background image

106 Industrial Installation Manual  Rev. A-1 

 

 

 

Industrial Enclosures: 

 

For Model 106 Ozone Monitors 

 

2

B

 

Technologies

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DRAWINGS AND  

INSTALLATION MANUAL 

 

 

© Copyright 2020, 2B Technologies 

All rights reserved. 

 

Technical Support:  

www.twobtech.com/techsupport 

 [email protected] 

+1(303)273-0559 

 

Summary of Contents for 106

Page 1: ... 1 i Industrial Enclosures For Model 106 Ozone Monitors 2B Technologies DRAWINGS AND INSTALLATION MANUAL Copyright 2020 2B Technologies All rights reserved Technical Support www twobtech com techsupport techsupport twobtech com 1 303 273 0559 ...

Page 2: ...nts IDENTIFICATION RECORDS iii PRINTING HISTORY iv WARRANTY STATEMENT v WARNINGS vi 1 INTRODUCTION 1 2 INSTALLATION 1 2 1 Mounting 1 2 2 Power 1 2 3 Inlet Manifold 2 2 4 Analog Output Serial Communication and Relays 5 3 GAS CONNECTIONS 8 4 MAINTENANCE 8 ...

Page 3: ...Manual Rev A 1 iii IDENTIFICATION RECORDS Record the following information for future reference Unit serial number ______________________________________ Warranty start date _______________________________________ date of receipt ...

Page 4: ...ust 2020 TRADEMARKS PATENTS 2B Technologies 2B Tech and 2B are trademarks of 2B Technologies CONFIDENTIALITY The information contained in this manual may be confidential and proprietary and is the property of 2B Technologies Information disclosed herein shall not be used to manufacture construct or otherwise reproduce the goods disclosed herein The information disclosed herein shall not be disclos...

Page 5: ... Prior to returning the product a Repair Authorization Number RA must be obtained from the 2B Technologies Service Department Shipping 2B Technologies will pay freight charges for replacement or repaired products shipped to the customer site Customers shall pay freight charges for all products returning to 2B Technologies Conditions The foregoing warranty shall not apply to defects resulting from ...

Page 6: ...WEIS Vor dem Öffnen des Gerätes Netzstecker ziehen WARNHINWEIS Dieses auf dem Gerät weist darauf hin dab der Anwender zuerst das entsprechende Kapitel in der Bedienungsanleitung lesen sollte WARNHINWEIS Wenn das Gerät nicht wie durch die Firma 2B Technologies USA vorgeschrieben und im Handbuch beschrieben betrieben wird können die im Gerät eingebauten Schutzvorrichtungen beeinträchtigt werden ITAL...

Page 7: ...Industrial Enclosure be mounted on a wall or specially built stand The enclosure weighs over 14 pounds with the ozone monitor installed and requires a substantial mounting structure The floor of the box should be level when the box is mounted The figures in this manual provide mechanical dimensions for the Industrial Enclosure 2 1 Mounting The back of the enclosure has three holes at the top and t...

Page 8: ...Multichannel 3 port Three gas inlets option available when ordering Multichannel 6 port Six gas inlets option available when ordering The size of the Industrial Enclosure is the same for all three configurations Figure 2a in this manual shows each configuration Figure 1 Industrial Enclosure Dimensions Front View of standard single port configuration ...

Page 9: ...l Rev A 1 3 Figure 2a Industrial Enclosure Bottom View of standard single 3 and 6 port configurations Figure 2b Industrial Enclosure Dimensions Bottom View of standard single port configuration Inlets Inlet Outlet Outlet Outlet Inlets ...

Page 10: ...106 Industrial Installation Manual Rev A 1 4 Figure 3 Industrial Enclosure Dimensions Bottom View with Door Clearance ...

Page 11: ...e analog output serial communication and relays is on the inside of the enclosure Figure 4 The connections are made to the 8 position and 12 position terminal blocks according to Figure 4 and Tables 1 and 2 below Photos of the connections are shown in Figure 5 Figure 4 Connections to the Industrial Enclosure ...

Page 12: ...DC White 7 open 8 open Table 2 12 Position Terminal Block Connections Relays Pin Description Wire Color 1 Relay 1 open on alarm condition Red 2 Relay 1 ground Black 3 Relay 1 closed on alarm condition Green 4 Relay 2 open on alarm condition Red 5 Relay 2 ground Black 6 Relay 2 closed on alarm condition Blue 7 Relay 3 open on alarm condition Red 8 Relay 3 ground Black 9 Relay 3 closed on alarm cond...

Page 13: ...106 Industrial Installation Manual Rev A 1 7 Figure 5 Photos of Terminal Connections ...

Page 14: ...SERVICE CONSULT WITH 2B TECHNOLOGIES FOR ADVICE ON MATERIALS CAUTION EXPOSURE TO OZONE IS HAZARDOUS ENSURE THAT ALL GAS CONNECTIONS ARE TIGHT AND THAT NO LEAKS EXIST 4 MAINTENANCE The Industrial enclosure requires minimum maintenance Inspect the enclosure for signs of leaks or damage Clean the polyester surface with an appropriate cleaner CAUTION Do not use abrasive cleaners on the window For the ...

Reviews: