Form the base. Please connect the
Horizontal Foot Pipe (#B) with the Vertical Foot Pipe (#A) in the way shown below. In this step,
you need: 2 x
Big Open Spanner (#J), 8 x M12 X 80 Screws (#G).
9
STEP 1
Tools: 2 x part #J
Parts: 2 x part #A; 2 x part #B; 8 x part #G
STEP 2
Connect the TWO of the
Vertical Pipe (#C) to the base with the following accessories: 4 x M12 X 20 Screw (#H).
Tools: 2 x part #J
Parts: 2 x part #C; 4 x part #H
B
A
C
C
Summary of Contents for PRO Gymnastics Bar
Page 18: ...PLAY ENJOY BOND ...