![Zuwa Solarcheck Mobilcenter UNISTAR 2000-A Operating Instructions Manual Download Page 6](http://html1.mh-extra.com/html/zuwa/solarcheck-mobilcenter-unistar-2000-a/solarcheck-mobilcenter-unistar-2000-a_operating-instructions-manual_942776006.webp)
ZUWA SOLARCHECK MOBILCENTER
6
4. Mounting and commissioning
1. Connect filling hose to pump outlet.
2. Connect return hose to tank.
3. Connect filling hose (1) and return
hose (2) to the fill/vent valves and
open valves. Close stop valve (3).
4. Fi
.
ll tank and open ball valve
5. Insert cable of pump motor into
socket.
6. Switch on pump.
2
1
3
Summary of Contents for Solarcheck Mobilcenter UNISTAR 2000-A
Page 17: ...ZUWA SOLARCHECK MOBILCENTER 17...
Page 18: ...ZUWA SOLARCHECK MOBILCENTER 18...
Page 19: ...ZUWA SOLARCHECK MOBILCENTER 19...