background image

 
 
 
 
 
 
 

User’s Manual 

CPSPV3600ETL-IN SLV 
CPSPV3000ETL-IN SLV 
CPSPV2000ETL-IN SLV 

 

 
 

 

 

 

 
 

 

 
 

 

 
 

 

CyberPower Systems Inc. 

Summary of Contents for CPSPV2000ETL-IN SLV

Page 1: ...User s Manual CPSPV3600ETL IN SLV CPSPV3000ETL IN SLV CPSPV2000ETL IN SLV CyberPower Systems Inc ...

Page 2: ...www cpsww com ...

Page 3: ...stem Turning off controls will not reduce this risk Internal capacitors remain charger for 2 minutes after disconnecting all source of power CAUTION The On grid Solar Power Generating System must be connected to an equipment grounding conductor directly or via the AC ground ATTENTIO Risk of burning During operation the case temperature may exceed 140 60 do not touch HIGH VOLTAGE Before opening the...

Page 4: ...Copyright 2012 CyberPower Systems Inc IMPORTANT SAFETY INSTRUCTIONS 2 PV Photovoltaic PWM Pulse Width Modulation Vac Volts AC Vdc Volts DC VMP Voltage at Maximum power VOC Open Circuit Voltage ...

Page 5: ...Copyright 2012 CyberPower Systems Inc UNPACKING 3 1 CPSPV2000ETL CPSPV3000ETL or CPSPV3600ETL module 2 Stainless wall mount bracket 3 User s manual 4 Warranty card 5 Self tapping screws M6 20L 5 ...

Page 6: ...he following issues need to be considered when planning for an installation using the On grid Solar Power Generating System See the specified sections for more information On grid Solar Power Generating System Location PV Array Requirements Grounding Requirements Routing the wires Ensure that you have obtained all permits required by local authorities or utilities before commencing installation On...

Page 7: ...uld be fully tightened secured and strain relieved as appropriate All mounting equipment should be installed according to the manufacturer specifications All roof penetrations should be sealed with an acceptable sealing method that does not adversely impact the roof warranty All wires conduit exposed conductors and electrical boxes should be secured and supported according to code requirements PV ...

Page 8: ...grounded permanent wiring system AC grounding The On grid Solar Power Generating System must be connected to a grounded permanent wiring system via the On grid Solar Power Generating System ground terminal The ground terminal must also be connected to the main utility breaker panel ground bar and to the house grounding rod according to requirement Lightning protection Reduce the risk of lightning ...

Page 9: ...ng can result in significant power losses and reduction in system efficiency 2 AC Circuit breaker This breaker must be sized to handle the rated maximum output voltage and current of the On grid Solar Power Generating System Please refer to the On grid Solar Power Generating System specification Recommended AC Circuit Breaker For CPSPV3600ETL 23 Amps 250 Vac For CPSPV3000ETL 20 Amps 250 Vac For CP...

Page 10: ...wall mount bracket Step3 Make sure the host of On grid Solar Power Generating System on the incision of the wall mount bracket Step4 Move the On grid Solar Power Generating System from right to left side and make sure the hole is locked with wall mount bracket Step5 Use cable ties and fix the On grid Solar Power Generating System with wall mount bracket WARNING Equipment damage Shock hazard If you...

Page 11: ...tion information Three LED indicator lights providing status ground fault and other warning indication Front Panel Feature 1 LCD Graphic liquid crystal display 160 128 dots 2 Button A Up key select the display item B Down key select the display item C Esc key escape to upper level D Enter key enter into next level 3 LED E LED Indicator Light Green Flash Standby for reconnection Solid Operation F L...

Page 12: ...ive Recommended type PV KST4 2 5I with 1 5 2 5mm 2 cable double isolation 3 Solar input positive DC wire connect to solar array positive Recommended type PV KBT4 2 5I with 1 5 2 5mm 2 cable double isolation 4 M20 1 5 cable glands 2pcs For RS 485 communication 5 M20 1 5 cable gland 1pcs For RM card communication 6 AC connector male Connect to the utility output Recommended female type PWJ 03BFFB LL...

Page 13: ...ll appear until protection timer countdown is completed Disconnect Test The disconnect test is designed to verify correct operation of the On grid Solar Power Generating System both on initial operation and periodically through its life as required by the utilities This test ensures that On grid Solar Power Generating System dose not send electricity to the utility grid when local utility has shut...

Page 14: ...he grid The display returns to show the power being produced and total kWh produced to date IMPORTANT The default voltage frequency and reconnect delay values are programmed into the unit at time of shipment from the factory No changes to these settings can be made in the field by the user Only authorized personnel with utility permission may change these settings ...

Page 15: ...ew Exit 12 01 2012 dd mm yyyy 14 59 24 After you select above three items the display will enter into Home Page 1 Home page Pac kW Right now the On grid Solar Power Generating System provides how much power to the grid E Total From the installation to now the On grid Solar Power Generating System provided how much energy to the grid E day Today the On grid Solar Power Generating System provided ho...

Page 16: ...t Total CO2 Savings 9249 9 kWh 9249 9 kWh 5013 4 Kg 3903 4 EUR In Main Menu select Multi meter then press Enter key 2 2 Multi meter In Main Menu select Data Logger then press Enter key 2 3 Data Logger Data Logger Daily Log Monthly Log Yearly Log In Data Logger select Daily Log then press Enter key 2 3 1 Daily Log In Data Logger select Monthly Log then press Enter key 2 3 2 Monthly Log ...

Page 17: ... then press Enter key 2 4 Log Book IMPORTANT There are over last 100 dated failure reports on the NS protection can be read In Main Menu select Config then press Enter key 2 5 Config Config Device Info Date Time Grid Set Display Set 1 2 Config Code RMCard Set 2 2 In Config select Date Time then press Enter key 2 5 1 Date Time In Config select Grid Set then press Enter key 2 5 2 Grid Settings ...

Page 18: ...ith utility permission In Config select Display Set then press Enter key 2 5 3 Display Settings In Config select Device Info then press Enter key 2 5 4 Device Info Device Info Firmware C Firmware M 3 Runtime Hour V 0 0 1 7 Firmware R V 0 0 5 1 V 0 0 2 5 2 3 Device Info 0 0 1 RS485ID 3 3 In Config select Installer Code then press Enter key 2 5 5 Installer Code ...

Page 19: ...System 17 Installer Code Enter 0 0 0 0 IMPORTANT The settings only can be used by authorized personnel with utility permission In Config select RMCard Set then press Enter key 2 5 6 RMCard Settings IMPORTANT The settings only can be used by authorized personnel with utility permission ...

Page 20: ...sor 1 failure F08 Temperature sensor 2 high F09 Hardware temperature sensor 2 failure F10 Temperature sensor 3 high F11 Hardware temperature sensor 3 failure F15 Hardware main DSP ADC1 failure F16 Hardware main DSP ADC2 failure F17 Hardware main DSP ADC3 failure F18 Hardware main DSP ADC4 failure F19 Hardware redundant MCU ADC1 failure F20 Hardware efficiency failure F22 Hardware communication 1 f...

Page 21: ... power deviation 3 Output Output rating power 2000 Watt 3000 Watt 3600 Watt Grid Single phase Grid rating voltage 230 Vac Grid voltage range Over under voltage disconnect 180 270 Vac According to code setting table Over under voltage disconnect time According to code setting table Grid rating current 8 7 A 13 A 15 6 A Grid maximum continuous current 10A 14 5 A 16 A Grid rating frequency 50 60 Hz G...

Page 22: ...ge power Firmware revision On grid Solar Power Generating System ID RTC Real time counter 10 years life Data storage Accumulate historical energy Regulatory Safety IEC 62109 1 2 Grid interface VDE AR N 4105 VDE0126 1 1 Emission EN 55022 2006 Harmonic current emissions EN 61000 3 2 2005 EN 61000 3 12 2005 Voltage fluctuations and flicker EN 61000 3 11 2001 Immunity EN 55024 Operation Environment Op...

Page 23: ...ergy storage timed discharge with 2 minutes Beware of hot surface Observe enclosed documentation There are special requirements The On grid Solar Power Generating System complies with the requirements of the applicable EC guidelines The On grid Solar Power Generating System must not be disposed of together with the household waste ...

Page 24: ...w ON Fast 197 8 189 189 192 Frequency high OFF Hz 51 50 0 08 sec 50 2 0 2 sec 50 2 0 2 sec 60 3 0 2 sec Frequency high ON Hz 50 05 50 15 50 15 60 1 Frequency low OFF Hz 47 50 0 08 sec 47 5 0 2 sec 46 0 2 sec 59 7 0 2 sec Frequency low ON Hz 47 55 47 55 46 1 59 9 Voltage high OFF Slow 253 0 600 sec 253 600 sec 253 600 sec 242 600 sec Voltage high ON Slow 250 0 250 250 239 Voltage low OFF Slow Volta...

Page 25: ...opyright 2012 CyberPower Systems Inc Code setting table 23 Reactive power measurement 1 00 0 98 0 98 0 96 0 94 0 92 0 90 0 96 0 94 0 92 0 90 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 0 P Pemax Cos φ ind cap ...

Reviews: