background image

INSTRUCTION MANUAL

UNIVERSAL PROJECTOR MOUNT

Maximum Load: 

15 kg (33 lbs)

Tilt Range:

 - 15° to 15° up/down 

Swivel Range: 

up to 360°

Distance from Ceiling:

 12.8 cm (5.0”)

Read these instructions before you begin.

 If you are unsure 

of any part of the process, contact a professional contractor or 
installer for assistance. Improper installation can result in injury 
or damage.
The ceiling or mounting surface must be capable of 
supporting the combined weight of the mount and the 
projector; if not, the structure must be reinforced.
Locate pipes, wires, or any other hazards in the area where you 
wish to install the mount before drilling.
Safety gear and proper tools must be used. Failure to do so 
can result in injury or damage.
Follow all instructions and recommendations regarding 
adequate ventilation and suitable locations for mounting your 
projector. Consult the owner‘s manual for your particular 
display for more information.

CAUTION:

 This mount is intended for use only with the 

maximum weight of 15 kg (33 lbs). Use with heavier than the 
maximum weights indicated may result in instability causing 
possible injury.

1

2

3

4

(A) Wood Screw M6.3 x63 (x2)

(B) Wall Anchor (x2)

(C) M3 x12  (x4)

(D) M4 x 12 (x4)

(E) M5 x 10 (x8)

 (F) M5 x 12 (x4)

(G) M6 x 12 (X8)  

(H) M5 Washer (x4)  

(I)M4 Washer (x4)  

(J) M5 small washer (x2)

(K) M6 Washer (x4)

(L) M5 larger washer  (x4)  

(M) M5 plastic washer (x4)

5

SPECIFICATIONS

BOX CONTENTS

HARDWARE KIT

TOOLS REQUIRED

WARNINGS

Phillips Head Screw Driver
Electric or Portable Drill
3 mm (1/8”) Drill Bit and Stud Finder for Drywall Installation
8 mm (5/16”) Masonry Bit for Concrete Installation

Ceiling Plate (x1)
Mount Body (x1)
Mount Base (x1)

Extension arm (x4)
Instruction Manual (x1)
Hardware Kit (x1)

Attach the M5 large washer (L) 

to the Mount Body using the M5 
x 10 screw (E) from the kit (see 
Fig. 2). Leave the screw loose 

enough so that the mount can 

be hooked onto the mount 

body.
Use a high-quality stud finder to 

locate a ceiling joist where you wish to install your mount. 

Mark both edges of the joist to help identify the exact center. 

Wood studs should be 2” x 4”, at minimum:1.5” x 3.5” (38mm x 

89mm) (see Fig. 3).  

2

Place the ceiling plate over the 
joist and mark two locations for 
securing the plate to the ceiling 
(see Fig. 4).
Set the ceiling plate aside and 
drill two holes 2.5” (64 mm) deep 
using a 1/8” (or 3 mm) size drill 
bit at each marked location. 

4

Install the ceiling plate using 
two lag Bolts (A) in the “A” and “B” 
holes. Do not over tighten lag 
Bolts (see Fig. 5).  

6

5

Attach the Mount Body to the 
ceiling plate using the M5 x 10 
screw (E), M5 small washer (J), 
M5 plastic washer (M) from the 
kit (see Fig. 1).  

1

3

Part 1A – Mounting to the Ceiling (Drywall)

Part 1A – Mounting to the Ceiling (Drywall) (continued)

INSTALLATION

Part 1B –Mounting to the Ceiling (Concrete)

 

 

 

(E)

(M)

(J)

Attach the mount body to the 
ceiling plate using the M5 x 10 
screw (E), M5 small washer (J), 
M5 plastic washer (M) from the 
kit (see Fig. 6).

1

(E)

(M)

(J)

(E)

(L)

 

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

(A)

Reviews: