background image

ABB industrial drives

Hardware manual 

ACS580MV drives
(200 kW to 6300 kW, 6 kV to 11 kV)

Summary of Contents for ACS580MV

Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...

Page 2: ...Diagram of system 2 2UBB005086 User s manual Start up and maintenance PC tool Drive composer 3AUA0000094606 ACS580MV Preventive Maintenance Schedule 2UBB022658 ACS580MV Synchronized Bypass Unit Hardw...

Page 3: ...o 11 kV 2UBB004520 Rev E EN EFFECTIVE 2019 06 27 2019 ABB Beijing Drive Systems Com pany Ltd All Rights Reserved Electrical installation Table of contents Operation Safety instructions Mechanical inst...

Page 4: ......

Page 5: ...t groups and required qualifications 20 Handling 20 Mechanical installation 20 Electrical installation 20 Operation 20 Maintenance 21 Contents of the manual 21 Relevant chapters of the manual 21 Relat...

Page 6: ...42 Control locations and operating modes 43 Application macros 43 Local operating elements 43 Local control panel 43 Supply OFF ON pushbuttons 44 Alarm and fault indications 45 Emergency off 45 Monit...

Page 7: ...ety 65 Overview of installation work 65 Cable requirements 66 Parallel routing of power cables 66 Terminal sizes for auxiliary and control connections 66 Ground cable and cable shield connections 67 G...

Page 8: ...ally 96 Stopping the drive 97 11 Fault tracing Contents of this chapter 99 Alarm and fault indications 99 Warning and fault messages 100 Diagnosis data and parameter backup 100 12 Maintenance Contents...

Page 9: ...of a power module frame size R7 R9 124 Dismounting 124 Mounting 129 Replacing the power module fuse R7 R9 131 Capacitors 131 Reforming capacitors of the power modules 132 Testing main power supply ci...

Page 10: ...10...

Page 11: ...up guides step by step through the complete commissioning including reporting Equipment Frequency converter and related equipment EMC Electromagnetic compatibility All measures to suppress electromagn...

Page 12: ...istort voltage and current by its electrical systems PE Protective Earth PEBB Power Electronic Building Block semiconductor stack This is another term for power module Power module The power module is...

Page 13: ...be strictly followed Non compliance can jeopardize the safety of personnel the equipment and the environment The safety instructions are derived from the following standards ISO 3864 2 2004 E Graphica...

Page 14: ...lease of the door safety switches is in the locked position Before starting to work on the drive make sure that the main and auxiliary power supply to the drive is switched off locked out and tagged o...

Page 15: ...nal influence on or damage of the equipment Wrong parameter settings Software errors Faulty hardware Hazardous touch voltages can be present on drive system components caused by for example Operation...

Page 16: ...uctions are for all personnel that install the drive and do maintenance work on it If you select an external source for the start command and it is on the drive will start immediately after fault rese...

Page 17: ...ltage from the input busbars Disconnect any external power sources from the control circuits before you do work on the control cables 3 Protect any other energized parts in the work location against c...

Page 18: ...what is on the rating plate The motor cable terminals of the drive are at a dangerous voltage when the input power is on regardless of whether the motor is running or not External wiring can supply da...

Page 19: ...software described in this manual is provided under a license and may be used copied or disclosed only in accordance with the terms of such license Contact information Address ABB Beijing Drive System...

Page 20: ...transportation installation operation and maintenance of the drive The personnel must carry out the below listed tasks in a manner that does not cause physical harm or danger and that ensures the safe...

Page 21: ...ual Related manuals See List of related manuals on the inside of the front cover User s responsibilities It is the responsibility of those in charge of the drive to ensure that each person involved in...

Page 22: ...connection between the product and Customer network or any other network as the case may be Customer shall establish and maintain any appropriate measures such as but not limited to the installation...

Page 23: ...or a wide variety of applications in different industries with a voltage of 6 kV to 11 kV and a power range of 200kW to 6300 kW The drive is characterized by integrated multi winding input transformer...

Page 24: ...e dimensions and weight of the cabinet depend on the drive power Rating plate The rating plate includes an IEC rating appropriate markings a type designation and a serial number which allow identifica...

Page 25: ...1 in figure below An example label is shown below No Description 1 Location of rating plate 2 Type designation see ACS580MV catalog 3 Ratings 4 Compliance information 5 Serial number 5 4 3 2 1 Label w...

Page 26: ...h the optional cabinet heaters an additional AC supply is required Main power supply to input isolation transformer The main power is fed to the drive by the input isolation transformer which adapts t...

Page 27: ...see ACS580MV power supply consumption of the drive in the ACS580MV Engineering Guideline Several auxiliary power supply schemes are available As a standard the customer has to provide the following su...

Page 28: ...ates the two compartments The plate is integrated into the protection loop to prevent access when the drive is energized The compartment provides the terminals for the feeder and motor cables and the...

Page 29: ...transformer is air cooled by means of one or two fan units depending on the drive size Optionally the integrated input transformer is available as a step up or step down version Inverter unit The inve...

Page 30: ...R1 R2 R3 Power module 1 frame sizes R4 R5 R6 Power module 2 frame sizes R7 R8 R9 The power modules are mounted on guide rails and bolted to the frame for easy replacement For information on the dimens...

Page 31: ...r module circuit diagram 1 Input cables 3 phases 2 Power cable terminals 3 Input fuses 4 Fiber optic terminal 5 Output busbar behind cable terminals 2 1 3 4 5 2 5 F1 F2 Input fuses D1 D6 Diode rectifi...

Page 32: ...MCB is closed and the drive is connected to the main power supply Thus excessive inrush currents are prevented The charging sequence is started by pressing the SUPPLY ON pushbutton on the control comp...

Page 33: ...lied grounding hook for details see Shutting down the drive for maintenance Control unit Control compartment with open swing frame 1 Control supply mini circuit breakers 2 MCB control relays 3 Custome...

Page 34: ...description Control compartment with swing frame closed Control compartment with front door closed 1 CVMI2 board 2 Cabinet heater optional 2 1 1 Local control panel and pushbuttons 2 Sealing grommets...

Page 35: ...032 The cabinet s inside panels are not painted because paint tends to reduce the effectiveness of metallic bonding which is important for successful EMC Protection class Standard protection class is...

Page 36: ...1 Door of control compartment lockable 2 Cover plates to TEU with safety contact bolted The main power cannot be switched on when the plate is removed 3 Doors of INU compartment electromechanically lo...

Page 37: ...nit 2 of the integrated transformer belong to group 2 The fan units of a group are always switched on and off together Starting stopping The standard fan unit or fan group 1 is switched on by the cont...

Page 38: ...grated transformer fails the control system of the drive switches on the stand by fan automatically in case of redundant fans The failure of a fan is indicated on the control panel of the drive Temper...

Page 39: ...references to related manuals and documentation Main components The control compartment incorporates the hardware for the control monitoring and protection functions of the drive and the communicatio...

Page 40: ...ed data transfer via the control hub to the PEBB control boards inside the power modules Internal and external analog and binary I O signals are connected to the BCU via an AC500 I O controller The I...

Page 41: ...sions encoders and fieldbus adapters Two are available for customer use allowing the use of following fieldbus protocols Profibus Modbus RTU Modbus TCP EtherNet IP Profinet and or analog and digital I...

Page 42: ...stomized and tuned with a set of application parameters The application parameters are organized in functional groups and have factory set default values application macros The following application m...

Page 43: ...as been selected The control panel can be attached to or detached from the drive without having to switch off the auxiliary power supply first Using the control panel it is possible to enter start up...

Page 44: ...t is illuminated when the MCB is open and the drive is discharged The SUPPLY ON pushbutton is used to connect the drive to the main power supply It is illuminated when the MCB is closed 1 Control pane...

Page 45: ...uxiliary circuits remain live Monitoring Basic system monitoring is done with the local control panel For more detailed diagnosis and signal monitoring the Drive Composer PC tool is available I O inte...

Page 46: ...used XDI 1 DI1 Stop 0 Start 1 2 DI2 Forward 0 Reverse 1 3 DI3 Reset 4 DI4 Acc Dec timeset 1 0 set 2 1 5 DI5 Constant speed1 1 On 6 DI6 Bydefault not inuse X13 X205 XETH 24VDC 2A internallyused Speedre...

Page 47: ...Emergencyoff 1 Emergencyoff 2 RemoteMCB closecmd RemoteMCB open cmd Alarm floatingcontacts tocustomer makingcapability 40A thermal current Ith 6A 40 C breakingcapability AC 1550Hz Ie 240 V 4A Ie 500 V...

Page 48: ...ence Hand 0 2 10V Rin 200kohm Speedreference AuTO 0 4 20mA RL 100ohm XAI Referencevoltageandanaloginputs 4 AI1 5 AI1 6 AI2 7 AI2 XDI Digital inputs 1 DI1 Stop 0 Start 1 Speedcontrol 2 DI2 Bydefault no...

Page 49: ...Control system and interfaces 49 I O signal requirements See the Technical data Communication interfaces See the ACS580MV primary control program firmware manual and the Technical data...

Page 50: ...50 Control system and interfaces...

Page 51: ...CS580MV Engineering Guideline For selecting a specific drive type and options refer to ACS580MV Engineering Guideline Limitation of liability The installation must always be designed and made accordin...

Page 52: ...52 Guidelines for planning the electrical installation...

Page 53: ...be carried out by qualified personnel according to the site and equipment requirements and in compliance with the local regulations Transport conditions The transport conditions for the drive are bas...

Page 54: ...erefore transport the cabinet in an upright position Transport separated units only Keep the doors closed to prevent dirt from entering Metallic dust in particular can cause damage and failure when th...

Page 55: ...15 2100 10R2 2571 1176 1815 1250 2571 1176 2215 2450 10R3 A B C 2571 1176 1815 1300 2571 1176 2215 2800 10R3D 2571 1176 1815 1350 2571 1176 2215 3050 10R4 2571 1176 2215 1550 2571 1176 2215 3550 10R5...

Page 56: ...adily to the required clearance height maintaining the cabinet in upright position Check the horizontal position of the cabinet Reposition the slings if necessary Using a forklift Only transport the c...

Page 57: ...te quality 1 unit desiccant 30 g absorbs 6 g water vapor The following quantity is needed when using a polyethylene foil 10 units m2 foil 3 Close and lock the doors of the cabinet 4 Use polyethylene o...

Page 58: ...hat are used as spare parts must be installed and operated in a drive every 2 years in order to reform the capacitors and thus reduce the risk of a potential hazard For detailed information go to ACS5...

Page 59: ...1 The ambient conditions of the drive meet the specifications 1 The wall behind the unit is of non flammable material There is enough free space above the drive to enable cooling air flow service and...

Page 60: ...gized Ensure that foreign matter cannot enter the cabinet Close the doors and cover openings completely when work is discontinued Retrieve any foreign matter which accidentally dropped into the cabine...

Page 61: ...information on the number of fan units to be installed see ACS580MV Base frame TEU layout design Installation 1 Lift the fan unit onto the cabinet roof by means of a forklift or a crane if using a cra...

Page 62: ...the transformer unit Align the units Then bolt the units together using the 12 hexagonal bolts with 5N M see figure below Fixing units to the floor Floor fixings are not supplied 16 anchor bolts as il...

Page 63: ...s Screws for combining converter and transformer are fixed on the door of control unit 3 Tool Kit You can find the tool kit by open the door of control unit It is on the bottom of the cabinet Open the...

Page 64: ...by authorized person actions without authorization are dangerous 4 Absorbing material in cabinet Desiccant Place Desiccant in the cabinet one bag for per door position them on the bottom plate unifor...

Page 65: ...rial communication cables Power supply and signal cables for fans in transformer unit WARNING Hazardous voltage Improper work could lead to life threatening injury or death The electrical installation...

Page 66: ...les laid in parallel is limited by the number of entry holes of the entry plate For information on the supply voltages see Rating label of the drive Terminal sizes for auxiliary and control connection...

Page 67: ...ring Diagram Grounding of the drive system Grounding of the drive system must be in line with the ACS580MV Engineering Guideline Auxiliary power supply interface Terminal Wire cross section mm2 Solid...

Page 68: ...ounding drive system and integrated transformer 1 2 3 4 5 6 7 8 4 4 5 1 Input transformer TRU 2 Drive 3 Motor 4 Earth electrode 5 Ground cable 6 Cable screen 7 Cable shield 8 Equipotential bonding con...

Page 69: ...nd TRU or Auxiliary supply from internal main transformer option Heating cable option The cables are identified by their specific number and are labeled with the designation of the terminal where they...

Page 70: ...side wall The PE busbar is connected with INU and TRU PE busbars through the side wall PE busbar connection NOTICE The required tightening torque for the internal transformer terminal connections is 1...

Page 71: ...or a combination of the following cable entries Metal plate hole cable entry for power cables ground cables Cable entry with EMC plates EMC cushions and sealing grommets for auxiliary and control cabl...

Page 72: ...or cable entry with EMC plate bottom mounted The EMC cushions 1 in figure below are mounted on the underside of the EMC plate when entering cables from top They are mounted on top of the EMC plate whe...

Page 73: ...device identification Preparing the cable entry and the cables Determining the cable length 1 Determine the required length of a cable between the point of entry and the connection point inside the ca...

Page 74: ...th 2 Entry plate 3 Conductor screen extension to be connected to PE ground busbar 4 Heat shrinkable termination 5 Sealing compound 1 Outer cable sheath 2 Entry plate 3 Conductor screen extension to be...

Page 75: ...al compartment High voltages can cause flashover between the electric potential of different conductors and the electric potential of a conductor and earth Therefore a minimum clearance of 59 5 mm mus...

Page 76: ...76 Electrical installation Terminal compartment with cover plate removed view from front 3 1 4 2 5 1 Voltage dividers 2 Motor side terminals 3 Input terminals 4 Cable entry plate bottom plate...

Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...

Page 78: ...missioning personnel has given permission to connect them Connections Connect the cables to their corresponding busbars Feeder cables to busbars U1 V1 W1 Motor cables to busbars U2 V2 W2 Screen ends o...

Page 79: ...nuts are used lubricate the thread and head contact surface of the bolt using recommended pasts e g Molykote D paste Note If a coated nut e g with bonded molybdenum disulfide MoS2 coating is used the...

Page 80: ...able entry and the cables Determining the cable length 1 Determine the required length of a cable between the point of entry and the connection point inside the cabinet 2 Cut the cable to the required...

Page 81: ...essary remove the entry plate and pull the cables through the entry holes 4 Loosen the screws of the EMC cushion brackets and push the cushions apart arrow 5 Remove the cable insulation at the point o...

Page 82: ...cting the cables Connect the cables for digital and analog input and output signals to the corresponding terminals modules If a twisted pair cable is used leave the unshielded cable ends twisted until...

Page 83: ...ector 2 Connect each cable to the appropriate connector Sealing holes in entry plates Seal the gap between cable and entry plate with the supplied two component sealant For mixing and applying the sea...

Page 84: ...84 Electrical installation Final checks Check that the entry plates are properly fastened and cable entries are correctly sealed...

Page 85: ...k on the drive make sure that the main and auxiliary power supply to the drive is switched off locked out and tagged out that the drive is dead that safety ground connections are in place that persona...

Page 86: ...e appropriate temperature and humidity 2 The wall behind the unit is of non flammable material Please take the photo and send back 3 There is enough free space above the drive to enable cooling air fl...

Page 87: ...instructions in this manual Chapter Electrical installation 5 Cable entry made according to the instructions in this manual Chapter Electrical installation 6 All control cable screens and conductors...

Page 88: ...nual and technical specification is available 9 Withstand voltage test of the MCB have been done according to Manufacture s specifications The official test report must be available 1 Motor installed...

Page 89: ...missioning engineer of the drive an additional day per drive motor combination needs to be reserved After the test the feeder cables can be connected except at the drive end The test must comply with...

Page 90: ...90 Installation checklist...

Page 91: ...e operated by qualified and authorized personnel i e personnel who are familiar with the operation of the drive and the hazards involved Overview The chapter outlines the local operation of the drive...

Page 92: ...ition has occurred For information on other status messages such as fault status messages in particular see the ACS580MV primary control program firmware manual Status indications The drive status is...

Page 93: ...ON command DC link charges MCB closes INU starts modulation Enter setpoint Operation Conditions for start Auxiliary supply on TRU INU door closed and locked TEU protective plate mounted Drive not grou...

Page 94: ...Drive stopped Drive OFF Drive running SUPPLY OFF command MCB opens Operation Stop command Actions Switch off auxiliary supply TRU INU door released for opening Fan switches off after a delay Speed ra...

Page 95: ...panels user s manual Checks before starting the drive DANGER Hazardous voltages All covers must be screwed in place to prevent unintentional contact with energized components The manual release of the...

Page 96: ...k that all covers are mounted and the doors are closed locked and or bolted Check that the MCB is in operating position Check that there is no run interlock active Starting the drive from remote When...

Page 97: ...he motor speed ramps up to the setpoint While the motor is accelerating the run status indication on the display blinks When the motor speed has reached the setpoint the run status indication lights u...

Page 98: ...n and the drive stops modulating When the motor has reached zero speed the drive is in state Stopped and the display shows DANGER Hazardous voltages The ACS580MV is not de energized in the state Stopp...

Page 99: ...lities of the drive Alarm and fault indications When a failure occurs in the drive or in the equipment monitored by the drive the control panel displays a corresponding alarm or fault message and the...

Page 100: ...re manual for the descriptions causes and remedies of the drive control program warning and fault messages Diagnosis data and parameter backup See User s manual Start up and maintenance PC tool Drive...

Page 101: ...starting to work on the drive make sure that the main and auxiliary power supply to the drive is switched off locked out and tagged out that the drive is dead that safety ground connections are in pla...

Page 102: ...nly spare parts recommended and approved by ABB For information on types and identification codes see the spare part kits or contact ABB service organization Shutting down the drive for maintenance Se...

Page 103: ...he main power supply The following takes place The MCB opens The DC link discharges While the DC link discharges the SUPPLY OFF pushbutton flashes Wait 15 minutes until the DC link capacitors have dis...

Page 104: ...ed by touching them with the grounding stick See Grounding power module with grounding hook on page 107 Unlocking and locking the doors The door is secured by a safety switch and the control compartme...

Page 105: ...e for the 3 phase power input Notice To adapt grounding harness ordered from ABB ball type grounding studs are provided as option Example for grounding harness 1 Open the COU door 2 Connect the enclos...

Page 106: ...4 Use the telescopic insulating pole to connect the busbar grounding clamps to the busbars in the Terminal Unit and to tighten each connection 3 1 4 2 5 1 Voltage dividers 2 Motor side terminals 3 In...

Page 107: ...meter with impedance of 10 Mohm not part of supply Voltage divider probe not part of supply Grounding hook part of supply The grounding hook is attached to the left side wall inside the COU cabinet Th...

Page 108: ...ced and leave it there until work on the module is finished 7 Make sure again that all power module terminal voltages are below 50 V Use a multimeter and measure the voltage between the grounded power...

Page 109: ...k is discharged Also the door of the INU compartment can not be opened if the drive is disconnected from the auxiliary power if the safety switch of the door is in the locked position If the auxiliary...

Page 110: ...l can be turned 3 2 1 1 Release dial 2 Unlocked position The unlocked position enables opening the door of a medium voltage unit whether the auxiliary voltage is switched on or off 3 Locked position L...

Page 111: ...own the drive for maintenance on page 102 before you start the work 2 When necessary clean the interior of the cabinet with a soft brush and a vacuum cleaner 3 Check the air inlet filters of the cabin...

Page 112: ...cleaner creates static discharges which can damage circuit boards 1 Stop de energize and ground the drive following the steps in section Shutting down the drive for maintenance before you start the wo...

Page 113: ...fan box Lift the top cover and pull it away from the fan box 4 Disconnect the connector and make sure that the supply connector is detached from the support beam 5 Remove the four hex head combinatio...

Page 114: ...e 13 When the work is completed the drive can be started up again See Chapter Operation Energizing and starting the drive 14 Check visually the direction of fan rotation when starting the drive The co...

Page 115: ...Maintenance 115 Required tools and equipment Screwdriver for M6 and M10 screw Lifting eye M8 2 pieces The fans can be lifted by crane or by hand 2 x...

Page 116: ...he motor starter see the ACS580MV Wiring Diagram 3 Remove the hex head combination screws that attach the top cover to the fan box Lift the top cover and pull it away from the fan box 4 Disconnect the...

Page 117: ...fan box can be mounted backward the screw positions are compatible between fan box and cabinet top plate The procedure can refer to instruction above For details of the EC fan box outline see ACS580MV...

Page 118: ...er and tools Two persons are required for replacing a power module The following tools are needed Screwdrivers M6 M8 M10 M12 Torque wrench with extension bar Replacement of a power module frame size R...

Page 119: ...ompartment 3 Ground the power modules according to Grounding power module with grounding hook on page 107 4 Disconnect the fiber optic links from the power module 5 Loosen and detach the three power c...

Page 120: ...g the steps in section Shutting down the drive for maintenance before you start the work 2 Switch off all miniature circuit breakers in the control compartment 3 Ground the power modules according to...

Page 121: ...s must always be of the same type Dismounting 1 Stop de energize and ground the drive following the steps in section Shutting down the drive for maintenance before you start the work 2 Switch off all...

Page 122: ...n the front of power module 7 Slide out the power module by hand 1 Busbar connections 2 Power cable terminals 3 Fixation screws 4 Terminals for fiber optic cables 1 2 3 3 4 1 Weight of power module ma...

Page 123: ...steps in section Shutting down the drive for maintenance before you start the work 2 Switch off all miniature circuit breakers in the control compartment 3 Ground the power modules according to Groun...

Page 124: ...me type Tools and accessories Dismounting 1 Stop de energize and ground the drive following the steps in section Shutting down the drive for maintenance before you start the work 2 Switch off all mini...

Page 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...

Page 126: ...fixation screws M6X16 that attach the power module to the front lock 8 Slide out the power module by hand until stopped by the front lock 9 Lift the blocking bar of the front lock and pull out the po...

Page 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...

Page 128: ...128 Maintenance 11 Lift again the blocking bar of the front lock pull the power module completely out of the support module beam and lower it...

Page 129: ...G Weight of power module max 65 kg Obey local regulations when lifting the power modules Mounting 1 Loosen and detach the two combination screws M6X16 from the front lifting bar that attach the power...

Page 130: ...h two combination screws M6X16 but don t fix tightly 3 Install the new module in reverse order of removal 4 Adjust the metal plate to alien the middle three holes with lock holes fix the connection wi...

Page 131: ...with grounding hook on page 107 4 Loosen the 2 mounting screws of the fuse to be replaced 5 Pull out the fuse 6 Install the replacement fuse in reverse order of removal 7 Reinstall the power module in...

Page 132: ...he control panel Replace with a new battery Dispose the old battery according to local disposal rules or applicable laws For details refer to the ACS AP X assistant control panels user s manual Circui...

Page 133: ...nectors on the BCU 4 Loosen the end brackets of BCU 5 Keep the top of the BCU looking to the back in cabinet in place and twist the bottom looking towards you to pull it out of the mounting rail When...

Page 134: ...pull out the memory unit Replacement of BCU components NOTICE In case of a defective ZMU the drive needs to be re parametrized Please contact ABB service 1 3 4 2 1 1 Real time clock battery 2 Fastenin...

Page 135: ...card while the yellow LED is lit which indicates that writing to the SD card is in progress 2 Undo the fastening screw of the clip covering the memory card and press the card to remove it For the car...

Page 136: ...rtment 3 Loosen the cable connection at the board to be removed 4 Hold the divider board and remove the two fixation screws 5 Install the replacement divider board in reverse order of removal 6 When t...

Page 137: ...ews on the mounting plate and remove the module 5 Install the new control hub in reverse order 6 When the work is completed the drive can be started up again See Chapter Operation Energizing and start...

Page 138: ...ick the daughter board to be replaced and withdraw 6 Install the new daughter board in reverse order 7 When the work is completed the drive can be started up again See Chapter Operation Energizing and...

Page 139: ...the drive The drive should be checked at least every two years by qualified personnel whose recommendations should be followed Depending on the actual condition of the drive the maintenance work can...

Page 140: ...possble That will provide protection against dust salty air or pest during storage ABB offered desiccant is 3ABD00005991 500g bag Refer to the minimum desiccan quantity based on door width Alternativ...

Page 141: ...rvice package 400 810 8885 2 All power cables to drive and from drive to motor are meggered and measured values are within the required limits Spare parts 1 Sufficient number and correct type of spare...

Page 142: ...142 Maintenance...

Page 143: ...ACS580MV Catalog For mechanical layout dimensions and required free space see ACS580MV Base frame TEU layout design For motor and cable selection and for the technical requirements for the protection...

Page 144: ......

Page 145: ...ts can be found by navigating to www abb com searchchannels Product training For information on ABB product training navigate to www abb com drives and select Training courses Document library on the...

Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...

Reviews: