background image

VIBE

 

BACK TO WALL 

(FREESTANDING)

 

INSTALLATION INSTRUCTIONS

IMPORTANT INFORMATION 

FOR THE INSTALLER AND THE OWNER

 

 

TO BE KEP

T B

Y THE O

WNER

Содержание VIBE BACK TO WALL

Страница 1: ...VIBEBACK TO WALL FREESTANDING INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER T O BE KEPT BY THE OWNER ...

Страница 2: ... ACCESS UNDER THE FLOOR 10 1 PLUMBING 10 2 INSTALLATION 12 INSTALLATION WITHOUT ACCESS UNDER THE FLOOR 13 1 PLUMBING 13 2 INSTALLATION 15 REMOTE MOUNTING OF TURBINE 17 1 TURBINE GEYSAIR THERMOMASSEUR 17 2 INSTALLATION 18 3 ELECTRICAL CONNECTIONS THERMOMASSEUR 19 ELECTRONIC CONTROLS 20 1 MIAPLUS MIAMULTI 20 2 DOT 20 ELECTRICAL SECTION 21 1 ELECTRICAL CONNECTIONS FOR REMOTE MOUNTING OF TURBINE AND T...

Страница 3: ... INSTALLATION INSTRUCTIONS VIBE BACK TO WALL installation www bainultra com Some products specifications and services mentioned in this manual are described in pending patent applications or are protected by patents VIBE BACK TO WALL ...

Страница 4: ...r drowning do not use drugs or alcohol before or during the use of a Hydro thermo massage bathtub equipped with a heater Use this unit only for its intended purposes or as described in this manual Use only accessories or devices recommended by the manufacturer Risk of hyperthermia and possible drowning Check and adjust water temperature before use Water temperature exceeding 100ºF 38ºC may be harm...

Страница 5: ...it and 14 AWG for 15 amp dedicated circuit copper conductors that resist temperatures of at least 194 F 90 C Canada only for permanently connected units A green colored terminal or a wire connector marked g gr ground or grounding is provided within the terminal compartment not applicable if unit supplied with an electric plug To reduce the risk of electrocution connect this terminal or connector t...

Страница 6: ...S PLUMBING DESCRIPTION QTY A Plated drain clicker 1 B Strainer 1 C Rubber seal 1 D Tee PVC Drain shoe 1 OPTIONAL PARTS PLUMBING DESCRIPTION QTY E Tee brass drain shoe 1 F 8 in brass tailpiece 1 G Nylon conic shaped seal for drain 1 H Brass nut 1 I Brass pipe with flange 1 J Island Tub Drain ITD Floor set 1 PARTS TOOLS REQUIRED REQUIRED WHEN NO ACCESS IS POSSIBLE UNDER THE FLOOR A B C D PVC DRAIN A...

Страница 7: ...ribed in pending patent applications or are protected by patents PARTS TOOLS REQUIRED STANDARD PARTS THERMOMASSEUR DESCRIPTION QTY A Turbine 1 B MiaPlus Control 1 C MiaMulti Control option 1 D 15 control cable 1 B C A D PARTS TOOLS Cutting template 48 inch level Measuring tape Teflon tape ABS PVC Glue Square Phillips 2 Screwdriver 3 4 Ratchet Adjustable clamps Silicone Caulking Gun ...

Страница 8: ...e the technical specifications download it from the BainUltra Web site at bainultra com or call us at 1 800 463 2187 FLOOR 1500 LB 680 KG PLUMBING Position drain according to bath s technical specifications Allow an access to Geysair jonction hose WARNING VIBE Back to wall bath cannot be drilled for faucet installation Faucets must be freestanding or wall mounted models BEDDING Before installing e...

Страница 9: ... a solid core wire 14AWG and run it in between the turbine location and the tub This may require a proper conduit for high voltage wires if installed in a cement slab for example 2 Geysair connects to the hot water line that you are providing to your faucet at the tub It uses a 3 8 compression thread LED CHROMATHERAPY 1 The power modules inMix module Litestreme have to be installed next to the tur...

Страница 10: ...ION WITH ACCESS UNDER THE FLOOR PLUMBING PREPARATION FLOOR LAYOUT FOR PIPES AND ACCESS 1 PLUMBING HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily manipulate the bathtub in a safe way during installation we recommend using moving straps VIBE BACK TO WALL NOTE Please refer to the Cutting Template provided with your VIBE BACK TO WALL bath However if i...

Страница 11: ...bainultra com Some products specifications and services mentioned in this manual are described in pending patent applications or are protected by patents INSTALLATION WITH ACCESS UNDER THE FLOOR PVC DRAIN PVC BRASS DRAIN BRASS DRAIN FRONT OVERFLOW CONFIGURATION SHOWN MAY VARY ACCORDING TO OPTIONS ...

Страница 12: ...2 BATH INSTALLATION STEPS TO FOLLOW Do not remove the protective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic Make sure the drain is correctly positioned in relation to the wall refer to the cutting template Make sure that the angle of the wall with the floor is the same as the angle of the bathtub Connect the drain Once the bath is in place ...

Страница 13: ...ISLAND TUB DRAIN ITD INSTALLATION HELPFUL TIPS Carefully place the tub on its side on a blanket or a corrugated cardboard To easily manipulate the bathtub in a safe way during installation we recommend using moving straps IMPORTANT REFER TO INSTRUCTIONS SUPPLIED WITH THE ISLAND TUB DRAIN ITD FOR ITS INSTALLATION PLUMBING PREPARATION FLOOR LAYOUT FOR PIPES AND ACCESS VIBE BACK TO WALL NOTE Please r...

Страница 14: ...bruary 2019 BainUltra Inc All rights reserved 45200674 INSTALLATION WITHOUT ACCESS UNDER THE FLOOR 2 PLUMBING NOTE Refer to supplied instructions for Island Tub Drain ITD installation The floor finishing material can go over the red center piece of the ITD The red center piece connects to the brass tailpiece PVC DRAIN PVC BRASS DRAIN BRASS DRAIN FRONT OVERFLOW CONFIGURATION SHOWN MAY VARY ACCORDIN...

Страница 15: ...HE FLOOR 2 BATH INSTALLATION STEPS TO FOLLOW Do not remove the protective plastic film on the tub and place a drop cloth in the tub during installation to protect the acrylic Make sure the drain is correctly positioned in relation to the wall refer to the cutting template Make sure that the angle of the wall with the floor is the same as the angle of the bathtub Connect the Island Tub Drain Once t...

Страница 16: ...IONS OF THE AIR PIPE AND THE ELECTRICAL SUPPLY OF THE THERAPEUTIC OPTIONS MUST BE DONE AT FLOOR LEVEL YOU MUST CUT AN OPENING ON ONE OF THE WALLS CLOSEST TO TURBINE AND CONTROLS Be careful not to drill the inside shell of the bath The size of the opening must allow for passage of the pipe and the wires The location of the air pipe is shown as an example It may differ depending on the positioning o...

Страница 17: ...d by patents REMOTE MOUNTING OF TURBINE 1 TURBINE GEYSAIR INSTALLATION FOR THERMOMASSEUR WARNING Access to Geysair hot water connections is necessary for cleaning of the filter Back flow preventor Geysair cannot be remotely installed Must never be unplugged GEYSAIR HOSE AND FLOW REGULATOR FLOW REGULATOR HOT WATER SUPPLY 1 1 2 I D PVC AIR INTAKE PIPE TIGERFLEX FLEXIBLE PVC 1 1 2 I D ABS PVC PIPE RI...

Страница 18: ...ow directional changes to ensure system performance It can be under the floor in a closet or any other place that can hide the turbine and if needed optional modules Easy access must remain possible at all time and sufficient air ventilation is necessary for turbine A service access is necessary Minimum dimensions are 22 in x 18 in 55 cm x 46 cm to properly reach all electrical components of the s...

Страница 19: ...on the bath grounding continuity must be tested between the bath grounding terminal and the bath power supply Failure to perform the grounding continuity test could result in serious personal injury 3 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS THERMOMASSEUR See page 23 for electrical diagram NOTE ELECTRICAL CONNECTIONS FOR REMOTE MOUNTING OF TURBINE AND THERAPIES SEE PAGES 21 22 GEYSAIR BAC...

Страница 20: ...the Cutting Template on page 24 for the location and diameter of the holes IMPORTANT You will find the control attached to the turbine or to the electronic control modules 7 8 in Hole saw Drill DOT Chromatherapy LED DOT WarmTouchShell WTS TOOLS REQUIRED Drill wall 7 8 hole Push wiring through drilled hole Remove protective film from watertight seal Secure to the wall with permanent waterproof seal...

Страница 21: ...cian and must respect federal provincial state and local building codes and regulations Electrical power should be turned on only after all the low voltage wires are connected to turbine If this step has not been done simply disconnect main breaker that is linked to turbine Turbine must be located in a clean and dry space Geysair component cannot be remote mounted Must never be unplugged A Chromat...

Страница 22: ... B Chromatherapy LED C DOT WarmTouchShell D DOT Chromatherapy LED 2 ELECTRICAL CONNECTIONS FOR REMOTE MOUNTING OF THERAPIES WITHOUT AIR JETS See page 23 for electrical diagram Litestreme Inmix module C A B C D DOT WarmTouchShell WTS DOT Chromatherapy LED To GFCI OUTLET United States To GFCI OUTLET United States Jonction Box Canada Jonction Box Canada To left LED WARNING VIBE Back to wall bath cann...

Страница 23: ...LECTRICAL DIAGRAM 20A THERMOMASSEUR and 15A THERAPY 15A CIRCUIT 20A CIRCUIT NEUTRAL N L LOAD NEUTRAL N L LOAD GROUND FAULT CIRCUIT INTERRUPTERS GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION BOX JUNCTION BOX TURBINE WITH GEYSAIR FOR MIAPLUS MIAMULTI TURBINE WITHOUT GEYSAIR FOR MIAPLUS MIAMULTI N L N L 15A CIRCUIT AIRSTREME WARMTOUCHSHELL N L N L NEUTRAL N L LOAD INMIX MODULE CHROMATHERAPY GROUND FAULT...

Страница 24: ...aMulti infrared 11 313 28 7 cm 1 063 2 7 cm 11 063 28 1 cm 1 625 4 1 cm 1 125 2 9 cm 1 375 3 5 cm 0 875 2 2 cm R0 125 R0 3 cm 1 625 0 04 4 1 cm 0 1 cm AIR INTAKE OP PRISE D AIR OUV Trou pour infrarouge MiaMulti Cut out for MiaMulti infrared 1 063 2 7 cm 1 625 4 1 cm 1 125 2 9 cm 1 375 3 5 cm 0 875 2 2 cm R0 125 R0 3 cm P Trou pour infrarouge MiaMulti Cut out for MiaMulti infrared E OPALIATM CUTTIN...

Отзывы: