manualshive.com logo in svg
background image

 

GE Zenith Controls, Inc. 

 

 830 West 40th Street Chicago, IL 60609  / Telephone: (800) 637-1738 

 

 

 

 

 

rev 9-5-2012 

GE Digital Energy 
Power Quality 

 

General Electric LP11-U UPS Startup Checklist 

 

 

The purpose of this startup checklist is to eliminate any problems during system startup due to 
incorrect wiring or installation. It is recommended that the entire installation / user manual be 
reviewed prior to installation and operation.  The LP11-U UPS can be configured either by the 
customer or contractor by following all safety precautions.  If onsite startup support is required 
for any reason, this pre-startup checklist must be completed before a GE technician can be 
scheduled to perform the start up or support of the UPS system. 
 

***Very Important Notes*** 

 
 
Note 1 – Battery fuse:  

 
The GE LP11-U UPS battery fuse is located in the bag taped to the top of the UPS along with 
the system manual and a jumper used to configure the output of the UPS.  A sticker on the bag 
states "DO NOT DISCARD". Secure the fuse and jumper in a safe location and provide to the 
GE field engineer for system startup. Please notify GE Power Quality Service immediately if the 
fuse or jumper are missing.  UPS cannot be started without the battery fuse.  

 

Note 2 – UPS Input / Output: 

The GE LP11-U UPS is delivered as 208vAC input and 208vAC 

output unless otherwise ordered.  To modify the input and output voltages there are both 
mechanical and electronic modifications that must be performed. 

 
Note 3 – External Maintenance Bypass: 

The LP11-U UPS has an internal single phase 

transformer that caused a phase shift between the input and output voltage.  If an external 
maintenance bypass is to be utilized, a single phase transformer must be installed in the 
maintenance bypass path to compensate for this phase shift.  Contact GE prior to installing an 
external maintenance bypass. 

 
Note 4 – LP11-U UPS units in parallel: 

Parallel units should be ordered in this configuration so 

they can be tested prior to shipment to the site.  If field installation is required, it is 
recommended that this be performed by a qualified GE technician. 

 

Date:   _______________________ UPS Serial #s:   

 

 

 

 

 

 

 

 

Company Name: 

 

 

 

 

 

 

 

 

 

Address: 

 

 
 

 

 

 

Principal contact:  

 

 

 

 

 

 

 

 

 

Principal’s e-mail Address:     

 

 

 

 

 

 

 

Principal’s phone number:     

 

 

 

 

 

 

 

Installing contractor:    

 

 

 

  phone #: 

 

 

 

 

Отзывы: