background image

1

 

EN

Assembly and

use guide

PROFESSIONAL SCAFFOLDING

SYSTEMS  

( ProTUBE L - S - F )

The instructions for the assembly 

and use shall be followed carefully

EN1004

201612-IE-1210

Summary of Contents for ProTUBE L

Page 1: ...1 EN Assembly and use guide PROFESSIONAL SCAFFOLDING SYSTEMS ProTUBE L S F The instructions for the assembly and use shall be followed carefully EN1004 201612 IE 1210...

Page 2: ...1 ProTUBE L Configuration Table 9 3 2 ProTUBE L6 Scaffold Assembly Method 10 3 3 ProTUBE L Wide Aluminum Scaffold System 3D Pictures 16 17 3 4 ProTUBE L Scaffold System Compounds 18 4 ProTUBE S Narrow...

Page 3: ...prevention of risks towards people or objects Safety me asures for weather conditions which may negatively affect security of the ProTUBE Scaffolds Permitted load Other risks to occur as a result of a...

Page 4: ...affect the balance Diagram 2 The parts and tools on the working floor of ProTUBE Scaffolds can only be manually carried If ProTUBE Scaffolds are to be pla ced on a soft surface there should be protec...

Page 5: ...following should be considered The product is suitable for usage with ProTUBE Scaffolds ProTUBE Scaffolds allows safe ope ration in the immediate vicinity of the assembly point ProTUBE Scaffolds can b...

Page 6: ...ds 2 6 Relocation of ProTUBE Scaffolds The height must be decreased to maximum 6 meters in order to move ProTUBE Scaffolds Stabilizers should be lifted maximum 10 cm in order to move ProTUBE Scaffolds...

Page 7: ...b Normalwearandtearoftheproduct c Assembly or repair performed by the customer or third parties the rep lacement of spare parts provided by a san Merdiven as shown in the 2nd article above is exclude...

Page 8: ...rushing cracks and correct functioning of the fastening elements Platforms Check for warping crushing cracks and correct functioning of the fastening elements Check the condition of the wood Check the...

Page 9: ...2 16 20 24 Guardrail Braces H PT259H 4 9 2 2 2 2 2 2 Horizontal Braces PT259Y 2 13 2 2 8 8 14 14 Stabilizer PT276PA 4 04 4 4 4 4 4 Castor PT200TE 5 5 4 4 4 4 4 4 Toeboard PT302TM 16 17 1 1 2 2 3 3 Tot...

Page 10: ...izontal braces onto the 1st step and fasten it to the modular frame from the interior part Make sure the alu minum cast clamps on the corners of the connections are safely seated and locked Diagram 3...

Page 11: ...ap between 6th step and 7th step Af ter making sure the tools completely grasp the carrier profile tighten the bakalite heads by turning Make sure each balance leg wedges are in conta ct with the soli...

Page 12: ...Make sure the aluminum cast clamps are safely seated and locked Diag ram 9 8 Then place the platform without trap door in line with the 3rd step of the 2nd floor while you are on the 1st floor After t...

Page 13: ...e 2nd floor Pass the security pint of the guardrail frames from the holes of the modular frames and lock them Diagram 11 10 Get on top of the platform with trap door on the 1st floor and carry the mod...

Page 14: ...al security connections of the guardrail Make sure the aluminum cast clamps are sa fely seated and locked Diagram 13 12 Place the platform you assembled on top to the corner by getting into the lower...

Page 15: ...iagram 16 You need to repeat the steps 6 7 8 in order to increase the height of your scaffold The height of the first platform should be maximum 4 60 m and the distance betwe en the platforms should b...

Page 16: ...16 EN ProTUBE L4 2 3 m ProTUBE L6 4 4 m ProTUBE L8 6 5 m 3 3 ProTUBE L Wide Aluminum Scaffold System 3D Pictures...

Page 17: ...17 EN ProTUBE L10 8 0 m ProTUBE L14 12 20 m ProTUBE L12 10 7 m 3 3 ProTUBE L Wide Aluminum Scaffold System 3D Pictures...

Page 18: ...ar Frame 7 Steps PT275C Diagonal Braces PT258KP Platform With Trapdoor PT276PA Stabilizer PT263M Modular Frame 5 Steps PT259Y Horizontal Braces PT258K Platform Without Trapdoor PT110K Guardrail Frame...

Page 19: ...rail Braces H PT259H 4 0 2 2 2 Horizontal Braces PT259Y 2 0 2 2 2 Stabilizer PT276PA 4 0 4 4 Castor PT200TE 5 5 4 4 4 Toeboard PTS302TM 11 0 1 1 2 Total Weight 102 3 145 1 206 4 60x240 cm Explanation...

Page 20: ...rizontal braces onto the 1st step and fasten it to the modular frame from the interior part Make sure the alu minum cast clamps on the corners of the connections are safely seated and locked Drawing 3...

Page 21: ...the solid surface Then place the 1 covered platform to the 7th step Balance the scaffold according to the long sides and short sides by using water scale Drawing 6 and 7 It is not mandatory to use ba...

Page 22: ...re the aluminum cast clamps are safely seated and locked Drawing 9 7 Then carry it upwards onto the 7th step of the 2nd floor and fix it Don t forget to open the wind lock while di sassembling the pla...

Page 23: ...tool of the mo dular frames of the 2nd floor Pass the security pint of the guardrail frames from the holes of the modular frames and lock them Drawing 11 9 Fix the horizontal security con nections of...

Page 24: ...awing 14 You need to repeat the steps 5 6 7 in order to increase the height of your scaffold The height of the first platform should be maximum 4 60 m and the distance betwe en the platforms should be...

Page 25: ...25 EN 4 3 ProTUBE S Narrow Aluminum Scaffold System 3D Ima ProTUBE S6 4 4 m ProTUBE S4 2 3 m ProTUBE S8 6 5 m...

Page 26: ...Systems Compounds PTS223M Modular Frame 7 Steps PT275C Diagonal Braces PT258KP Platform With Trapdoor PT276PA Stabilizer PT259Y Horizontal Braces PTS110K Guardrail Frame PT259H Guardrail Braces H PT20...

Page 27: ...l Braces H PTF182H 4 0 2 2 Horizontal Braces PTF182Y 2 0 1 1 Stabilizer PT276PA 4 0 4 Castor PT125TE 5 5 4 4 4 Toeboard PTF180TM 11 0 1 1 Total Weight 54 5 93 7 136 5 60x180 cm Explanation Item Code M...

Page 28: ...put Take the module to the usable position by opening it outwar ds and lock it again Drawing 2 3 3 Place the 1 horizontal connection onto the 1st step and fasten it to the modu lar frame from the int...

Page 29: ...en the short part of the balance legs to the gap between 1nd step and 2rd step and its long part to the gap between 6th step and 7th step After making sure the tools completely grasp the carrier profi...

Page 30: ...orms After this your scaffold will rise for another flo or Drawing 9 9 Get on top of the platform you placed on the 2nd floor and put the guardrail frames into the fitting tool of the mo dular frames...

Page 31: ...10 Fix the horizontal security connecti ons of the guardrail Make sure the aluminum cast clamps are safely sea ted and locked Drawing 11 10 11 31 EN...

Page 32: ...ad in a way that it will surround the platform at the top Drawing 12 12 Your ProTUBE F360 coded product with 4 40 m stepping height is ready for usage Drawing 13 Thank you for choosing a san Merdiven...

Page 33: ...33 EN 5 3 ProTUBE F Karelia Aluminum Scaffold System 3D Images ProTUBE F90 0 9 m ProTUBE F360 ProTUBE F180 3 6 m 1 8 m...

Page 34: ...unds PTS223M Modular Frame 6 Steps PTS223ME Modular Frame 6 Steps PTF202C Diagonal Braces PTF183KP Platform With Trapdoor PT276PA Stabilizer PTF182Y Horizontal Braces PTS110K Guardrail Frame PTF182H G...

Page 35: ......

Page 36: ...of this document may not be used reproduced or copied without permission in printed form or in any other electronic media Cagsan Merdiven Erisim Ekipmanlar San Tic Ltd Sti Dilovas Organize Sanayi Bolg...

Reviews: