background image

Planning the installation

TSE80 requires a minimum mounting depth of 
22mm from the front wall surface plus room for 
cable/s. Power is supplied by Power Over Ethernet 
(PoE). PoE must meet the IEEE 802.3af standard. 
TSE80 connects to the local network via a hard 
wired Ethernet connection. 

Installation

TSE80 has been designed to mount to a US NEMA 
2 gang back box (Ref:  Eaton TSE80 Back Box). 

Installing the mounting frame

TSE80 includes a mounting frame that MUST be 
used for this installation.
Using the included screws mount the mounting 
bracket onto the back box and verify that the 
components are level before tightening the captive 
screws on the TSE80.

Mounting height

The recommend 
mounting height 
for the TSE80 is 
145 cm -165 cm 

above the finished 
floor to the center 

of the unit.

TSE80 - Colour Touchscreen

Installation guide

Overview

Mounting the TSE80

Align the mounting 
frame hooks with 
the TSE80 mounting 
slots and gently pull 
the TSE80 unit down 
the mounting bracket.
Make sure the mounting 
hooks are properly 
engaged.

Tighten the 2 captive screws 
to secure the TSE80 to the 
mounting bracket

Back Box

TSE80

Mounting Bracket

PoE and Data Connection (RJ45)

Reviews: