manualshive.com logo in svg
background image

 

 

VISUAL INSPECTION CONDITION REPORT 

Review Date May 16 

 

 

Page 

1

 of 

7

 

 

Equipment Number 

 

Customer 

 

Dispatch/Receipt 

Date Out          /     / 

Date In          /     / 

Store Location 

 

Expected Return Date 

 

 

Item 

Number 

Number 
of items 

Item name 

Checked 

OUT 

Checked 

IN 

Comments 

1.   

Base 

 

 

 

2.   

Support Post

 

 

 

 

3.   

Hopper 

 

 

 

4.   

J-Bin Attachments 

 

 

 

5.   

Utility Box 

 

 

 

6.   

Hose 

 

 

 

7.   

Clamp & Pulley System 

 

 

 

8.   

Circular Clamps 

 

 

 

9.   

Documentation (17 pages) 
7 pages – Operating and 
Safety Instructions 
10 pages – Installation 
Manual 

 

 

 

 

This equipment has received an in-service inspection and was found to have no obvious defects. 
 

 
CHECKED OUT BY 

 

 

 

 

CHECKED IN BY 

 
Name:   

 

 

 

 

 

Name: 

 
Signature: 

 

 

 

 

 

Signature: 

 

Comments: 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELCO

ROCK

®

 FILLING FRAME & J-BINS 

2.5m

3

 Sand Containers 

Содержание ELCOROCK FILLING FRAME

Страница 1: ... Base 2 1 Support Post 3 1 Hopper 4 2 J Bin Attachments 5 1 Utility Box 6 1 Hose 7 1 Clamp Pulley System 8 2 Circular Clamps 9 1 Documentation 17 pages 7 pages Operating and Safety Instructions 10 pages Installation Manual This equipment has received an in service inspection and was found to have no obvious defects CHECKED OUT BY CHECKED IN BY Name Name Signature Signature Comments ELCOROCK FILLIN...

Страница 2: ...ponsibility At the conclusion of the use of the equipment please clean the equipment repack it for transportation and return to Geofabrics Please advise if there are any missing parts All equipment usage must be in accordance with Geofabrics Hire Agreement You will be charged for any damaged or missing components ELCOROCK FILLING FRAME J BIN OPERATING AND SAFETY INSTRUCTIONS WARNING Any alteration...

Страница 3: ...nsidered a construction activity the contractor using the hire equipment must prepare and implement a site safety plan that incorporates the safe work methods for high risk work involving ELCOROCK Filling Frame and J Bins Including the potential need to work at height on the equipment Safety Precautions and Working Techniques As the ELCOROCK Filling Frames and J Bins are utilised in conjunction wi...

Страница 4: ...e personnel or the public Filling Process Filling should be conducted as per the ELCOROCK Installation Guidelines for 2 5m3 Containers Warning If there is a need to work from height on the ELCOROCK Filling Frame and J Bins this needs to be taken into account by the contractor s site safety plan Refer to the Health and Safety provisions in Employment Act 1992 regarding the need to take all practica...

Страница 5: ...ONENTS The ELCOROCK Filling Frame and J Bins consists of a free standing hopper complete with two J Bin cradles Fig 3 4 5 and is accompanied by 2 J Bin attachments Fig 7 a number of smaller components are also included to set up the filling frame and bins To ensure no parts are lost all components should be stored and transported as a set in such a way as not to cause damage to the equipment Fig 2...

Страница 6: ...t to amend product documentation without notice and customers are requested to check as to the validity of the documentation they are using Review Date May 2016 Page 6 of 7 Figure 6 Figure 8 Figure 10 Figure 12 Figure 11 Figure 7 ...

Страница 7: ...ley system Circular clamps Hose Fig 10 Check the hose is not damaged Clamp Pulley System Fig 11 Check the clamp is not bent Check the rope is not frayed or damaged Circular Clamps Fig 12 Check the clamps not bent or damaged Check the fastening mechanism functions correctly Check the clamps open and close around the filling ports effectively Geofabrics New Zealand Ltd 14 Goodman Place P O BOX 12536...

Отзывы: