background image

ADCP-96-015

Issue 1

July 2004

1290491 Rev A

Fiber Distribution Terminal
ACE-142S/142V Cabinet
User Manual

19603-A

Summary of Contents for ACE-142S

Page 1: ...ADCP 96 015 Issue 1 July 2004 1290491 Rev A Fiber Distribution Terminal ACE 142S 142V Cabinet User Manual 19603 A...

Page 2: ...mages resulting from loss of data loss of use or loss of profits and ADC further disclaims any and all liability for indirect incidental special consequential or other similar damages This disclaimer...

Page 3: ...3 4 Cable Conduit Installation 10 3 5 Grounding System Installation 10 3 6 Back Fill 10 3 7 Mounting the Cabinet on the FMS 20000 10 4 MOUNTING THE CABINET ON A CONCRETE PAD 15 4 1 Installation Recomm...

Page 4: ...TING THE SPLITTER OUTPUT FIBERS 45 11 1 Storing The Splitter Output Fibers 45 11 2 Enabling Service To a Subscriber 46 12 MAINTENANCE AND REPAIR PROCEDURES 47 12 1 Painting 47 12 2 Adapter Replacement...

Page 5: ...persons or equipment An admonishment identifies a possible hazard and then explains what may happen if the hazard is not avoided The admonishments in the form of Dangers Warnings and Cautions must be...

Page 6: ...ot assume the laser power is turned off or that the fiber is disconnected at the other end Danger Use adequate lifting equipment when moving or installing Fiber Distribution Terminal cabinets Verify t...

Page 7: ...bution cabinet that is designed to hold the splice trays splitters connector panels and connector storage panel required for various Fiber To The Premises FTTP applications A typical ACE 142S 142V cab...

Page 8: ...accommodate up to thirty seven round splice trays up to twelve 1x8 or 1x32 splitter modules and five 72 position connector panels equipped with APC SC adapters Seven splice tray slots are provided for...

Page 9: ...8 standard APC SC 1x32 standard APC SC 11 1 dB Maximum Including connector 17 8 dB Maximum Including connector Return loss at test bandpass 1x8 standard APC SC 1x32 standard APC SC 55 dB 55 dB Table 1...

Page 10: ...CE1000 Concrete pad mount frame PMF kit ACE 100PMF Ground spacer ACE ACCSPCRO6S 102 Cable Hardware Kits Blocking kit loose buffer tube FBK OSP002 Clamping kit OSP CLPSST Grounding kit loose buffer tub...

Page 11: ...cabinet will be securely anchored to the concrete slab Mounting the Cabinet After the support base is installed the cabinet is secured to the support base Feeder and Distribution Cable Installation Th...

Page 12: ...adlock optional Grounding system copper wire and grounding clamp per local requirements Splicing equipment for splicing OSP feeder and distribution cables Lifting equipment for hoisting the cabinet in...

Page 13: ...ing equipment 2 x 6 inch framing lumber 1 x 4 inch wooden stakes 4 Nails and construction screws Utility wire to secure PMF during installation Saw Drill with screwdriver bits Square Level Landscaping...

Page 14: ...or the installation must conform to all local codes and any permits required must be obtained prior to the start of installation The location must be accessible and provide adequate parking for worker...

Page 15: ...excavation 1 Fill the bottom of the hole with stone aggregate tamping it as it is filled to build a 12 inch 30 5 cm layer with a level surface The stone aggregate will provide a stable base to support...

Page 16: ...fficient slack in the grounding wire to allow it to be routed into the cabinet after the cabinet is mounted on the sleeve 3 6 Back Fill If installing conduit hand shovel stone aggregate under the cond...

Page 17: ...n Figure 5 Tighten each capscrews securely Figure 5 Mounting the ACE 142S Cabinet on the FMS 20000 Warning Use appropriate lifting equipment when moving or installing the cabinet Do not stand under a...

Page 18: ...round spacer secure the cabinet to the adapter cover using the four hex bolts lock flat washers and four flat washers provided with the cabinet Tighten all fasteners securely 10 If the FMS will be use...

Page 19: ...tions that were installed in the bottom of the FMS 20000 Note The cables are coiled on spools for shipment On each spool is a label that lists each fiber subunit within the cable and the connector pan...

Page 20: ...the four hex bolts four flat washers and four nuts provided with the spacer If the installation does not include a ground spacer secure the cabinet to the adapter cover using the four capscrews four l...

Page 21: ...landscaping requirements the top surface of the concrete pad may be located from 0 to 3 inches 7 6 cm above the surrounding grade 4 2 Cable Conduit Installation Install the cable conduit from below as...

Page 22: ...E 90 BEND IN DUCT TOPSOIL OR DECORATIVE ROCK GRADE 72 0 IN 182 9 CM 9 0 IN 22 9 CM 28 0 IN 71 1 CM 26 1 IN 66 4 CM 30 6 IN 77 7 CM 44 0 IN 111 8 CM 33 0 IN 83 8 CM REINFORCED CONCRETE PAD 4 IN DUCT FO...

Page 23: ...s which must be left in place until the enclosure is mounted 5 Pour the concrete to form the pad but do not pour concrete into the center area of the PMF 6 Remove the top framing and the temporary sup...

Page 24: ...t doors as needed during the mounting process 4 6 1 Mounting the ACE 142S Cabinet on a Concrete Pad Use the following procedures to mount the ACE 142S cabinet on the concrete pad 1 Remove the plastic...

Page 25: ...ts provided with the spacer If the installation does not include a ground spacer secure the cabinet to the PMF using the four hex bolts lock flat washers and four flat washers provided with the cabine...

Page 26: ...ign the mounting holes in the ground spacer with the mounting holes in the PMF 5 Secure the ground spacer to the PMF using the four capscrews four lock washers and four flat washers provided with the...

Page 27: ...llation includes a ground spacer secure the cabinet to the spacer using the four hex bolts four flat washers and four nuts provided with the spacer If the installation does not include a ground spacer...

Page 28: ...entry section of the bottom cover to the cabinet as shown in Figure 12 Save the nuts and washers for reuse 3 Lift up the cable entry section of the bottom cover and push it toward the front of the cab...

Page 29: ...local practice to protect the exposed optical fibers From the clamping point the optical fibers are routed to splice trays for splicing to the splitter input fibers Use the following procedure to ins...

Page 30: ...ing lead to one of the grounding studs located within the cabinet see Figure 13 8 From the cable clamping location route the first fiber subunit up the right side of the cabinet as shown in Figure 16...

Page 31: ...able Fibers Routed To Splice Trays CABLE USE GROMMET FOR SMALLER DIAMETER CABLES COVER PLATE CLAMPS SCREWS 19623 A SECURE FEEDER CABLE TO PANEL ON RIGHT SIDE OF CABINET SPLITTER INPUT FIBER ROUTING CE...

Page 32: ...ter input fibers in each splice tray in preparation for splicing 1 The input fibers from each splitter are routed to a splice tray located on the top left side of the cabinet Locate the splice tray th...

Page 33: ...and the feeder cable fibers in the splice tray and complete all splices per local practice Refer to Section 7 for information on how to use the round splice trays and then return to Step 10 to contin...

Page 34: ...015 Issue 1 July 2004 Page 28 2004 ADC Telecommunications Inc Figure 19 Splitter Module Designation Label Type 2 19739 A SPLITTER MODULE LABEL FRONT DOOR REAR DOOR SPLITTER MODULES 2 1 3 4 5 6 7 8 9 1...

Page 35: ...splice trays for splicing to the connector panel pigtails Use the following procedure to install the distribution cable 1 Route the OSP distribution cable into the cabinet from the bottom If the cabi...

Page 36: ...ed 11 Use a Phillips screwdriver to remove the four screws that secure the handle assembly to the back of connector panel 1 top panel as shown in Figure 23 Save each screw for reuse 12 Remove the hand...

Page 37: ...and Installation 19633 A SECURE DISTRIBUTION CABLE TO PANEL ON RIGHT SIDE OF CABINET CABLE CLAMPS DISTRIBUTION CABLE SPLICE TRAYS 1 6 DISTRIBUTION CABLE SPLICE TRAYS 7 12 DISTRIBUTION CABLE SPLICE TR...

Page 38: ...exit points and remove those grommets from their mounting slots in the bottom cover 3 Using a utility knife cut through the slit that runs lengthwise down the center of each grommet as shown in Figur...

Page 39: ...y 3 Starting at the last column left side of tie points on the rear side of the connector panel measure and mark the fiber cut lengths for the distribution cable fiber subunits and the connector panel...

Page 40: ...Tray 8 if Panel 2 Tray 14 if Panel 3 Tray 20 if Panel 4 Tray 26 if Panel 5 5 49 1 Blue Tray 5 if Panel 1 Tray 11 if Panel 2 Tray 17 if Panel 3 Tray 23 if Panel 4 Tray 29 if Panel 5 14 2 Orange 50 2 O...

Page 41: ...ear handle assembly on the back of each connector panel see Figure 23 11 Connector panel designation labels shown in Figure 26 and Figure 27 are provided on the front door of the cabinet for recording...

Page 42: ...BLE CABLE CABLE CABLE CABL FBR FBR FBR FBR FBR FBR CABLE CABLE CABLE CABLE CABLE CABLE FBR FBR FBR FBR FBR FBR CABLE CABLE CABLE CABLE CABLE CABLE FBR FBR FBR FBR FBR FBR CABLE CABLE CABLE CABLE CABLE...

Page 43: ...he fibers transition from the top to the bottom of the splice tray see Figure 29 4 Adjust subunit A so the fiber breakout is positioned at the transition opening 5 Turn the tray over and continue rout...

Page 44: ...m cover and then turn the tray over to the top side 7 Route the breakout fibers at least 1 5 times around the inside of the tray making the loop as large as possible to ensure maximum fiber storage as...

Page 45: ...possible to ensure maximum fiber storage 11 Splice the subunit A fibers to the subunit B fibers as specified by local policies and procedures 12 Replace the splice tray top cover and then turn the spl...

Page 46: ...de of Splice Tray TOP SIDE FIBER BREAKOUT POINT MAKE LOOP AS LARGE AS POSSIBLE TO ENSURE MAXIMUM FIBER STORAGE SUBUNIT A SUBUNIT B SEE NOTE 1 SUBUNIT A TIE POINTS SUBUNIT B TIE POINTS ROUTE FIBER 2 TI...

Page 47: ...72 fiber ports per panel Each distribution cable typically has a fiber count that is a multiple of 72 to correspond with the number of ports provided by each connector panel Depending on the option or...

Page 48: ...s not pre loaded with five connector panels then additional connector panels and round splice trays may be installed as needed Use the following procedure to install additional connector panels in the...

Page 49: ...able mounting position as shown in Figure 35 2 Route the splitter output fibers to the connector storage panel or to the designated customer port Refer to Section 11 for the routing procedure 3 Route...

Page 50: ...ter Input Fibers 4 Remove the splice tray and then coil up the splitter input fiber around the outside edge of the tray for temporary storage 5 Refer to Section 5 4 for the feeder cable and splitter i...

Page 51: ...r from the storage panel and routing it to the appropriate connector panel for connection to the subscriber port 11 1 Storing The Splitter Output Fibers Use the following procedure to store the splitt...

Page 52: ...and the connector ferrule dust cap 3 Select and remove an unused splitter output fiber from the storage panel and carefully work it free of any other fibers 4 Remove the ferrule dust cap from the conn...

Page 53: ...ctory coat of paint Lightly sand the area to be painted and then clean it thoroughly to remove any dirt dust or foreign matter Shake the paint bottle until thoroughly mixed and then apply a light coat...

Page 54: ...then mate the distribution connector with the rear side of the adapter see ADCP 90 159 8 Re install the replacement adapter in the connector panel Make sure the small tab on the adapter is facing up...

Page 55: ...eless Extension 73476 ASIA PACIFIC Sales Administration 65 6294 9948 Technical Assistance 65 6393 0739 ELSEWHERE Sales Administration 1 952 938 8080 Technical Assistance 1 952 917 3475 Italy 0800 7823...

Reviews: