background image

Zhejiang Envertech Corporation Ltd. 

Tel

+86 579 8926 6326

  Email

[email protected]

 

    Add:24th Floor, Jintong Mansion,
      Center of Headquarters, Yongkang City,
         Zhejiang Province, China 

User Operating Manual

Model Number: EnverBridge

This manual is an integral part of the unit. Please read the instruction 

manual carefully before installation, operation or maintenance. Keep 

this instruction manual for future reference. This document is not to 

be reproduced in any manner, nor are the contents to be disclosed 

to anyone, without the express authorization of Envertech.

Summary of Contents for EnverBridge

Page 1: ...er Operating Manual Model Number EnverBridge This manual is an integral part of the unit Please read the instruction manual carefully before installation operation or maintenance Keep this instruction...

Page 2: ...id Connection 5 3 Grid Disconnect 5 4 Installation checklist 5 5 Start Up Checks 6 LCD Abstracts 6 1 Brief introduction 6 1 1 Function of LCD 6 2 LCD 1602 interface 6 2 1 Start up interface 6 3 Monito...

Page 3: ...ruction DANGER The DANGER symbols in this manual and on the EnverBridge Indicate a hazard with a high level of risk which if not avoided will result in death or serious injury CAUTION The CAUTION symb...

Page 4: ...not respond for any quality assurance and other risks For Envertech EnverBridge Warranty Terms and Conditions see the appendix of this manual 3 4 PV PCS _ Caution risk of electric shock CE mark is at...

Page 5: ...t installed environments suitable for it s IP rating CAUTION The device is intended for fixed installation Located on a part that is not removable without impairing the operation of the unit CAUTION V...

Page 6: ...07mm 3W 700g Natural convection no fans 40 65 IP65 CE 5 Years 7 8 Use the Power Line Carrier Communication PLCC technology within Photovoltaic power plant By PLCC technology EnverBridge collects gener...

Page 7: ...inverter array is exported to the utility grid Fault If the system does not operate correctly Envertech EnverBridge will stop automatically and enter into Disable mode The Envertech EnverBridge syste...

Page 8: ...these tests The data should be recorded in an equipment log If the device is not operating properly or fails any test the device has to be repaired 1 Inspect the equipment and accessories for mechanic...

Page 9: ...168 0 201 indicates a normal network connection and 192 160 0 254 indicates an abnormal network connection The figure of power efficiency which shows at the beginning of the second line indicates the...

Page 10: ...e the EnverBridge from the system Only trained and authorized professional personnel WHO ARE FAMILIAR WITH THE REQUIREMENTS OF SAFETY is allowed to perform servicing and maintenance work 6 5 Applicati...

Page 11: ...nverBridge Wear gloves and safety glasses Disconnect the EnverBridge from the Grid Isolating device Clean the EnverBridge with wet cloth carefully Introduction Use the monitoring website EnverPortal d...

Page 12: ...ill the EnverBridge serial Number in the blank space for example 90000001 click OK and finish the registration 19 20 9 Contact Zhejiang Envertech Corporation Ltd Tel 86 579 8926 6326 Email info envert...

Reviews: