Страница 1: ...INSTALLATION AND MAINTENANCE MANUAL X TENSION NCHRP 350 TL 3 Tangent Flared End Terminal and Median Attenuator...

Страница 2: ...l Nose Cover 23 Installation Checklist 24 MAINTENANCE Traffic Face Impacts 25 Head on Impacts 26 APPENDIX Drawings XTGTSS1 Roadside Imperial Wood Blockout Wood Post 27 XTGTSS2 Roadside Imperial Wood B...

Страница 3: ...systems Even head on high angle 15o during testing impacts on the nose resulted in the vehicle being redirected and controlled System Overview The X Tension Guardrail End Terminal is designed and con...

Страница 4: ...teria Safety Statements General Safety All required traffic safety precautions should be complied with All workers should wear required safety clothing high visibility vests steel capped footwear glov...

Страница 5: ...cation Impact Head Friction Plate Soil Anchor 1 Required 1 Required 1 Required B061072 B061058 B061104 Slider Bracket Angle Bar Cable Bracket Cable Assembly 1 Required Roadside 2 Median 1 Required 2 R...

Страница 6: ...ost 1 Bottom Roadside can be CRT Timber CRT Timber Posts allowed roadside 1 Required B061100 4002338 B061098 Standard Highway Rail 12 6 Median Radius Rail 1 12 6 Median Secondary Head 3 Required Roads...

Страница 7: ...nes will vary from State to State Tools Required The same tools required to install standard highway guardrail will also install an X Tension Spe cifically Sockets commonly used in Guardrail Drill Wre...

Страница 8: ...y an 11 4m 38 ft continuation of the standard guardrail run Pull a string line out with the desired offset 0 450mm 0 1 5 ft over the length of the system in a straight flare Figure 1 The system should...

Страница 9: ...to the hole The post may also be placed in an oversized augured hole but care must be taken to ensure the backfill is properly compacted Hint Offset Post 3 back from the string line 40 50mm up to 2 in...

Страница 10: ...trut should be level or lower at the anchor end than at the post 1 bottom end Place post 1 top in the post 1 bottom anchor ensuring that the post bolt notches are at the top and facing the Soil Anchor...

Страница 11: ...TO POST 3 Splice rail 2 to rail 3 with the 8 special shear bolts yellow supplied Figure 9 Put the washer and nut on inside of rail IMPORTANT NOTE DO NOT USE STANDARD SPLICE BOLTS AT POST 5 SPLICE DO...

Страница 12: ...rved and reinforced post breaker end of Slider Panel sits at the rail end Use guardrail pin bar or crow bar to assist with lining up splice holes Figure 12 Sit rail 1 so it is raised off the ground St...

Страница 13: ...ng the supplied M16 x 50mm 5 8 in x 2 in guardrail post bolt Use a 50mm x 50mm 2 in x 2 in washer under the nut on the inside of post 1 Figure 18 Step 10 Place the Cables Push the cables under the ste...

Страница 14: ...backside of the rail following the bottom trough of the W beam and attach to the bottom box on the Cable Bracket at post 7 Repeat this process with the other cable but push it through the top hole and...

Страница 15: ...until they are taut i e they rest in the backside of the W beam and do not visibly sag between posts Figure 26 There is no torque requirement for the cables Figure 25 Tighten cables at Cable Bracket e...

Страница 16: ...d Site preparation The Flared terminal may be installed either parallel to the edge of the roadway tangent or with the impact head end of the rail offset by up to 1 2m 4 ft away from the road Figure 2...

Страница 17: ...and rail 4 at post 7 is formed by simply pushing the rails around to follow the flared line of posts This is not factory bent Step 1 Set Out Pull a string line out with the desired offset 0 1 2m 0 4 f...

Страница 18: ...Median X Tension system as a Median guardrail terminal end application Site preparation The Median X Tension system is installed parallel to the standard median barrier therefore no offset is used Fi...

Страница 19: ...rallel with the median barrier posts The string line should be set to follow the side of the posts on the side that it is desired to install the tangent X Tension Figure 33 Essentially a tangent syste...

Страница 20: ...e 25mm 1 in pin and pin lynch or 2 M24 x 50mm 1 in X 2 in bolts as shown Figure 36 Step 4 Attach Backside Rail 3 and Rail 2 Rails 3 and 2 are installed like standard guardrail with blockouts between t...

Страница 21: ...am end of rail 2 Figure 40 Angle bar end should be closest to Impact Head Step 6 Assemble Slider Panel onto Backside Rail 1 Raise the straight end of the curved backside rail 1 and fit the Slider Pane...

Страница 22: ...er end over rail 2 Bolt rail 1 and blockout to post 2 using supplied standard post bolt and 50x50mm 2 in x 2 in washer on inside of post bolt notch on the backside of post 2 Figure 43 Re attach the an...

Страница 23: ...sh rivets Figure 47 Delineation to be attached to nosing as per Local Authorities requirements Optional Nose Cover Install High Visibility Nose Cover Attach the High Visibility Nose Cover to the Impac...

Страница 24: ...flare as per design offset between 0 to 1 2m 0 to 4 ft Slider Panel is connected to end of first rail All 4 holes bolted with nuts on traffic face Slider Bracket affixed to back of rail 2 with 4 bolt...

Страница 25: ...ill help Undo nuts at ground anchor end and remove cables Step 2 Remove Rails Unbolt the splice bolts first Then unbolt the post bolts and lower rails to ground Step 3 Remove X Tension Components All...

Страница 26: ...l help Undo nuts at ground anchor end last and remove cables Step 2 Pull Rails Back Out Attach a chain or two ton strap to the front of the impact head and pull upstream to its original position with...

Страница 27: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 27 X Tension System...

Страница 28: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 28 Installation and Maintenance MANUAL...

Страница 29: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 29 X Tension System...

Страница 30: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 30 Installation and Maintenance MANUAL...

Страница 31: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 31 X Tension System...

Страница 32: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 32 Installation and Maintenance MANUAL...

Страница 33: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 33 X Tension System...

Страница 34: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 34 Installation and Maintenance MANUAL...

Страница 35: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 35 X Tension System...

Страница 36: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 36 Installation and Maintenance MANUAL...

Страница 37: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 37 Page Left Intentionally Blank...

Страница 38: ...Lindsay Transportation Solutions Sales and Services Inc 888 800 3691 U S toll free or 1 707 374 6800 38 Page Left Intentionally Blank...