background image

1473-1-8136  

  Rev. 01  

  11.2012 

Operating Instructions 

Busch-Wächter

®

 

 

 

 

Pos: 2 /#Neustruktur#/Online-Dokumentation (+KNX)/Titelblätter/Waechter/Titelblatt - 6747 WaveLINE @ 28\mod_1347265067099_15.docx @ 232467 @  @ 1 

 

 
6747-500 AGM-… 
220 WaveLINE 
 

 
 

 

 

 

 

 
 

 

=== Ende der Liste für Textmarke Cover === 

 

Summary of Contents for Busch-Watchdog 220 WaveLINE

Page 1: ...2 Operating Instructions Busch Wächter Pos 2 Neustruktur Online Dokumentation KNX Titelblätter Waechter Titelblatt 6747 WaveLINE 28 mod_1347265067099_15 docx 232467 1 6747 500 AGM 220 WaveLINE Ende der Liste für Textmarke Cover ...

Page 2: ...on coverage 6 5 Technical data 7 6 Installation and electrical connection 8 6 1 Requirements for the electrician 8 6 2 Mounting 9 6 2 1 Installation sites 9 6 2 2 Preparing the installation 10 6 2 3 Mounting steps 11 7 Commissioning 13 7 1 Setting limiting the coverage and the detection range 13 7 2 Activation test 14 8 Operation 15 8 1 Control elements 15 8 2 Operation mode 15 8 2 1 Test operatio...

Page 3: ...hriften Für alle Dokumente 1 Ebene U Z Umwelt 18 mod_1302614158967_15 docx 103383 1 1 3 Environment Pos 10 2 Neustruktur Online Dokumentation KNX Sicherheitshinweise und Hinweise Für alle Dokumente Hinweise Hinweis Umwelt Hinweis Elektrogeräte 18 mod_1302763973434_15 docx 103500 1 Consider the protection of the environment Used electric and electronic devices must not be disposed of with domestic ...

Page 4: ...nfrared movement detectors which switch loads via the KNX bus when sources of heat move within its detection range Busch Watchdog is not an intrusion or attack alarm Pos 14 Neustruktur Online Dokumentation KNX Überschriften Für alle Dokumente 2 Ebene A F Funktions und Ausstattungsmerkmale 23 mod_1336557630140_15 docx 209136 222222333332233 1 4 1 Features of function and equipment Pos 15 Neustruktu...

Page 5: ...rveillance if mounted to the ceiling at a maximum height of 2 5 m Pos 20 Neustruktur Online Dokumentation KNX Überschriften Für alle Dokumente 3 Ebene A F Erfassungsbereiche Reduzierung 29 mod_1347612043430_15 docx 233618 111111111111213233223322 1 4 2 3 Limitation of the detection range Pos 21 DinA4 Anleitungen Online Inhalt Waechter Erfassungsbereiche Einengung 220 28 mod_1347374980807_15 docx 2...

Page 6: ...Approx 100 Walls ceilings and similar obstacles reduce the radio transmission coverage The following approximate values can be expected Material surface Guideline values Wood plaster uncoated glass 70 100 Bricks chipboard 65 95 Reinforced concrete 10 90 Metal aluminium lamination 0 10 Fire walls lift wells staircases and supply areas are considered as separating walls just like the installation of...

Page 7: ... installed 2 5 m high 16 m Radio control range free field 100 m Transmitter frequency 868 3 MHZ Forced switch off min 180 Operating temperature 25 55 C Protection type IP 55 Pos 28 Neustruktur Online Dokumentation KNX Sicherheitshinweise und Hinweise Für alle Dokumente Hinweise Allgemein Hinweis Anschluss von EVG s Herstellerangaben 24 mod_1338458660462_15 docx 214629 1211323233223222 1 Informatio...

Page 8: ...docx 209179 22222222222222222223222222 1 6 1 Requirements for the electrician Warning Electric voltage Install the device only if you have the necessary electrical engineering knowledge and experience Incorrect installation endangers your life and that of the user of the electrical system Incorrect installation can cause serious damage to property e g due to fire The minimum necessary expert knowl...

Page 9: ...stem may only be performed by authorised electricians Disconnect the mains power supply prior to installation and or disassembly Pos 36 Neustruktur Online Dokumentation KNX Montage Waechter Montage 6747 28 mod_1347265188412_15 docx 232508 22222222222233333223333 1 Caution Risk of damaging the device The lens of the device is sensitive and can easily sustain damage Do not press on the lens when ope...

Page 10: ...ng the installation No Function 1 Locking screw 2 5 Clamps 1 Remove the locking screw 1 if installed 2 Press in clamps 2 5 on the sides of the housing with a suitable tool 3 Carefully remove the front of the device Fig 5 Opening the water drain Depending on where the device is installed the water drain may have to be opened To do this pierce the plastic membrane on the bottom of the device The ins...

Page 11: ...1 Mount the device to the wall Do not use countersunk head screws for mounting to the wall Use screws with a head diameter of 6 5 mm 8 5 mm 2 Open the battery compartment Insert the enclosed type AAA batteries Pay particular attention to the battery poles Note Do not use zinc carbon batteries as replacement 6 5 mm 8 5 mm 3 5 mm 3 9 mm ...

Page 12: ...of the Busch Watchdog Latch the upper part of the device onto the base 4 To protect the device against unauthorized opening the enclosed screw can be used on the bottom of the device To protect the device against unauthorized opening screw the enclosed screw into the bottom of the device Pos 37 Neustruktur Online Dokumentation KNX Steuermodule Online Dokumentation Für alle Dokumente Seitenumbruch ...

Page 13: ...05804_15 docx 232536 222222222222233332233 1 7 1 Setting limiting the coverage and the detection range Caution Risk of damaging the device The lens of the device is sensitive and can easily sustain damage Do not press on the lens when setting the device Use the following steps to set the coverage and the detection range Fig 6 Adjusting the lateral detection range 1 Adjust the lateral detection ran...

Page 14: ... S The device is now in test mode for 10 minutes daytime operation switch off delay 2 sec In addition each detection is indicated by the status LED flashing quickly The device then switches back to the basic setting 2 To carry out an additional activation test set the selector switch back to position T or interrupt the operating voltage supply for more than 15 seconds The device is now in test mod...

Page 15: ...otentiometer for brightness value 4 Trim potentiometer for operating mode 5 Screw for dismantling safety 8 2 Operation mode 8 2 1 Test operation for start up Fig 11 Test operation After 10 minutes the device automatically returns to the basic setting GS operating mode Set the desired operating mode GS or ES After activating the mains supply voltage the device remains in test mode for 10 minutes se...

Page 16: ...ns move in the detection area switching signals will be transmitted The brightness limit value can freely selected The switch off delay is fixed to 3 minutes The switch off delay of the receiver e g 6701 must be set to a value 3 minutes In this operating mode only one watchdog can send signals to a specific actuator 8 2 5 Programming Fig 15 Programming Note The individual programming steps are con...

Page 17: ...ly green Fig 18 Set the selector switch on P 3 Set the selector switch of the Busch Watchdog on P the status LED lights up for approx 10 seconds with a slight delay 4 The devices are being programmed to each other 5 After successful programming the LED starts to flash green again If programming is not successful the LED continues to light up reset the selector switch on the Busch Watchdog to P and...

Page 18: ...h Watchdog on P the status LED lights up for approx 10 seconds with a slight delay 4 The link will be deleted 5 After a successful deleting process the LED starts to flash red again If the deleting procedure is not successful the LED continues to light up reset the selector switch on the Busch Watchdog to E again and repeat the procedure 6 Set the operating mode of receiver 6701 on R or S or progr...

Page 19: ...Operating Instructions Busch Wächter Operation Operating Instructions 1473 1 8136 19 Ende der Liste für Textmarke Content ...

Page 20: ...Notice We reserve the right to at all times make technical changes as well as changes to the contents of this document without prior notice The detailed specifications agreed to at the time of ordering apply to all orders ABB accepts no responsibility for possible errors or incompleteness in this document We reserve all rights to this document and the topics and illustrations contained therein The...

Reviews: