background image

DTC INST 145 issue 2 – 16.11.07 

Please retain this document for future use and 

reference. 

 

DLT TSM106 

INSTALLATION AND MAINTENANCE 

 

    

Guarantee 

 

Your product comes with a 5 year guarantee; this includes  
2 years parts and labour, with the following 3 years parts only, proof of 
purchase will be required. 
 
This guarantee is invalid if the product is misused, incorrectly installed, 
maintained or cleaned. 
 
Installation  
 
Installations should be carried out by a competent installer, who must 
after completion, check for leaks, from both the product and pipe work. 
 
All installations must be carried out in compliance with Water Bye Law 
Regulations, for further details contact your Local Water Authority. 
 
The product must be installed and used in such a way as not to cause 
water damage, therefore water from the product must be suitably 
directed and/or retained. 
 
Cleaning 
 
This product should be maintained using a clean damp cloth, do not use 
abrasive agents or materials on the product surface. 
 
For technical, installation, servicing advice and/or spare parts please 
call: 
 

CUSTOMER CARE LINE 

0800 1951602 

 

Deva reserves the right to change or improve the products described in any of its 

publications 

 

Summary of Contents for DLT TSM106

Page 1: ...tion check for leaks from both the product and pipe work All installations must be carried out in compliance with Water Bye Law Regulations for further details contact your Local Water Authority The product must be installed and used in such a way as not to cause water damage therefore water from the product must be suitably directed and or retained Cleaning This product should be maintained using...

Page 2: ...rmostatic mixing valves and temperature losses in metal baths It is not a safe bathing temperature for adults or children The British Burns Association recommends 37 to 37 5 C as a comfortable bathing temperature for children In premises covered by the Care Standards Act 2000 the maximum mixed water outlet temperature is 43 C Temperature Adjustment This should be carried out by a competent person ...

Page 3: ...ults once a year When commissioning testing is due the following performance checks shall be carried out NOTE The mixed water temperature at the terminal fitting must never exceed 46 c After installation the product and the pipe work must be checked for water tightness to ensure no leaks are present Once this has been carried out a cold water failure test should be completed to check the shut off ...

Page 4: ...tion flush the system thoroughly to remove any debris as this will affect the performance of the product Once flushed turn off the water supply either at the stopcock or at the isolation valves Place the gasket washer onto the top surface of the bath in line with the bath holes Then place the mixer onto the bath with the cold feed on the right and hot feed on the left Push the mixer tail through t...

Page 5: ... disc to the underside of the check valve followed by the retaining clip ensure that this clip sits inside the groove on the inside of the tail Product Operation To operate the mixer in bath mode ensure that diverter is in the up position then open both handles to allow water flow into the bath from the spout to control the temperature only turn the central temperature control to control the flow ...