background image

© ABB Automation Products AB  2001

Substation Automation Division

Installation and commissioning manual

REL 505-C1*2.3

Overcurrent protection terminal

About this manual

DocID: 1MRK 506 094-UEN

Issue date: June 2001

Status: New

Version: 2.3

Revision: 00

Summary of Contents for REL 505-C1 2.3 Series

Page 1: ...ts AB 2001 Substation Automation Division Installation and commissioning manual REL 505 C1 2 3 Overcurrent protection terminal About this manual DocID 1MRK 506 094 UEN Issue date June 2001 Status New Version 2 3 Revision 00 ...

Page 2: ...SIBLE THE DATA CONTAINED IN THIS MANUAL IS INTENDED SOLELY FOR THE PRODUCT DESCRIPTION AND IS NOT TO BE DEEMED TO BE A STATEMENT OF GUARANTEED PROPERTIES IN THE INTERESTS OF OUR CUSTOMERS WE CON STANTLY SEEK TO ENSURE THAT OUR PRODUCTS ARE DEVELOPED TO THE LATEST TECHNOLOGICAL STAN DARDS AS A RESULT IT IS POSSIBLE THAT THERE MAY BE SOME DIFFERENCES BETWEEN THE HW SW PRODUCT AND THIS INFORMATION PR...

Page 3: ...Chapter 4 Unpacking and checking the terminal 13 Receiving unpacking and checking 14 Chapter 5 Installing the terminal 15 Overview 16 Mounting the terminal 17 Mounting in a 19 inch rack 18 Mounting in a 19 inch rack with an additional box type RHGS 19 Mounting in a flush or semi flush installation 21 Mounting on a wall 24 Making the electrical connections 26 Connecting the CT circuits 26 Connectin...

Page 4: ...rom a PC 44 Establishing front port communication 44 Establishing rear port communication 44 Downloading the configuration and setting files 46 Chapter 9 Establishing connection and verifying the SPA IEC communication 47 Entering settings 48 Entering SPA settings 48 Entering IEC settings 48 Verifying the communication 50 Verifying SPA communication 50 Verifying IEC communication 50 Chapter 10 Veri...

Page 5: ...pleting the test 76 High speed binary output logic HSBO 77 HSBO trip from communication logic 77 HSBO trip from the high speed function HS 79 HSBO trip from the distance protection zone 1 function ZM1 80 Completing the test 81 Instantaneous overcurrent protection IOC 82 Measuring the operate limit of set values 82 Completing the test 83 Monitoring of AC analogue measurements 84 Monitoring of DC an...

Page 6: ...pleting the test 101 Two step time delayed phase overcurrent protection TOC2 102 Measuring the operate and time limit for set values 102 Completing the test 103 Chapter 11 Verifying the internal configuration 105 Overview 106 Testing the interaction of the distance protection 107 Chapter 12 Testing the protection system 109 Overview 110 Testing the interaction of the distance protection 111 ...

Page 7: ...1 About this chapter Chapter 1 Introduction Chapter 1 Introduction About this chapter This chapter introduces the user to the manual as such ...

Page 8: ...e used as a technical reference during the engineering phase installation and commissioning phase and during the normal service phase The Operator s Manual OM contains instructions on how to operate the protection terminal during normal service after commissioning and before periodic maintenance tests The operator s manual could be used to find out how to handle disturbances or how to view calcula...

Page 9: ...ules such as modems optical con verters etc if included in the terminal The chapter Setting and configuring the terminal contains instructions on how to download settings and configuration to the terminal The chapter Establishing connection and verifying the SPA IEC communication contains instructions on how to enter SPA IEC settings and verifying the SPA IEC communication The chapter Verifying se...

Page 10: ... ing protection equipment test equipment protection functions and the configured functional logics in the protection 1 4 Related documents 1 5 Revision notes Documents related to REL 505 C1 2 3 Identity number Operator s manual 1MRK 506 092 UEN Installation and commissioning manual 1MRK 506 094 UEN Technical reference manual 1MRK 506 093 UEN Application manual 1MRK 506 115 UEN Technical overview b...

Page 11: ...ormation Chapter 2 Safety information About this chapter This chapter contains safety information Warning signs are presented which attend the user to be careful during certain operations in order to avoid human injuries or damage to equipment ...

Page 12: ...age which is lethal to humans Warning Always use suitable isolated test pins when measuring signals in open circuitry Poten tially lethal voltages and currents are present Warning Never connect or disconnect a wire and or a connector to or from a terminal during normal operation Hazardous voltages and currents are present that may be lethal Op eration may be disrupted and terminal and measuring ci...

Page 13: ...r s secondary winding Operating a current transformer with the secondary winding open will cause a massive potential build up that may damage the transformer and may cause injuries to humans Warning Never unmount the front or back cover from a powered terminal or from a terminal con nected to powered circuitry Potentially lethal voltages and currents are present ...

Page 14: ...rface Electrostatic discharge ESD may cause damage to the module Caution Do not connect live wires to the terminal Internal circuitry may be damaged Caution Always use a conductive wrist strap connected to protective ground when replacing modules Electrostatic discharge ESD may damage the module and terminal circuit ry Caution Take care to avoid electrical shock if accessing wiring and connection ...

Page 15: ...ration Be careful and check regulations before making the change Note The protection assembly is designed for a maximum continuous current of four times rated value Note Activating the setting lockout function which prevents unauthorised changes of the set tings without proper configuration may seriously affect the terminal s operation ...

Page 16: ...10 Note signs Chapter 2 Safety information ...

Page 17: ...11 About this chapter Chapter 3 Overview Chapter 3 Overview About this chapter This chapter introduces the user to the installation and commissioning tasks ...

Page 18: ...stem has to be checked in order to verify that the installation was successful The installation and commissioning task starts with configuring the digital communica tion modules if included The terminal can then be configured and set which means that settings and a configuration has to be applied if the terminal does not have a factory configuration downloaded Then the operation of each included f...

Page 19: ...13 About this chapter Chapter 4 Unpacking and checking the terminal Chapter 4 Unpacking and checking the terminal About this chapter This chapter contains instructions on how to receive the terminal ...

Page 20: ...delivery documents after the terminal has been energised 4 Check for transport damages In case of transport damage appropriate action must be taken against the latest carrier and the nearest ABB office or representa tive should be informed ABB should be notified immediately if there are any discrepancies in relation to the delivery documents Store the terminal in the original transport casing in a...

Page 21: ...15 About this chapter Chapter 5 Installing the terminal Chapter 5 Installing the terminal About this chapter This chapter describes how to install the terminal ...

Page 22: ...e to rapid temperature variations powerful vibrations and shocks surge voltages of high amplitude and fast rise time strong induced magnetic fields or similar extreme conditions should be avoided Sufficient space must be available in front of and at rear of the terminal to allow access for maintenance and future modifications Flush mounted terminals should be mounted so that terminal modules can b...

Page 23: ... section 2 1 Side by side mounting kit See section 2 2 Flush mounting kit See section 2 3 Semi flush mounting kit See section 2 3 Wall mounting kit See section 2 4 Most of the REx 5xx terminals can be rack flush semi flush or wall mounted with the use of different mounting kits An additional box of type RHGS can be mounted to one side of a 1 2 or 3 4 terminal The 1 1 of 19 inches wide terminal can...

Page 24: ...18 Mounting the terminal Chapter 5 Installing the terminal 2 1 Mounting in a 19 inch rack Figure 1 19 inch rack mounting PosNo Description 1 and 4 Mounting angle 2 and 3 TORX T20 screws 98000037 1 2 3 4 ...

Page 25: ... assembly in the rack 3 Fasten the mounting angles with appropriate screws 2 2 Mounting in a 19 inch rack with an additional box type RHGS Make sure a side by side mounting kit and a suitable 19 inch rack mounting kit are available before proceeding Assemble the two terminals by using a side by side mounting kit Then mount the brackets and install the assembled terminals in the rack as described i...

Page 26: ...ounting the terminal Chapter 5 Installing the terminal Figure 2 Side by side assembly PosNo Description 1 and 3 Side by side mounting plate 2 and 4 Screws TORX T20 5 Mounting angle xx00000097 ai 2 1 3 4 5 5 ...

Page 27: ... by side mounting plate Use the remaining four screws 5 Follow the instructions in section 2 1 to mount the mounting angles PosNo 5 and install the side by side assembly in the rack 2 3 Mounting in a flush or semi flush installation Make sure a flush or semi flush mounting kit is available before proceeding The procedure for flush and semi flush mounting is mainly the same In semi flush mounts a d...

Page 28: ...e terminal Figure 3 Flush and semi flush mounting PosNo Description 1 Sealing strip 2 Distance frame only for semi flush 3 Sealing strip for distance frame only for semi flush 4 Side holder 5 Groove 6 Locking screw TORX T10 xx00000129 eps 1 2 3 4 5 6 ...

Page 29: ... distance frame 2 Dispose the strip remains The remains should be source separated as soft plastic 3 Carefully press the cut strips into the front panel groove 4 Adhere the cut strips posNo 3 to the edge of the distance frame posNo 2 semi flush mounting only 5 Make a panel cut out See the Technical reference manual for cut out dimensions 6 Insert the terminal into the cut out 7 Add and lock the si...

Page 30: ...r to maintain a good and even seal in IP 54 environments 2 4 Mounting on a wall The mounting bars are prepared for adding DIN rails or equivalent above and below the mounted terminal If used make sure all necessary parts such as rails and terminal blocks are available before starting Make sure the wall mounting kit is available Figure 4 Wall mounting PosNo Description 1 Mounting bar 2 Side plate x...

Page 31: ...he terminal blocks on the DIN rail s It is much easier to do this without the unit in place 4 Make all electrical connections to the terminal blocks It is much easier to do this without the unit in place 5 Mount the side plates posNo 2 to the terminal 6 Mount the terminal to the mounting bars 2 4 2 Preparing a wall mounted terminal for electrical installation Procedure 1 Remove all screws from one...

Page 32: ...ted using back side mounted screw connectors Use a solid conductor with a cross section area between 2 5 6 mm2 AWG20 10 or a stranded conductor with a cross section area between 2 5 4 mm2 3 2 Connecting the auxiliary power VT and signal connectors Auxiliary power VTs and signals are connected using COMBICON Phoenix technol ogy plug in screw connectors Procedure 1 Connect signals to the COMBICON pl...

Page 33: ...4 Making the screen connection When using screened cables always make sure screens are grounded and connected in according to applicable engineering methods This may include checking for appropri ate grounding points near the terminal for instance in the cubicle and or near the source of measuring Ensure that ground connections are made with short max 10 cm con ductors of an adequate cross section...

Page 34: ...ors to black or grey transmit back side connectors Fiber optical cables are sensitive to handling Do not bend too sharply The minimum curvature radius is 15 cm for plastic fibers and 25 cm for glass fibers If cable straps are used apply with loose fit Caution Always hold the connector never the cable when connecting or disconnecting optical fibres Do not twist pull or bend the fibre Invisible dama...

Page 35: ...the external circuitry About this chapter This chapter describes what to check and which checks that should be made to ensure a correct connection to the external circuitry such as auxiliary power supply CT s and VT s These checks must be made with the protection terminal de energised ...

Page 36: ...xternal circuitry 1 Overview The user must check the installation which includes verifying that the terminal is con nected to the other parts of the protection system This is done with the terminal and all connected circuits de energised ...

Page 37: ... Grounding check The polarity check verifies the integrity of the circuits and the phase relationship The check should be performed as close as possible to the terminal The primary injection test verifies the CT ratio and the wiring all the way through from the primary system to the terminal Injection must be performed for each phase to neu tral circuit and each phase to phase pair In each case cu...

Page 38: ... circuitry 3 Checking the power supply Check that the value of the auxiliary supply voltage remains within the permissible range under all operating conditions Check that the polarity is correct according to the technical data on the front plate on the terminal ...

Page 39: ...t connector from the binary input cards Check all connected signals so that both input level and polarity are in accordance with the termi nal s specifications 4 2 Binary output circuits Preferably disconnect the binary output connector from the binary output cards Check all connected signals so that both load and polarity are in accordance with the terminal s specifications ...

Page 40: ...34 Checking the binary I O circuits Chapter 6 Checking the external circuitry ...

Page 41: ...bout this chapter Chapter 7 Energising the terminal Chapter 7 Energising the terminal About this chapter This chapter describes the start up sequence and what to check after the terminal has been enerigsed ...

Page 42: ...ng a whole cubicle to energising a single ter minal The user should reconfigure the terminal to activate the hardware modules in or der to enable the self supervision function detect eventual hardware errors Then the terminal time must be set The self supervision function should also be checked to ver ify that the terminal unit operates properly The user could also check the software ver sion the ...

Page 43: ... Ready A steady green light indicates a successful startup If the upper row in the window indicates Fail instead of Ready and the green LED is flashing an internal failure in the terminal has been detected See the self supervision function in this chapter to investigate the fault After startup the appearance of the local HMI should be as shown in figure 6 Figure 6 Example of the local HMI for in t...

Page 44: ...t type present in the connected slot Procedure 1 Browse to the Reconfigure menu The Reconfigure menu is located in the local HMI under Configuration I O modules Reconfigure 2 Select Yes and press E 3 2 Setting the terminal time This procedure describes how to set the terminal time 1 Display the set time dialog Navigate the menus to Settings Time Press the E button to enter the dialog 2 Set the dat...

Page 45: ...sion HMI data Table 1 Output signals for the self supervision function Indicated result Reason Action InternFail OK No problem detected None InternFail Fail A failure has occurred Check the rest of the indicated results to find the fault InternWarning OK No problem detected None InternWarning Warning A warning has been issued Check the rest of the indicated results to find the fault MPM modFail OK...

Page 46: ...ion has failed Check that the I O module has been config ured and connected to the IOP1 block If the problem persists contact your ABB representative for service RealTimeClock OK No problem detected None RealTimeClock Warning The real time clock has been reset Set the clock TimeSync OK No problem detected None TimeSync Warning No time synchroniza tion Check the synchronization source for prob lems...

Page 47: ... describes how to set the terminal either through a PC or the local HMI and download a configuration to the terminal in order to make commissioning possible The chapter does not contain instructions on how to create a configuration or calculate settings Please consult the application manual for further information about how to cal culate settings ...

Page 48: ... configuration tool to verify if the terminal has the expected configu ration A new configuration is performed with the CAP tool The binary outputs can be selected from a signal list where the signals are grouped under their function names It is also possible to specify a user defined name for each input and output signal All settings can be Entered manually through the local HMI Downloaded from a...

Page 49: ...n the local HMI See the technical reference manual for a complete list of setting parameters for each func tion Some of the included functions may not be used In this case the user can set the parameter Operation to Off to disable the function Some settings can only be set through the local HMI such as the setting access and the slave and baud rate when communicating with a PC software The setting...

Page 50: ... sub con tact This ensures a disturbance free and safe communication with the terminal When communicating from a PC the slave number and baud rate communication speed settings must be equal in the PC program and in the REx 5xx terminal Procedure 1 Plug the cable to the optical contact on the local HMI 2 Plug the other end of the cable to the COM port of the PC 3 Set the slave number and baud rate ...

Page 51: ... slave number and baud rate communication speed settings must be equal in the PC program and in the REx 5xx terminal Using the SPA rear port The slave number and baud rate settings of the rear SPA IEC 870 5 103 port on the REx 5xx terminal for SPA bus communication is done on the local HMI at Configuration TerminalCom SPACom Rear Using IEC 870 5 103 rear port The slave number and baud rate setting...

Page 52: ... uration tool the terminal is automatically set in configuration mode When the terminal is set in configuration mode all functions are blocked The red LED on the terminal flashes and the green LED is lit while the terminal is in the configuration mode When the configuration is downloaded and completed the terminal is automatically set into normal mode For further instructions please refer to the u...

Page 53: ... 9 Establishing connection and verifying the SPA IEC communication About this chapter This chapter contains instructions on how to establish connection and verify that the SPA IEC communication operates as intended when the terminal is connected to a monitoring or control system via the rear SPA IEC port ...

Page 54: ...dure 1 Set the operation of the rear SPA IEC port to SPA The operation of the rear SPA IEC port can be found on the local HMI at Configuration TerminalCom SPA IECPort Now the SPA IEC port operates as a SPA port 2 Set the slave number and baud rate for the rear SPA port The slave number and baud rate can be found on the local HMI at Configuration TerminalCom SPACom Rear Set the same slave number an...

Page 55: ...erminal 3 Set the main function type of the terminal The main function type can be found on the local HMI at Configuration TerminalCom IECCom FunctionType The main function type can be set to values from 1 to 255 accord ing to the standard The value zero is default and corresponds to not used Examples of values that can be used are Table 2 Main function type examples If the setting OpFnType is set...

Page 56: ...f the different functions in the terminal verify that the events and indications in the SMS SCS system are as expected 2 2 Verifying IEC communication To verify that the IEC communication with the IEC master system is working there are some different methods Choose one of the following Procedure 1 Use a protocol analyzer and record the communication be tween the terminal and the IEC master Check i...

Page 57: ...y secondary injection Chapter 10 Verifying settings by secondary injection About this chapter This chapter describes how to verify that the protection functions operates correctly ac cording to the settings Only the tested function should be in operation ...

Page 58: ...nt should be able to provide a three phase supply of voltages and cur rents The magnitude of voltage and current as well as the phase angle between voltage and current must be variable The voltages and currents from the test equipment must be obtained from the same source and they must have a very small harmonic contents If the test equipment cannot indicate the phase angle a separate phase angle ...

Page 59: ...al is designed for a maximum continuous current of four times the nominal current Note Please observe the measuring accuracy of the terminal the test equipment and the an gular accuracy for both of them Note Please consider the configured logic from the function block to the output contacts when measuring the operate time ...

Page 60: ...trieve signals and parameters names etc 2 2 Preparing the connection to the test equipment The REx 5xx terminal can be equipped with a test switch of type RTXP 24 The test switch and its associated test plug handle RTXH 24 are a part of the COMBITEST system which gives a secure and convenient testing of the terminal The test handle can be plugged into the test switch or withdrawed from the test sw...

Page 61: ...tedly displays Busy and after that the yellow LED starts flashing which indicates that the terminal is in test mode 2 4 Connecting test equipment to the terminal Before testing connect the testing equipment according to the valid terminal diagram for each specific REx 5xx terminal Pay special attention to the correct connection of the input and output current terminals and to the connection of the...

Page 62: ...ent and voltage at rated value 2 Compare the injected value with the measured value The phasor menu is located in the local HMI under ServiceReport Phasors Primary and Secondary Consider set ratio factors for CT s and VT s 3 Compare the frequency reading with the set frequency and the direction of the power with the injected power The frequency and active power are located in the local HMI un der ...

Page 63: ...Before starting a new test mode session the user should scroll through every function to ensure that only the function to be tested and the interconnected ones are set to NO A function is also blocked if the BLOCK input signal on the corresponding function block is active which depends on the configuration The user should therefore ensure that the logical status of the BLOCK input signal is equal ...

Page 64: ...rt settings The terminal must be set in testmode Operation ON to activate the disturbance report settings The user can select how the disturbances are indicated on the local HMI during the test The user can for example select if the disturbance summary should be stored scrolled on the local HMI or if LED information should be stored Scroll to the disturbance re port settings which are located in t...

Page 65: ... HMI but not stored in the terminal Disturbance summary is scrolled automatically on the local HMI for the two latest recorded disturbances until cleared The information is not stored in the terminal On On or Off The disturbance report works as in normal mode Disturbances are stored Data can be read from the local HMI a front connected PC or SMS LED information yellow start red trip is stored The ...

Page 66: ...or the distance protection function ZCOM or ZC1P 3 1 Current reversal logic It is possible to check the delay of the ZCOM CS ZC1P CSLn carrier send signal with tDelay by changing from a reverse to a forward fault By continuously activating the ZCOM CR ZC1P CRLn input and changing from a re verse to a forward fault the delay tDelay can be checked 3 1 1 Checking of current reversal Procedure 1 Activ...

Page 67: ...ic at permissive schemes Procedure 1 Check the blocking of the echo with the injection of a ZCOM CR or ZC1P CRLn signal 40 ms after a reverse fault is ap plied 2 Measure the duration of the echoed signal by applying a ZCOM CR or ZC1P CRLn carrier receive signal 3 Check the trip functions and the voltage level for trip by re ducing a phase voltage and applying a ZCOM CR or ZC1P CRLn carrier receive...

Page 68: ...f the input signals 4 Check that trip carrier send signal and indication are ob tained 5 Repeat the procedure for other phases Only when ZC1P is used Weak end infeed set for echo 1 Apply input signals according table 4 2 Activate the carrier receive ZCOM CR or ZC1P CRLn signal of the terminal 3 After the relay has operated turn off the input signals 4 Check that the carrier send signal is obtained...

Page 69: ... the polarising voltage 3U0 to 5 of Ub and the phase angle between voltage and current to 155 the current lead ing the voltage 2 Inject current 155 leading the voltage in one phase to about 110 of the setting operating current IN Dir 3 Check that the EFCA IRVL output is activated after the set time tPickUp 4 Abruptly reverse the current to 65 lagging the voltage to op erate the forward directional...

Page 70: ...ivate the EFCA CRL binary input No EFCA ECHO and EFC CS should appear 9 Switch off the polarising voltage and reset the EFCA BLOCK and EFCA CRL binary input 4 2 2 If setting WEI Trip Procedure 1 Inject the polarising voltage 3U0 to about 90 of the setting Ugr operating voltage 2 Activate the EFCA CRL binary input No EFCA ECHO EFC CS and EFCA TRWEI outputs should appear 3 Increase the injected volt...

Page 71: ...ate the EFCA CRL binary input No EFCA ECHO EFC CS and EFCA TRWEI should appear 13 Abruptly reverse the current to 65 lagging the voltage to op erate the forward directional element No EFCA ECHO EFC CS and EFCA TRWEI should appear 14 Switch off the current and check that the EFCA ECHO EFC CS and EFCA TRWEI appears on the corresponding bi nary output or on the local HMI unit about 200 ms after reset...

Page 72: ...ignals to logical 0 and note on the local HMI that the TEF TRIP and the TEF TRSOTF signal is not ac tivated logical 0 Values of the logical signals belonging to the time delayed residual overcurrent protection are available under menu tree ServiceReport Functions EarthFault TimeDelayEF 2 Set the polarising voltage to 2 of Ub and the phase angle be tween voltage and current to 65 the current laggin...

Page 73: ...en voltage and current to 65 8 Check the operate current of the IMin function The function activates the TEF START output 9 When independent time delay definite is selected check the operate time of the t1 timer by injecting a current two times the set IMin operate value When inverse time delay is selected check the operate time at three points of the inverse characteristic The formulas for operat...

Page 74: ...he phase angle of the polarising voltage to ϕ 245 and check that the directional current function and the switch onto fault logic gives no operation when the current is in the reverse direction 13 Connect the rated DC voltage to the TEF BLOCK configured binary input and switch on the fault current No TEF TRIP nor TEF START signal should appear 14 Switch off the fault current Characteristics Operat...

Page 75: ... by secondary injection 15 Connect the rated DC voltage to the TEF BLKTR configured binary input and switch on the fault current No TEF TRIP nor TEF TRSOTF should appear But the output TEF START shall be activated 16 Continue to test another function or complete the test by set ting the test mode to off ...

Page 76: ...test mode from the PST The functionality of the event reporting during test mode is set from the PST as follows Use event masks Report no events Report all events In Test Mode individually event blocks can be blocked from the PST Individually event blocks can also be blocked from the local HMI under the menu Test TestMode BlockEventFunc ...

Page 77: ...vent recorder Chapter 10 Verifying settings by secondary injection 7 Event recorder During testing the event recorder can be switched off if desired This is found in the SMS or Substation Control System SCS ...

Page 78: ...under the menu Service Report Functions FuseFailure FuncOutputs 8 1 Checking that the binary inputs and outputs operate as expected Procedure 1 Simulate normal operating conditions with the three phase currents in phase with their corresponding phase voltages and with all of them equal to their rated values 2 Connect the nominal dc voltage to the FUSE DISC binary in put The signal FUSE VTSU should...

Page 79: ...and observe the corresponding output sig nals They should change to the logical 0 as follows Signal FUSE VTF3PH after about 25 ms Signal FUSE VTSU after about 50 ms Signal FUSE VTSZ after about 200 ms 8 2 Measuring the operate value for the negative sequence function Measure the operate value for the negative sequence function if included in the termi nal Procedure 1 Simulate normal operating cond...

Page 80: ...currents in phase with their corresponding phase voltages and with all of them equal to their rated values 2 Slowly decrease the measured voltage in one phase until the FUSE VTSU signal appears 3 Record the measured voltage and calculate the correspond ing zero sequence voltage according to the equation Observe that the voltages in the equation are phasors Equation 6 4 Compare the result with the ...

Page 81: ...FUSE VTSZ signals appear without any time delay If the remaining voltage levels are higher than the set U of the DLD function only a pulse is achieved FUSE VTF3PH should appear after 5 seconds if the remaining voltage levels are lower than the set U of the DLD function 4 Apply normal conditions as in step 1 The FUSE VTSU FUSE VTSZ and FUSE VTF3PH signals should reset if activated See step 3 5 Chan...

Page 82: ...y injection 10 Keep the current constant Disconnect the voltage in all three phases simultaneously The FUSE VTSU FUSE VTSZ and FUSE VTF3PH signals should not appear 8 5 Completing the test Continue to test another function or complete the test by setting the test mode to off ...

Page 83: ...als at the backing function from which the internal signals are derived ZC1P ZCOM or TRIP Test for three of the trip schemes in ZC1P Blocking Scheme not included Procedure 1 Apply inputs in different combinations to ZC1P CACCLn ZC1P CRLm ZC1P CRMPH and check the outputs of HSBO TRLx For each trip test the blocking action for all three HSBO blocking inputs and ZC1P BLOCK Check results ac cording to...

Page 84: ...t the blocking action for all three HSBO block ing inputs ZCOM BLOCK and TRIP BLOCK Check results according to the used scheme and trip program ZCOM SchemeType Intertrip TRIP Program 1 2 3ph When PSLn is applied in the same time as CR a trip output should appear in the n phase s HSBO TRLn ZCOM SchemeType PermissiveUR TRIP Program 1 3ph When PSLn is applied in the same time as CACC and CR a trip ou...

Page 85: ...elong to the high speed function It should also be possible to block the output signals at the backing function from which the internal signals are derived HS High speed trips will also be initiated by the HS function block Use the 3 phase test set to achieve the specified conditions Suggested fault characteristics for all types of faults Fault current at least 2 times Ir Prefault conditions Uphas...

Page 86: ...the HS function off as well Whenever a trip appears during these tests it should be possible to block it through the function input HSBO BLKHSTR Note that no carrier send will be issued from the distance protection function zone 1 Activation of HSBO BLKZCTR or HSBO BLKHSCS should not block any outputs in this test Use the 3 phase test set to achieve the specified conditions Suggested fault charact...

Page 87: ...h YES 2 Remove applied signals 3 Set the terminal in normal service Table 7 Output signals for different fault types 9 4 Completing the test Continue to test another function or complete the test by setting the test mode to off Fault type Signal L1 L2 L3 L1 L2 L2 L3 L3 L1 L1 L2 L3 HSBO TRL1 YES YES YES YES HSBO TRL2 YES YES YES YES HSBO TRL3 YES YES YES YES HSBO CSL1 HSBO CSL2 HSBO CSL3 HSBO CSMPH...

Page 88: ...cedure 1 Inject a phase current in the terminal with start below the set ting value 2 Increase the injected current in the Ln phase until the IOC TRLn n 1 3 signal appears 3 Switch off the fault current Observe the maximum permitted overloading of the current cir cuits in the terminal 4 Compare the measured operating current with the set value 10 1 2 Residual overcurrent protection non dir Procedu...

Page 89: ...Instantaneous overcurrent protection IOC Chapter 10 Verifying settings by secondary injection 10 2 Completing the test Continue to test another function or complete the test by setting the test mode to off ...

Page 90: ...magnitude of input measured quantities within the limits of de clared accuracy The mean service values are available under the submenu Service Report ServiceValues The phasors of up to five input currents and voltages are available under the submenu Service Report Phasors Primary 2 Check the operation of ADBS or IDBS when applicable Com pare with the expected values The operation of ADBS or IDBS f...

Page 91: ... the need to block output signals 2 Check that the values presented on the HMI module corre sponds to the magnitude of input direct current within the lim its of declared accuracy The service value is available under the submenu Service Report I O Slotnm MIMx MIxy Value 3 Check the operation of ADBS or IDBS function when applica ble Compare with the expected values The operation of ADBS or IDBS fu...

Page 92: ...of input current and observing the operation of the cor responding output relays The output contact changes its state when the changes in the input measuring quantity are higher than the set values RMAXAL HI WARN HIALARM or lower than the set values LOWWARN LOWALARM RMINAL 5 Continue to test another function or complete the test by set ting the test mode to off ...

Page 93: ...c tions Reading of the values must be possible The terminal must not respond to any attempt to change the setting value or configuration 5 Disconnect the control DC voltage from the selected binary input 6 Repeat the attempt under step 4 The terminal must accept the changed setting value or configura tion 7 Depending on the requested design for a complete REx 5xx terminal leave the function active...

Page 94: ...COM CR and ZCOM CRG inputs with the overreaching zone used to achieve the ZCOM CACC signal It is sufficient to activate the zones with only one type of fault with the secondary in jection 14 1 Testing permissive underreach Procedure 1 Activate carrier receive ZCOM CR signal of the terminal 2 Supply the relay with healthy conditions for at least two sec onds 3 Apply a fault condition within the per...

Page 95: ...c onds 8 Apply a fault condition within the permissive zone 9 Check that trip time complies with the zone timers and that correct trip outputs external signals and indication are ob tained for the actual type of fault generated 14 3 Testing blocking scheme Procedure 1 Deactivate the carrier receive ZCOM CR signal of the termi nal 2 Supply the relay with healthy conditions for at least two sec onds...

Page 96: ...re obtained for the actual type of fault generated 14 4 Checking of unblocking logic Check the unblocking function if the function is required when you check the com munication scheme 14 4 1 Command function with continuous unblocking Unblock 1 Procedure 1 Activate the carrier guard input signal ZCOM CRG of the ter minal 2 Using the scheme selected check that a carrier accelerated trip ZCOM TRIP i...

Page 97: ...weak end infeed functions shall be tested together with the permissive scheme 15 1 Testing the directional comparison logic function 15 1 1 Blocking scheme Procedure 1 Inject the polarising voltage 3U0 to 5 of Ub and the phase angle between voltage and current to 65 the current lagging the voltage 2 Inject current 65 lagging the voltage in one phase to about 110 of the setting operating current an...

Page 98: ...tch on the fault current 110 of the setting and wait long er than the set value tCoord No EFC TRIP signal should appear and the EFC CS binary out put should be activated 4 Switch off the fault current 5 Activate the EFC CR binary input 6 Switch on the fault current 110 of the setting and measure the operating time of the EFC logic Use the EFC TRIP signal from the configured binary output to stop t...

Page 99: ...t the active setting group The ActiveGroup menu is located in the local HMI under ServiceReport ActiveGroup 3 Connect the appropriate dc voltage to the corresponding bi nary input of the terminal and observe the information pre sented on the HMI display The displayed information must always correspond to the activat ed input 4 Check that corresponding output indicates the active group 5 Continue t...

Page 100: ...low the set ting value 2 Increase the injected current measured current in the Ln phase until the starting signal TOC STLn n 1 3 appears 3 Switch off the fault current Observe the maximum permitted overloading of the current cir cuits in the terminal 4 Compare the measured operating current with the set value IP 5 Set the fault current to about 1 5 times the measured operat ing current 6 Switch on...

Page 101: ...al 4 Compare the measured operating current with the set value IN 5 Set the fault current to about 1 5 times the measured operat ing current 6 Switch on the fault current and measure the operating time of the TOC protection Use the TOC TRN signal 7 Compare the measured time with the set value tN 17 2 Completing the test Continue to test another function or complete the test by setting the test mod...

Page 102: ... TRL2 TRIP TRL3 and TRIP TR3P 18 2 1ph 3ph operating mode The following tests should be carried out in addition to some other tests which depends on the complete configuration of a terminal Procedure 1 Initiate one by one different single phase to earth faults Consider sufficient time interval between the faults to overcome a reclaim time of eventually activated autoreclosing function Only a singl...

Page 103: ...ncluded in protection scheme Check that the second trip is a three phase trip 18 3 1ph 2ph 3ph operating mode The following tests should be carried out in addition to some other tests which depends on the complete configuration of a terminal Procedure 1 Initiate one by one different single phase to earth faults Consider sufficient time interval between the faults to overcome a reclaim time of even...

Page 104: ...RIP TRIP TRIP TR1P and the corresponding phase signal TRIP TRLn should be active at each fault 5 Initiate a single phase to earth fault and switch it off immedi ately when the trip signal is issued for the corresponding phase Initiate the second single phase to earth fault in one of the remaining phases within the time interval shorter than two seconds and shorter than the dead time of the autore ...

Page 105: ...lt type should be tested One for a phase to earth fault 19 1 Measuring the operate and time limit for set values 19 1 1 Measuring the operate limit of the low step overcurrent protection Procedure 1 Inject a phase current slightly smaller than the functional val ue I Low 2 Increase the current slowly and check the function value by observing when the signal TOC3 STNDLS appears 3 Compare the result...

Page 106: ... protection 1 Set temporarily tHigh 0 000 s 2 Inject a phase current slightly smaller than the operation val ue I High and three phase symmetrical voltage if directional 3 Increase the current slowly and check the operation value by observing when the signal TOC3 TRHS appears 4 Compare the result of the measurement with the set value 5 Set tHigh to the correct value 6 Set a current 1 5 times I Hig...

Page 107: ...g settings by secondary injection 2 Slowly decrease the impedance angle to find the operating value according to figure 9 3 Compare the result of the measurement with the set value 19 2 Completing the test Continue to test another function or complete the test by setting the test mode to off ...

Page 108: ...hase current slightly smaller than the functional val ue I Low 2 Increase the current slowly and check the function value by observing when the signal TOC2 STLS appears 3 Compare the result of the measurement with the set value 20 1 2 Measuring the definite time delay of the low set stage 1 Set a current 1 5 times I Low on the injection test equipment 2 Switch the current on and compare the operat...

Page 109: ...ction 1 Set temporarily tHigh 0 000 s 2 Inject a phase current slightly smaller than the operation val ue I High 3 Increase the current slowly and check the operation value by observing when the signal TOC2 TRHS appears 4 Compare the result of the measurement with the set value 5 Set tHigh to the correct value 6 Set a current 1 5 times I High on the injection test equipment 7 Switch the current on...

Page 110: ...104 Two step time delayed phase overcurrent protection TOC2 Chapter 10 Verifying settings by secondary injection ...

Page 111: ...1 Verifying the internal configuration About this chapter The aim of this chapter is to verify that the internal communications and output signals are according to the specification and normal protection praxis This means that all in cluded protection functions must be in operation ...

Page 112: ...ices that are involved in the fault clearance process must have been tested as individuals and set in operation The breaker must be ready for an open close open cycle The shaping of the test process is dependent on the complexity of the design of the switchyard Hereby follows some items which could be used as guidelines ...

Page 113: ...re 1 Make sure that the protection terminal and fitting breaker s to be tested are in service 2 Connect the test equipment to the terminal 3 Set the test equipment so that the impedance present to the relay is half the set value 4 Energise the protection terminal and evaluate the result i e Check that correct trip has been accomplished according to con figuration and philosophy Check that all bina...

Page 114: ...108 Testing the interaction of the distance protection Chapter 11 Verifying the internal configuration ...

Page 115: ...ter Chapter 12 Testing the protection system Chapter 12 Testing the protection system About this chapter This chapter describes how to verify the conformity of the protection system without the protected object energised ...

Page 116: ...final test that should be carried out before the protected object is taken into service Due to the complexity in combination with already performed tests it is not necessary to test all protection functions and all fault types in this process The most important protection functions in the terminal for single line to earth fault and phase phase fault could be choose for the test The shaping of the ...

Page 117: ...sequence 5 Simulate the condition for the synchro check as for live bus and dead line 6 Energise the protection terminal and evaluate the result i e Check that correct trip has been accomplished according to con figuration and philosophy Check that the autoreclosure have made an reclosing of the pro tected object Check that activation of all other external devices have been ac complished according...

Page 118: ... interaction of the distance protection Chapter 12 Testing the protection system It is recommended to repeat the procedure 1 6 for a protection function which detects earth faults i e residual overcurrent protec tion ...