1 | 32

Hexadome L 

Building instructions 

www.creative-products.nl

Hexadome L

Installation

Version 3.1

Summary of Contents for Hexadome L

Page 1: ...1 32 Hexadome L Building instructions www creative products nl HexadomeL Installation Version 3 1 ...

Page 2: ...le CS 0537 Upper long sub profile ø90 mm 233 cm CS 0235 Positioning cable CS 9041 Rope 33 m CS 0536 Lower Main profile ø125 mm 277 cm CS 0093 Locking pin medium ø90 mm profile CS 9039 Locking pin large ø125 mm profile CS 0542 Lower X connector CS 0590 Ratchet plate CS 9058 Turn buckle CS 0544 T Connector Lower Left Marked with LL CS 0547 Upper cable CS 0546 T Connector Lower Right Marked with LR C...

Page 3: ...o point backwards LL LR Lower short sub profile CS 0538 T Connector Lower Right Marked with LR CS 0546 T Connector Lower Left Marked with LL CS 0544 Locking pin Short version CS 0093 2x Securing ring CS 0248 2x Upper long sub profile CS 0537 T Connector Upper Right Marked with UR CS 0545 T Connector Upper Left Marked with UL CS 0543 UL UR Locking pin Short version CS 0093 2x Securing ring CS 0248 ...

Page 4: ...Secure all parts with locking pins short version and securing rings Sub frame center CS 0551 Sub frame beam CS 0539 6x Sub frame connector CS 0558 6x Upper main profile CS 0540 4x Upper X connector CS 0541 3x Upper X connector CS 0541 3x Upper main profile CS 0540 2x Curvature has to point upwards Secure all parts with locking pins long version and securing rings Hooks have to point inwards ...

Page 5: ...www creative products nl Hexadome L Building instructions www creative products nl Secure all parts with locking pins long version and securing rings Mount the sub frame at the frame body STEP 5 Locking strip CS 0559 6x Securing ring CS 0248 6x ...

Page 6: ...ting methods 1 Lifting from below for example with a traverse lift by using the subframe Requirements lifting device minimum lifting height 7 5 meter minimum save working load 1200kg without suspended loads 2 Lifted from the top for example with a crane by using lifting slings 2 meter 1000 KG and the hook of the X connectors Assemble the remaining upper main profiles and Lower X connectors STEP 6 ...

Page 7: ...e products nl Secure all parts with locking pins long version and securing rings Repeat this step for the other five sides Rotate profile counter clockwise and push the X connector slowly in the profiles Upper cable CS 0547 12x Mount the first end of the upper cables STEP 7 Use the two inner eyes of the X connector ...

Page 8: ...dome L Building instructions www creative products nl Mount the first end of the 12 center cables Mount the first end of the center cables STEP 8 STEP 9 Center cable CS 0548 12x Lower main profile CS 0536 12x Secure all parts with locking pins long version and securing rings ...

Page 9: ...ts nl Mount the upper sub profiles 6x Mount the second end of the 12 upper cables STEP 10 STEP 11 UL UR Curvature sub profiles has to point inwards Secure all parts with locking pins long version and securing rings When crossing other cables place the cable above the first crossing cable and below the next crossing cable s ...

Page 10: ... L Building instructions www creative products nl Mount the first end of the 12 tensioning cables Mount the second level of main profiles STEP 12 STEP 13 Tensioning cable CS 0549 12x Lower main profile CS 0536 12x Secure all parts with locking pins long version and securing rings ...

Page 11: ... nl Hexadome L Building instructions www creative products nl Mount the lower sub profiles 6x Mount the second end of the center cables STEP 14 STEP 15 LL LR Secure all parts with locking pins long version and securing rings Curvature sub profiles has to point inwards ...

Page 12: ...wer main profile CS 0536 12x Secure all parts with locking pins long version and securing rings Foot connector Left CS 0560 Foot connector Right CS 0561 Anchor slide CS 0593 Anchor support CS 0562 Secure the Foot connectors with locking pins long version and securing rings Hooks have to point to the inside of the structure Secure the Anchor slides with locking pins long version and securing rings ...

Page 13: ... the structure STEP 18 STEP 19 The positioning cables are used to secure an acurate distance between the feet After mounting the positioning cables the structure can be placed on its feet Pull the legs of the structure outwards to put the positioning cables under tension Remove the positioning cables after anchoring For the different anchoring options and instructions see the anchoring guide ...

Page 14: ...r the structure Place the pull bars in the loops of the cover corners STEP 20 STEP 21 STEP 22 By tensioning the tension cables all the cables in the structure get tensioned and the structure gets its rigidity The included rope can be used to pull the cover over the structure Do not place the cover in windy conditions or take decent security measures Pull bar CS 0594 Use the inner hooks ...

Page 15: ...xadome L Building instructions www creative products nl Tension the cover at the corners Tension the contours of the cover with the turn buckles STEP 23 STEP 24 Use the seams of the cover to align the cover with the structure Ratchet plate CS 0590 Turn tensioner CS 9039 12x ...

Page 16: ...de of the structure Connection gutter CS 0270 1 Hang the side panel under the cover openings using the 5 hooks on the upper contour 2 Close the zipper from right to left seen from the inside of the structure The 5 hooks now can be demounted 3 Tension the side panel with the lashings at the bottom Tension the outer lashings to the structure feet and the inner lashings to the ground Inside Side pane...

Page 17: ...over L Installation movie Lounger L Installation movie Hexadome L Installation movie Hexadome M Installation movie Crossover M Installation movie Lounger M Gewenten 43a 4704 RE Roosendaal The Netherlands T 31 0 165 51 07 77 CS BI HDL V3 1 info creative products nl www creative products nl ...