![Zuiver Marble King Manual Download Page 5](http://html1.mh-extra.com/html/zuiver/marble-king/marble-king_manual_942267005.webp)
09/16
5
Step Three
1. With 2 people carefully lower the marble top (A) onto the base ensuring all holes are aligned.
2. With 1 person supporting the top, secure the top to the base with the bolts (E) spring washers
(F) and metal washers (G) using the allen key (I).
3. Ensure all bolts are fully tightened before use and check periodically.
A
B
I
E
F
G