background image

97884C (Rev. A - 3/06)

PAGE 1

RC8AQ*A     RC12AQ*A

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

Halsey Taylor Owners Manual

Fully-Recessed Barrier-Free Water Cooler

INSTALLER

To assure you install these models easily and correctly,
PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE
INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH PLUMB-
ING, ELECTRICAL, AND OTHER APPLICABLE CODES. After
installation, leave these instructions with the Water Cooler for future reference.

RC

RC W/CUP DISPENSER

FIG. 1

FIG. 2

IMPORTANT! INSTALLER PLEASE NOTE.

THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER
LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY
FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING
AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE
WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED. ANY DRAIN
FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE
FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.

1/4" O.D. TUBE WATER INLET TO COOLER

SERVICE STOP
(NOT FURNISHED)

NOTE:  WATER FLOW DIRECTION

BUILDING WATER INLET

3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY

Summary of Contents for RC8AQA

Page 1: ...NT INSTALLER PLEASE NOTE THE GROUNDING OF ELECTRICAL EQUIPMENT SUCHAS TELEPHONE COMPUTERS ETC TO WATER LINES ISA COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILD...

Page 2: ...cup dispenser model without glass filler plumbing continue with step no 5 4 Cup dispenser Models Install rough plumbing to cup dispenser See Fig 15 for location of waste water outlet 5 Cut plastic ti...

Page 3: ...sted to meet local codes see Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT CHILLER WAT...

Page 4: ...MAYRESULT See Fig 8 Make connections between remote chiller outlet tube and fountain Outlet port is marked on the chiller 1 4 O D copper tube Install a 1 4 x 1 4 union provided on the marked chiller...

Page 5: ...ll lower stream height For best adjustment stream height should be approxi mately 1 1 2 38mm above the bubbler guard See Fig 6 12 Connect refrigeration unit to electrical supply and check for proper o...

Page 6: ...Rev A 3 06 RC12A TO BUBBLER CHILLER OUTLET 20 16 23 FIG 8 FIG 9 FIG 10 TO BUBBLER CHILLERINLET CHILLEROUTLET 20 24 23 9 TO GLASSFILLER TO BUBBLER CHILLERINLET CHILLER OUTLET 20 16 25 20 CHILLER INLET...

Page 7: ...waste bin 2 Shim along the bottom and side of cup dispenser as required to obtain a good alignment with previously installed drinking fountain Be sure to check for proper operation of access door befo...

Page 8: ...en adjusted to meet local codes see Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT CHIL...

Page 9: ...suspend cup dispenser via the mounting slots be sure to shim along bottom edge to bear the weight of the cup dispenser 6 Secure cup dispenser in place Use lag screws or bolts as required by wall cons...

Page 10: ...12 Disp Cup w GF Provisions See Fig 11 Assy Valve Push Back Nut Hex Gasket Gasket Drain Gasket Slip Nut Nut Hex Strainer Plate Tailpipe 1 1 4 x 4 Nut Slip 1 1 2 Plug Drain 1 1 2 GF Tube for 14700 Dis...

Page 11: ...been adjusted to meet local codes See Step No 1 of installation instructions height dimensions must be adjusted accordingly LEGEND A 1 4 O D TUBE CONNECT CHILLER WATER OUTLET B 3 8 O D TUBE CONNECT C...

Page 12: ...sy Bubbler 8880 Fitting Union 1 4 Fitting Union 1 4 x 3 8 Fitting Tee 1 4 Sound Dampening Pad TROUBLE SHOOTING AND MAINTENANCE Orifice Assy Mineral deposits on orifice can cause water flow to spurt or...

Reviews: