background image

 

Summary of Contents for THERMOCAR 16B

Page 1: ...1...

Page 2: ...e reference The installation of the product must be made suitably by authorised person according to rules determined inside the mannual Product must be installed to ventilated place Check if product c...

Page 3: ...3 2 BOILER CONFIGURATION...

Page 4: ...Length mm 132 155 Air Channel Discharge Gas Pipe Diameter mm 42 25 Net Weight Without Water Kg 18 2 Gross Weight Without Water Kg 19 2 Insulation Type RUBBER SPONGE Insulation Thickness mm 19 Outer C...

Page 5: ...mable and explosive substances must not be at the same place with product Make sure that the floor which product will be installed should be strong as to carry the weight of the water filled product D...

Page 6: ...Definetely teflon must not be used for connections After gas connections are done leakage of connections must be controlled with soap bubble at regular intervals Because of condensing water will be d...

Page 7: ...d numbered cables for LCD control pannel connection on other end Boiler connection socket is fixed to it s place on the boiler and fasten by tightening connection part For LCD control pannel connectio...

Page 8: ...se damage to devices While electric connection is made and terminals must be connect correctly Cable sections must be sufficient for maximum electric power of the product For the electric connection o...

Page 9: ...iler must be discharged Our company will not be responsible from damages and accidents in case of causes from incorrect connection Follow the following points for opreation of the product Install prod...

Page 10: ...period hour Weekdays 2 time period temperature Weekdays 3 time period minute Weekdays 3 time period hour Weekdays 3 time period temperature Weekdays 4 time period minute Weekdays 4 time period hour W...

Page 11: ...ot functioned For the deactivated of child lock it is needed to press to and buttons 5 sec The smart phone must be connected to Wi Fi network for downloading It is posisble to control the product by d...

Page 12: ...It is passed to another step by pressing Confirm the indicator is blinking rapidly button in application after Wi Fi on the LCD pannel starts to blink Device adding process is sterted by pressing Bli...

Page 13: ...CD pannel and more than this can be made from there LCD pannel must be connected to Wi Fi network for controlling by smart phone For controling of LCD Pannel from smart phone LCD pannel must be connec...

Page 14: ...t possible gas leakage and when the gas smell is felt shut the gas valves off urgently ventilate the environment by opening the door and the windows Never make a phone call inside the room do not turn...

Page 15: ...ase of failure of product do not panic and stop using the product Cut Off the gas electricity and water Consult the service department Never leave product electric supply and gas ON position when you...

Page 16: ...magnesium anode rods lose mass The magnesium anode rod which has completely lost its mass also loses its protection feature The life of the magnesium anode rod depends on the chemical structure of th...

Page 17: ...lve completely Abnormal pressure Call authorised services Insufficient fresh air Make product pipe controlled Windy weather Do not use it until the wind passes Heatexchanger Block Call authorised serv...

Reviews: