Dell S5000 Series Servers for SAP HANA

Installation Guide

Regulatory Model: M3S2G8, M3UX16

 

September

 2022

Rev. A0

1

Summary of Contents for M3S2G8

Page 1: ...Dell S5000 Series Servers for SAP HANA Installation Guide Regulatory Model M3S2G8 M3UX16 September 2022 Rev A01 ...

Page 2: ...ht 2022 Dell Inc or its subsidiaries All rights reserved Dell Technologies Dell and other trademarks are trademarks of Dell Inc or its subsidiaries Other trademarks may be trademarks of their respective owners ...

Page 3: ...form the procedures described in this document Intended audience This document is intended for use by administrators and operators Related documents For the most recent product information documentation firmware updates software fixes and service offers see the Dell Technologies Support Site Preface Preface 3 ...

Page 4: ......

Page 5: ...Installing a S5408 Server 2 1 2 2 Installing a S5416 Server 2 8 2 2 1 Installing the Rails for the S5408 Server Assemblies 2 8 2 2 2 Installing the Rails for the Ubox es 2 14 2 2 3 Installing all the Chassis 2 18 2 2 4 Installing the 8 Module Connecting Box 2 26 2 2 5 Installing the UBox Components 2 33 Appendix A Installing a Lightened Server A 1 A 1 Removing all the Components from the Compute B...

Page 6: ......

Page 7: ... safety instructions before you perform the procedures described in this manual Multilingual Safety Notices Guide 1 1 Unpacking the Server Important Before unpacking the server inspect the server packaging for damage W020 WARNING W020 The server drawer must not be unpacked before it has reached the room temperature 24 hours in the computer room According to the server configuration the following i...

Page 8: ...label on the side of the server Model Name Commercial Name M3S2G8 S5408 server M3XU16 UBox 1 2 2 Identifying Server Modules Server modules are identified by an identification label The label gives the MAC address of the BMC embedded management controller Rear view The label is located inside a little drawer Primary Label Example ...

Page 9: ...Chapter 1 Checking the Delivery Contents 1 3 Secondary Label Example Front view A label is also available at the front behind the bezel ...

Page 10: ...electric shock D Multiple power sources symbol Caution The system has more than one power source which must all be disconnected before servicing to avoid shock hazard E ProtectivE conductor symbol Caution The system has a high protective conductor current The protective conductor PE should be connected first to main protective earthing terminal before connecting the line and neutral to avoid shock...

Page 11: ...Rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation Server Module Identification Label Rear view The label is located inside a little drawer ...

Page 12: ...e power supply cord Disconnect all power supply cords from the unit before servicing Proceed as follows 1 Power OFF the system 2 Switch OFF the site power breakers 3 Remove all power supply cords from the system Electrical Hazard Symbol Indicates risk of electric shock ...

Page 13: ...ust all be disconnected before servicing to avoid shock hazard D ProtectivE conductor symbol Caution The system has a high protective conductor current The protective conductor PE should be connected first to main protective earthing terminal before connecting the line and neutral to avoid shock hazard and a PE connection to the main PE terminal is essential before connecting the mains to avoid el...

Page 14: ...ncluding interference that may cause undesired operation UBox Onboard Battery Label C003 CAUTION C003 The onboard battery should be replaced regularly It must be replaced with the same or an equivalent type recommended by the manufacturer There is a danger of explosion if another type is used Dispose of used batteries according to the manufacturer s instructions UBox Power Supply Unit PSU Label Th...

Page 15: ... CAUTION C044 This unit has more than one power supply cord Disconnect all power supply cords from the unit before servicing Proceed as follows 1 Power OFF the system 2 Switch OFF the site power breakers 3 Remove all power supply cords from the system ...

Page 16: ......

Page 17: ...ver is delivered fully populated It is mandatory to use a lifting device to install it However it is possible to reduce the server weight by removing the components from the compute box See Appendix Installing a Lightened Server Required tools T25 Torx screwdriver Flat screwdriver Lifting device Nuts screws and washers See Appendix Nuts screws and washers Procedure 1 Prepare the rails 1 Loosen the...

Page 18: ...2 2 Installation Guide 2 Adjust the length of each rail 3 Tighten the screws of each rail ...

Page 19: ...Chapter 2 Installing the Server in the Rack Cabinet 2 3 2 From the front install the left rail ...

Page 20: ...2 4 Installation Guide 3 From the front install the right rail ...

Page 21: ...Chapter 2 Installing the Server in the Rack Cabinet 2 5 4 Install the server 1 Insert the server into the rack cabinet ...

Page 22: ... Installation Guide 2 Push the server until the front face is 5 cm from the rack cabinet edge 3 Insert two cage nuts in the rack cabinet frames for the upper server screws 4 Push the server until it stops ...

Page 23: ...Chapter 2 Installing the Server in the Rack Cabinet 2 7 5 Secure the server into place Tighten the four captive screws ...

Page 24: ...iver T25 Torx screwdriver PH1 Cross headed screwdriver Flat screwdriver Lifting device Nuts screws and washers See Appendix B Nuts screws and washers 2 2 1 Installing the Rails for the S5408 Server Assemblies Note There are two types of rails one for the DellS5408 server assemblies and one for the Ubox es Procedure 1 Prepare the rails 1 Loosen the screws of each rail ...

Page 25: ...Chapter 2 Installing the Server in the Rack Cabinet 2 9 2 Adjust the length of each rail 3 Tighten the screws of each rail ...

Page 26: ...2 10 Installation Guide 2 From the front install one left rail at the bottom of the rack rack slot 1 ...

Page 27: ...Chapter 2 Installing the Server in the Rack Cabinet 2 11 3 From the front install one right rail at the bottom of the rack rack slot 1 ...

Page 28: ...2 12 Installation Guide 4 From the front install the second left rail at the rack slot 14 Perform the same operations as when installing the first rail ...

Page 29: ...Chapter 2 Installing the Server in the Rack Cabinet 2 13 5 From the front install the second right rail at the rack slot 14 Perform the same operations as when installing the first rail ...

Page 30: ... Installing the Rails for the Ubox es Note There are two types of rails one for the DellS5408 server assemblies and one for the Ubox es Procedure 1 Prepare the rails 1 Loosen the screws of each rail 2 Adjust the length of each rail ...

Page 31: ...Chapter 2 Installing the Server in the Rack Cabinet 2 15 3 Tighten the screws of each rail ...

Page 32: ...2 16 Installation Guide 2 From the front install the left rail at the rack slot 9 ...

Page 33: ...Chapter 2 Installing the Server in the Rack Cabinet 2 17 3 From the front install the right rail at the rack slot 9 ...

Page 34: ...2 18 Installation Guide 2 2 3 Installing all the Chassis Procedure 1 Install the first S5408 server assembly at the bottom of the rack 1 Insert the assembly into the rack cabinet ...

Page 35: ... the Server in the Rack Cabinet 2 19 2 Push the server until the front face is 5 cm from the rack cabinet edge 3 Insert two cage nuts in the rack cabinet frames for the upper server screws 4 Push the server until it stops ...

Page 36: ...2 20 Installation Guide 2 Secure the server into place Tighten the four captive screws ...

Page 37: ...alling the Server in the Rack Cabinet 2 21 3 Install the empty UBox at the rack slot 9 1 Insert the UBox into the rack cabinet 2 Push the UBox until it stops 4 Secure the UBox in place Tighten the four captive screws ...

Page 38: ...2 22 Installation Guide 5 Install the second S5408 server assembly at the rack slot 14 Perform the same operations as when installing the bottom assembly ...

Page 39: ...r in the Rack Cabinet 2 23 6 Install the UBox alignment brackets The alignment brackets are used to fix the UBox to the S5408 server assemblies Rear view 1 If present remove the top and bottom PSUs on the left hand side of the UBox ...

Page 40: ...2 24 Installation Guide 2 Position the alignment brackets using the guide pin 3 Tighten the screws ...

Page 41: ...Chapter 2 Installing the Server in the Rack Cabinet 2 25 4 If required install the top and bottom PSUs on the left hand side of the UBox ...

Page 42: ...stallation Guide 2 2 4 Installing the 8 Module Connecting Box Procedure 1 Take hold of the new component 2 Remove the cover from the 8 module connecting box 1 Loosen the fixing pins A and the captive screws B ...

Page 43: ...Chapter 2 Installing the Server in the Rack Cabinet 2 27 2 Remove the cover using the handles C ...

Page 44: ...2 28 Installation Guide 3 Partially insert the 8 module connecting box into its location Watch out for the position of the 8 module connecting box Rear view ...

Page 45: ...Chapter 2 Installing the Server in the Rack Cabinet 2 29 4 Remove the shipping brackets Four brackets are installed for shipment and must be removed 1 Loosen the captive screws 2 Remove the brackets ...

Page 46: ...2 30 Installation Guide 5 Secure the 8 module connecting box in place 1 Push the 8 module connecting box completely in ...

Page 47: ...Chapter 2 Installing the Server in the Rack Cabinet 2 31 2 Tighten the captive screws A and fixing pins B ...

Page 48: ...2 32 Installation Guide 6 Install the cover 1 Install the cover using the handles C 2 Secure the cover in place by tightening the fixing pins A and the captive screws B ...

Page 49: ... label inside the PSU slot 2 Press the latch of the UBox PSU 3 Push the UBox PSU in using the handle 4 Release the latch to secure the UBox PSU in place 2 2 5 Installing the UBox Components Procedure 1 Take hold of the new component 2 Install all the UNB modules For each UNB module perform the following steps 1 Check the handles of the UNB module are in the open position ...

Page 50: ...2 34 Installation Guide 2 Insert the UNB module and push it completely in 3 Close the handles 4 Tighten the handle captive screws ...

Page 51: ... SCI module perform the following steps 1 Check the handle of the SCI module is in the open position 2 Insert the SCI module and push it completely 3 Close the handle 4 Tighten the captive screw on the handle 4 Install the LMB module 1 Check the handles of the LMB module are in the open position ...

Page 52: ...2 36 Installation Guide 2 Insert the LMB module and push it completely 3 Close the handles 4 Tighten the captive screw on the handles ...

Page 53: ... the CLKB modules For each CLKB module perform the following steps 1 Insert the CLKB module 2 Push it completely 6 Install all the UNB fan modules For each UNB fan module perform the following steps Insert the UNB fan module and push it completely in using the handle ...

Page 54: ...2 38 Installation Guide 7 Install the UBox bezel 1 Position the bezel 2 Check the pilot pin B is aligned with the hole c 3 Tighten the captive screws A ...

Page 55: ...elivered fully populated It is possible to reduce the server weight by removing the components from the compute box However it is mandatory to use a lifting device A 1 Removing all the Components from the Compute Box 1 Carefully remove the main boxes and all the PSUs and all the PCIe blades 2 Unlock the main box 1 Loosen both captive screws 2 Release both handles ...

Page 56: ...A 2 Installation Guide 3 Pull the handles down at the same time to release the main box 4 Pull the main box out of the compute box by the handles 3 Remove the main box from the compute box ...

Page 57: ...A 3 Appendix A Installing a Lightened Server 4 Unlock the latch of the PCIe blade 5 Take hold of the handle and carefully remove the PCIe blade 6 Pull the latch of the PSU up ...

Page 58: ...A 4 Installation Guide 7 Take hold of the handle and carefully remove the PSU ...

Page 59: ...nstalling the Compute Box in the Rack Cabinet Proceed in the same way as for the fully populated server It is mandatory to use a lifting device 1 From the front install the compute box 2 Secure the compute box in place by tightening the captive screws ...

Page 60: ... 3 Installing the Components into the Compute Box 1 Carefully install the main boxes all the PCIe blades and the PSUs 2 From the front insert the main box into the compute box 3 Secure the main box in place 1 Lift both handles ...

Page 61: ...en both captive screws 4 Install the PSUs at the rear 1 Look at the labels on the PSU slot sides to check the PSU positions 2 Position a PSU in the slot on the left hand side with the latch B at the bottom Rear view 3 Take hold of the PSU by the handle A ...

Page 62: ...he PSU using the handle A until the latch B locks 5 Position a PSU in the slot on the right hand side with the latch B at the top Rear view 6 Take hold the PSU by the handle A 7 Push the PSU using the handle A until the latch B locks ...

Page 63: ...A 9 Appendix A Installing a Lightened Server 5 Locate all the PCIe blades slots for a module Rear view 6 Install all the PCIe blades For all PCIe blades 1 Unlock the latch ...

Page 64: ...A 10 Installation Guide 2 Insert the PCIe blade into the compute box using the handle 3 Check that the latch is closed ...

Page 65: ...elivery Screws Mark Head Body Diameter Length Description S1 5 mm 16 mm M5x16 CBL head thread forming screw S2 4 mm 10 mm M4x10 SS Flat head socket cap screw S3 4 mm 10 mm M4x10 Low Profile SS head cap screw Washers Mark Head Body Diameter Description W1 5 mm M5 Middle contact washer Nuts Mark Head Body Diameter Description N1 5 mm M5 cage nut ...

Page 66: ...B 2 Installation Guide ...