background image

 

INSTALLATION INSTRUCTIONS 

1)

 

Contact your local council and ensure that your Aussie Plunge Pool is installed in a 
manner that meets the relevant local council regulations. 

2)

 

Prepare the site and install the Aussie Plunge Pool shell in accordance with the 
Duraplas installation sheet. 

3)

 

Install 

the skimmer box and return fitting as per the ‘Leaf Skimmer Instruction 

Manual’.

 

4)

 

Install the BlueBay pump and sand filter by following the step-by-step instructions 
provided. You will require 15kg of Quartz sand with a particle size of 0.4 

 0.8. This 

sand is available from Bunnings or your local pool shop. Install the sand as per the 
instructions supplied. 
The image overleaf will help show where to connect the hoses. 

5)

 

Ensure the required safety fences are installed correctly, any gates catches are child 
proof and operate correctly and that your pool complies with all your local council 
safety requirements. Ensure that your pool is registered as required and a CPR safety 
sign is fixed to the fence. 

6)

 

Fill your new Aussie Plunge Pool with water and check all hoses for leaks. Chlorinate 
your pool as required and regularly test the water. A test kit and chlorine are 
available from Bunnings or your local pool shop. 

7)

 

Enjoy many hours of fun and relaxation in your Aussie Plunge Pool.  

 

 

 

Reviews: