background image

energiSava® 500

INSTALLATION GUIDE FOR ENGINEER / INSTALLER

Summary of Contents for energiSava 500

Page 1: ...energiSava 500 INSTALLATION GUIDE FOR ENGINEER INSTALLER...

Page 2: ...24AWG Stranded Tinned Copper 11 Control communication cables should not be placed within 50mm or on the same metal cable tray as any 230V lighting or power cables 12 Ensure all cable glands are fully...

Page 3: ...f should be insulated or a condensate trap should be fitted just below roof level 5 Ducts within the building heated envelope between the external terminals and the unit sFromAtmosphereandToAtmosphere...

Page 4: ...Auto Setback Speed 7 Continuous Speed 7 Boost Speed with Overrun Timer 7 Status Indicator Boost Alert 8 Summer Bypass 8 Summer Kick Up Mode 8 Automatic Frost Protection 8 Integrated Humidity Sensor 8...

Page 5: ...efore being ducted to the outside Fresh air is drawn into the unit from outside which is warmed by the heat exchange cell and delivered into the living dining and bedroom areas Packaging Contents Insp...

Page 6: ...difficult for maintenance and repair The unit MUST be mounted level front to back and side to side 1 Mark a horizontal line on the wall using a spirit level This line will be approximately 330mm below...

Page 7: ...nsuring it is pushed over the lip and aligned with a screwdriver access hole to enable tightening of the hose clamp 2 Insert 22mm O D PVC pipe into condensate drain socket up to the stop no more than...

Page 8: ...t speed increases the extract and supply air flow Boost speed is configured with step less independent fan controls and includes an overrun timer variable between 0 and 60 minutes The boost speed can...

Page 9: ...ink wire will enable summer kick up mode When summer kick up mode is trigged by summer bypass the increased fan speed can be prevented either manually or automatically Manual This is by means of a vol...

Page 10: ...and Controls Status Indicator Mains cable must be separate from the communication cables See Important Information Supply wiring diagram 230V Connection at indicator Connection at unit L N 12V A B 0V...

Page 11: ...HR There is maximum of 10 single pole switches or humidistats that can be used To Boost using switch live a relay is required SWHT BOXRELAY Momentary Boost switch SWHT BOOST M Volt free setback switch...

Page 12: ...inuous speed and boost speed are programmed by placing the controller into program mode via the program run switch and changing the position of the rotary potentiometers When applying power for the fi...

Page 13: ...n program run switch to centre position to exit commissioning For the commissioning settings to be stored the unit needs to be powered up Continuous Supply Extract Speeds Move program run switch to co...

Page 14: ...from the run position to the continuous position from the continuous position to the boost position and back to the run position To ensure that the reset switch movements are registered by the control...

Page 15: ...or best results 1 Slide out filters fitted either side of heat exchanger 2 Carefully remove any dust from face of heat exchanger interior of the unit and the bypass using a vacuum cleaner Do not use w...

Page 16: ...tion press hold the reset switch with a ball point pen or similar object for 10 seconds The switch is located behind the small hole in the front of the status indicator All lights will momentarily be...

Page 17: ...out charges may apply if a fault cannot be identified Supply Only If your product has been supplied by EnviroVent and installed by a third party it is covered by a two year parts only warranty If you...

Page 18: ...17 energiSava 500 SHOULD YOU ENCOUNTER ANY PROBLEMS INSTALLING THIS UNIT CALL US ON 0345 27 27 810 Serviced By Company Date Notes Service Record...

Page 19: ...it or the package indicates that disposal of this unit after its lifecycle could harm the environment Do not dispose the unit as unsorted municipal waste it should be disposed by a specialized company...

Page 20: ...read carefully to ensure simple installation and a long trouble free life for the user Delivering innovative and sustainable ventilation solutions worldwide EnviroVent Ltd EnviroVent House Hornbeam B...