Diagram of the Parallel Battery S...

Page 30: ...Optional 5 Power cable 4 Connect the positive pole between the battery systems Red 1200mm Delivered with the product Optional 6 CAN communication line 1 Connect the communication interface between ba...

Page 31: ...stems Figure 24 Sample of Power Connections Between Battery Systems 4 4 6 Power Connections the Primary Battery System With the Inverter After the battery system is connected connect the negative pole...

Page 32: ...the CAN Communication Cable 2 Use the CAN communication cable 2 to connect the battery system in sequence through the CAN protocol Figure 27 Sample of Connecting the CAN Communication Cable 2 Note The...

Page 33: ...ter status is normal The master cluster BDU will automatically recognize the number of battery clusters in parallel connection and assign addresses The one connected to the inverter is the main cluste...

Page 34: ...ation Please tap the button to add devices to your station as shown in Figure 30 Figure 29 Figure 30 Step 3 Batteries on line Click on the WIFI menu on the battery display select the WiFi network you...

Page 35: ...Enjoy smart energy After completing the above steps you can view the battery data in HanchuESS app upgrade the battery online select the inverter protocol as shown in Figure 32 34 and more smart funct...

Page 36: ...the inverter Battery system protocol selection Select the interface and communication protocol that matches the inverter on the APP of the battery protocol options include HANCHU Pylon Luxpower SOFARS...

Page 37: ...e main page of the display can show common operating status data such as voltage SOC temperature charge discharge current NOTE The current data will shown as above Figure 35 when the system is chargin...

Page 38: ...nd click Confirm When the connection is successful a WiFi signal appears at the top of the home page of the display Figure 37 WIFI Options Screen Details OTA Touch the OTA option in the menu bar the d...

Page 39: ...urrent system faults and also allows you to read and view problems that have occurred in the recent operation of the battery system Figure 39 OTA Options Screen Details 4 7 3 Other features about the...

Page 40: ...nnected Internal communication Errors Communication between battery groups is interrupted Check that the communication cables between the parallel battery clusters are correct and well connected Over...

Page 41: ...ry voltage sensor failure Please contact Hanchu ESS after sales service company or your dealer directly TempSensor Fault Battery temperature sensor failure Please contact Hanchu ESS after sales servic...

Page 42: ...torage temperature an irreversible capacity loss of lithium batteries is 3 10 The batteries should be stored in accordance with the labels on the packaging box and should not be inverted or placed sid...

Page 43: ...not provide appropriate warranty service for permanent battery failure due to improper storage by the customer 6 4 Battery Maintenance Safety Requirements When the equipment is running a high voltage...

Page 44: ...and required precautions Please use the same type of cell when replacing cells After maintenance immediately check that no tools or other parts have been left inside the equipment If the equipment has...

Page 45: ...42...

Reviews: