background image

H4 ES 

HEAT TREATMENT 

SYSTEM

USER MANUAL

Содержание H4 ES

Страница 1: ...H4 ES HEAT TREATMENT SYSTEM USER MANUAL ...

Страница 2: ...uct Overview 5 Bedbug Decontamination Standard Operating Procedure 6 Installation 7 To Use H4 ES menus and operation 8 Alarms 15 Service Reminder 16 Maintenance and service 16 Filter inspection and cleaning 16 Accessories and consumables 16 Fault finding 17 Technical data 18 Illustrated installation description 19 ...

Страница 3: ...has a graphical display that presents the user with all required information including the temperatures measured inside the tent It offers both a manual mode and an automatic mode of operation where it switches off as soon as the process is finished This in combination with the remote monitoring and control features of the SuperVision provides all the means necessary to ensure quality with a docum...

Страница 4: ...t time of delivery and before use to ensure its good function The product warranty does not cover damage resulting from use of faulty products Changes or modifications to the equipment must not be made without written consent by Corroventa Avfuktning AB The product technical data and or installation and operation instructions can be changed without prior notice This manual contains information tha...

Страница 5: ...utlets or intakes as this can cause damage to the machinery as well as human injury 8 Install the machine steadily and leveled so that it cannot fall over 9 If the machine is broken if the power connector or the cable is damaged contact the retailer Do not repair the equipment if you have not received specific training by the manufacturer 10 Be careful not to damage the power cable The cable must ...

Страница 6: ... 1 pcs Collapsible tent frame 1 pc Floor insulation mats 2 pcs Product Overview Below pictures present H4ES ES with all its external features and controls SuperVision connector Foldable carrying handle with integrated cable parking Power switch on off Control panel Air inlet with process air filter Air outlet Durable poly urethane feet Temperature sensor connector marked blue ...

Страница 7: ...evidence of bedbugs Monitoring system put in place No further action Treatment Treatment option s is decided and agreed upon with customer depending on extent of infestation Small infestation Vacuuming Application of steam Mattress cover optional Climb Up traps optional Application of pesticide optional Heavy infestation Vacuuming Application of heat using H4ES Mattress covers recommended Climb Up...

Страница 8: ...0 mm of free space beneath all material and pieces of furniture etc 9 To the extent possible separate all the items from each other Put clothes on hangers Do not leave bags and suitcases packed and closed 10 For heat sensitive material and to avoid discoloring etc put very heat sensitive material at a distance from the machine The outlet from the machine is the hottest spot in the tent If in doubt...

Страница 9: ... are used for selection and editing and their respective functions are always presented in text and the bottom of the screen At the top level menus the left of these buttons is named Home and a push on this button will immediately lead back to the default view In many of the views there is an Info button which presents information that may be of use to the inexperienced user If the backlight of th...

Страница 10: ...municate with the Gateway Timer Visible when machine is set to operate on Timer Slaved indicates that the machine is controlled by other machine Alarm Machine has detected an error Heater indicator Animated moving when both heaters are active First level heater is always active Stop Center button in the default view stops the process If After cooling is selected the fan will continue operating in ...

Страница 11: ... screen the machine in addition to the current temperatures the machine also presents the status of each temperature sensor LOW or OK and if OK also for how many minutes the temperature have been at or above the target temperature Start up view When the H4ES ES starts up the display presents the user with two options Start Starts the machine with default settings continuous operation with maximum ...

Страница 12: ...he machine s target temperature has been reached When this temperature is reached the status switches to OK In the far right column the machine presents how many minutes have passed since the corresponding sensor passed the target temperature level Internal Relative Humidity and Temperature sensor screen This screen presents the values measured by the internal RHT sensor placed in the machine s in...

Страница 13: ... use the built in timer function When setting the time for operation be sure to set the interval so that the process will have time to finish before the Timer switches it off Remember also that unless manually switched off or disconnected the machine will start the following day as well Remember that the machine must be started before leaving the site in order for the Timer to take effect the scre...

Страница 14: ... Selection of language for the interface Menu System The menu system is by default set to Advanced with all functions visible and accessible If set to Basic the more advanced functions are removed from the menu system Key Pad lock Possibility to activate deactivate the key pad lock Run built in test A built in self test that is available for service technicians Reset Service Time The machine is se...

Страница 15: ...esents how many hours per day it has been in use for the last 14 days The value to the far right is that of the current day Alarms In this screen the machine presents identified alarms As soon as an alarm is identified this is also presented as a pop up screen Furthermore as long as the error condition remains in the top right corner of the default view there is a warning symbol The alarms present...

Страница 16: ... as this error remains as the temperature of the material is not known the machine will continue its operation until manually switched off Power Supply Failure Check that power cable two is connected to the outlet and if necessary check the fuse to see that there is power available Loss of power to this second power cable means that the heater capacity is reduced to approx 50 Mainboard connection ...

Страница 17: ...Maintenance and service Filter inspection and cleaning The process air filter shall be inspected and if necessary cleaned before each new cycle Accessories and consumables The following articles are available as accessories and consumables to the H4 ES machines Article number Name 1003493 Process air filter 1003383 Heat treatment tent 1003489 Collapsible Tent frame 1003429 External temp sensor ass...

Страница 18: ...er is available through the outlet The machine is showing All temperature sensors have failed alarm The temperature sensor assembly is not properly connected The sensor assembly is damaged Connect temperature sensor assembly to the machine Replace or repair sensor assembly Note If one or several of the temperature sensors have failed the machine will continue to operate until manually switched off...

Страница 19: ...E Voltage 230 VAC 50 Hz Rated power W Power cable 1 2100W Power cable 2 2200W Air volume m3 h 950 Height x width x length mm 533 x 320 x 497 Operating sound level dBA 70 Weight kg 22 kg Tent Height x width x length mm 2100x2400x2400 Weight kg 17 kg Frame Height x width x length mm 2100x2500x2500 Weight kg 12 kg ...

Страница 20: ...emplate if necessary 2 Extend the tent frame fully so that it forms a 2 5m by 2 5 meter square Leave the telescopic legs in their lowest position 3 Unfold the tent and place it on the insulated floor mats Take care to place the door in the intended direction 4 Use the straps at the respective top corners of the tent to secure them to the tops of the telescopic frame legs ...

Страница 21: ...various ceiling heights The tent must be stretched at the lower edge Secure the tent s lower straps at low ceiling heights and the upper straps at high ceiling heights Open the tent up and bring in all of the material to be treated noting observing that 7 No material is placed beyond the red indicators on the floor leaving 20 cm free so that the air can circulate Leave space also by the ceiling Le...

Страница 22: ...achine Install the machine as follows 11 Check the filter and clean it if necessary 12 With the tent still open place the machine by the tent inlets Push the tent over the inlet and the outlet stub of the machine and secure it with the straps so that it does not come off 13 Place the four sensors in positions where the temperature will rise slowly so that they will serve as indicators of when all ...

Страница 23: ...Hz max 16A 17 Flip the power switch to the left of the control panel to start the machine 18 When the machine has powered up push Start button to start the machine with factory default settings or push Resume to start with previous settings Verify the target temperature setting and for Auto mode the process time setting 19 Verify that the SuperVision symbol is visible at the top of the screen and ...

Страница 24: ...venta develops manufactures sells and rents high quality products for dealing with water damage moisture odours and radon We are one of the market leaders and specialists in innovation within the industry Our products are compact effective ergonomic and energy efficient In emergency situations and during flooding Corroventa s customers have access to one of the largest rental parks in Europe All o...