background image

VICTORIAN ASSEMBLY 

INSTRUCTIONS

Exaco 

VI 46

Version 201

6

_1.1

Summary of Contents for VICTORIAN VI 46

Page 1: ...VICTORIAN ASSEMBLY INSTRUCTIONS Exaco VI 46 Version 2016_1 1...

Page 2: ...solid packed surface with concrete anchors in the corners The solid concrete foundation should be deep enough to get a solid and frost free ground The greenhouse should be anchored securely and the an...

Page 3: ...se note You have a VI46 H46 greenhouse This section lists the parts for a standard greenhouse but does not include all pieces for optional accessories You may have parts in addition to what is listed...

Page 4: ...profile of sliding door Horizontal Profile Turning Door Side profile Turning Door Hanger for Sliding Door Gable Profile Top Shelf Vertical Glazing Bar Curtain Rail Gutter Profile Bottom guide for sli...

Page 5: ......

Page 6: ...VI 46 3840 mm 151 3 16 in 12 7 3 16 6060 mm 238 9 16 in 19 10 9 16 Note Do not set concrete in the corners until the entire frame is complete You may need some play to install the crosspieces...

Page 7: ...60 3100 3820 4580 5318 6060 C 794 1533 2273 D 1512 E 794 1533 2273 A C D E 263 463 663 1088 H A B A B H 200 400 600 1025 Version 1 Version 2 10 This page applies when you build on a stem wall with a d...

Page 8: ...Note Before assembling the foundation insert 3 M6x15 bolts as shown for the sliding door guide See page S1 Suggestion If the unit is to be installed on a concrete foundation you will need to cut PRO21...

Page 9: ...Insert bolt in each upright on the side where the top shelf will be located Insert bolt in corner of front and back wall for Seed Tray See page ZB2 and SC1...

Page 10: ......

Page 11: ...ll the L1 corner wind braces shown on page H10 Note If you have purchased shade curtains insert the loops into the gutter profile before this assembly step This is shown below 28 Loops per curtain 1 T...

Page 12: ...to each PRO1456 upright here for the louvre window See page LR1 Note Louvre window can be placed in any section Insert bolt in each upright on the side where the top shelf will located Refer to page...

Page 13: ...f supports Pg H9 3 for misting system Pg H14 Insert bolts to connect short uprights gable braces to the PRO6918 You will need as many bolts as you have short uprights Use the longer bolts supplied in...

Page 14: ...d time to install the roof braces Refer to page H10 Note If you have purchased curtains now is a good time to install the curtain rails Refer to page SD1 Note Add one bolt per end for the roof support...

Page 15: ...Note Roof window can be installed in any bay Note When installing the roof uprights make note of which bays will have roof windows and insert a bolt for the connection plate...

Page 16: ...Note Ends of support tube will need to be bent to fit Attach the lower end and adjust the top until it fits flush...

Page 17: ...Note Wait until assembly is complete before attaching the diagonal roof braces to the roof uprights For sidewall braces For roof braces...

Page 18: ...Note You may receive these supports for your VI46 or the ones seen on the next page...

Page 19: ...to that length to brace it up while installing supports You may need to use a drill to create a notch in which to insert neccesary bolts Please do this between where the two bolts will sit so it will...

Page 20: ...below Note The gutter down pipe is attached to the base of the greenhouse with a screw that goes through the back of the elbow First drill a small hole in the back of the elbow and then a small hole i...

Page 21: ...s supports slide in from the end of the gutter profile to support to support the bottom of the glass The supports should be spaced 100mm or 4 inches from each roof profile Roof Glass Support Installat...

Page 22: ......

Page 23: ...o either side of the glass with a dab of silicon Then install the rubber trim Polycarbonate units will not use these shims Glazing Shim Installation Note Glazing shims are only installed in the end pa...

Page 24: ...nstall crescent seal along side walls Note These trim plates are set in place with a dab of silicon and then the crescent seal is installed over them PRO 6918 End bar roof On either side of ridge prof...

Page 25: ...carbonate units only As shown below the blue transport tape is removed and replaced with a U profile The grey tape remains at the top to prevent contamination from dirt The U profiles are not used in...

Page 26: ...This page applies when you have a dropped door kit on a stem wall...

Page 27: ...Sliding Door 1 2 3 Note If you have a double sliding door install this screw 1 inch from the end...

Page 28: ...Brush seal Note Rubber seal is installed on the sides of the door If you have two slidings doors the brush seal will only be installed on the outside edges Sliding Door Glass...

Page 29: ...ding Door Note Apply upwards pressure when installing the door support in red Note Use washer underneath door hanger to level the door if need be Add L bracket to close the gap between the doors when...

Page 30: ......

Page 31: ...louvre frame and the greenhouse upright at all four bolt locations Note If your model is equipped with the louvre vent automatic opener please refer to the Installation and Care manual packaged with t...

Page 32: ...Louvre Vent Squeeze black framing together to secure the glass Note Install washer between black louvre frame and the greenhouse upright at all four bolt locations...

Page 33: ...1 inch long bolt Note 1 inch long bolt is inserted into the lower profile This bolt is for the manual opener or if equipped the spindle opener Note Rubber seal is only installed on the sides of the r...

Page 34: ...part on the top of the roof window will slide into a groove in the roof beam shown below Note Inserting a bolt on either side of the roof window will prevent it from moving side to side Manual Opener...

Page 35: ...o the roof crossbar for the lower mount The upper mount will clamp onto the lower roof window framing profile As shown in the diagram below The automatic opener comes with its own instructions and car...

Page 36: ...for level then mark and drill the second screw hole Now slide the brass part of the opener over the screw that you locked in place on the crossbar Use the supplied nylock nut to secure the opener on...

Page 37: ...system should be hung with bolts as shown to the left The hangers will need to be bent into position If there are no curtains the misting system can be hung by drilling holes and hooking the hangers...

Page 38: ...y fifth hole Suggestion If you forgot to insert the curtain loops you can drill a hole as shown and slide them in 1 Locking loop Note For models over 12ft you will need to connect the curtain rails to...

Page 39: ...le three sides of the seed tray Note Make sure to slide 1 bolt into the bottom of the front and back seed tray profiles 2 for a Vi46 2 Slide the shelving inserts in from the open end Note The last she...

Page 40: ...t for you 5 Attach the seed tray to the uprights with self tapping screws If you do not have self tapping screws drill a small pilot hole and use regular screws Note If you have forgotten to insert th...

Page 41: ...ggestion Use a small strip of tape under each bolt to hold it in place This will make the shelf installtion a bit easier Tape shown as red dotted line The shelf can be installed at your desired height...

Page 42: ...8 B 2500 Lier Belgium T 32 15 30 67 80 W www janssens alusystems be E info janssens alusystems be Customer Service or Assembly Questions Give us a call Toll free 1 877 760 8500 customerservice exaco c...

Reviews: