Issue date
:
2020/3/16
-
8
-
3.1 Assembly of base
(1) Please take out the base support from the package, lay it on the ground.
(2) Take out the pole, turn out the inner hexagonal screw and gasket. Insert the pole
into the hole of the floor stand, make sure that the pin of the floor stand installed in
the hole of the pole. Assemble everything in the following order: gasket, spring gasket,
socket screw. Finally fasten the socket screw firmly with an 8mm allen key.
Fig 7. Assembly of base
3.2 Assembly of the first arm
Take out the first arm
,
please pay attention, the star handler fixation screw [3] must be
tightened in advance, insert the hole to the axis, then use jump ring pliers to fix the
two axis with jump ring in the circle groove, put on the cover.
Caution
:
The Second Arm use a spring to keep the balance. The
star handler fixation screw [3] can only to tighten the
arm, the arm can not be locked by this screw. The
second Arm must be held before loosening the star
handler fixation screw [3].