background image

600 A T-OP II™ terminator operation instructions

COOPER POWER

SERIES

Deadbreak Apparatus 

Connectors 

MN650047EN

Effective May 2017
Supersedes March 1995 (S600-12-1)

Содержание 600 A 35 kV Class Insulated Standoff Bushing

Страница 1: ...600 A T OP II terminator operation instructions COOPER POWER SERIES Deadbreak Apparatus Connectors MN650047EN Effective May 2017 Supersedes March 1995 S600 12 1...

Страница 2: ...OSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NO...

Страница 3: ...SCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY I SAFETY FOR LIFE III SAFETY INFORMATION III Safety instructions iii GENERAL 1 Equipment required 1 OPERATION 2 Isolating and grounding a cable requi...

Страница 4: ...d high voltage lines and equipment and support our Safety For Life mission Safety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow...

Страница 5: ...proceeds T OP II terminators should be installed and serviced only by personnel familiar with good safety practice and the handling of high voltage electrical equipment General Equipment required 1 Vo...

Страница 6: ...4 De energized cables Step 2 Determine that cables are de energized Remove 200 A protective cap or arrester from T OP II terminators using hotstick and set aside in a clean protected area Insert test...

Страница 7: ...orque tool clockwise to make the threaded connection turn until tight Remove O T Torque tool Figure 8 Move T OP II Terminator to insulated bushing Step 4 Provide a visible ground After securing cable...

Страница 8: ...ing Grasp pulling eye of the grounding elbow with shotgun pull firmly to remove elbow from the LRTP of the T body Set elbow aside in a clean area Grasp O T Torque tool with the shotgun and pull fully...

Страница 9: ...Instructions MN650047EN May 2017 Figure 14 Reinstall 200 a protective cap Repeat this procedure for all cables on both ends that were previously grounded Remove all tools grounds and personal protect...

Страница 10: ...600 A T OP II terminator operation instructions 6 Operation Instructions MN650047EN May 2017 This page intentionally left blank...

Страница 11: ...600 A T OP II terminator operation instructions 7 Operation Instructions MN650047EN May 2017 This page intentionally left blank...

Страница 12: ...nited States Eaton com cooperpowerseries 2017 Eaton All Rights Reserved Printed in USA Publication No MN650047EN May 2017 Eaton is a registered trademark All trademarks are property of their respectiv...

Отзывы: