background image

Installation and Care Instructions

IMPORTANT INFORMATION

• Hot and cold water inlet pressures should be equal.

•  Operating static pressure is 150—500kpa. If pressure exceeds this, then an approved 

pressure limiting valve must be fixed.

•  Pipework must be flushed out prior to installation of the mixer. Damage caused to the 

mixer by debris coming through the pipework is not covered under warranty.

• Installation should comply to AS/NZS3500 or the relevant local requirements.

• Maximum hot water temperature is 75°.

• Not suitable for gravity feed applications. 

MAINTENANCE AND CARE

• Using a soft cloth with a mild detergent or soap is all that is required to clean surfaces.

•  Do not use abrasive cream cleaners or citrus based cleaning products. These will 

damage the surface.

• Aerator may be removed and cleaned should it become blocked.

WM-004006 

AS/NZS 3718-2005

Zucchetti Rubinetteria S.p.A

Summary of Contents for Z92221

Page 1: ...N DER ARMATUREN D INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA E ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ RU INSTRUKCJE INSTALACJI ARMATURY PL Zucchetti Rubinetteria S p A Via Molini di Resiga 29 28024 Gozzano No Italy Tel 39 0322 954700 Fax 39 0322 954823 zucchettidesign it A30681_R00 ZBR675 ZBR103 Z92222 Z92221 ZBR106 ZBR308 ZBR381 ZBR380 ZBR383 ZBR309 ZBR382 ZBR384 ZBR674 ZBR122 ZBR127 ...

Page 2: ...INSTALLAZIONE INSTALLATION ZBR308 ZBR381 ZBR380 ZBR383 ZBR384 1 4 5 2 3 X1 X1 ...

Page 3: ...INSTALLAZIONE INSTALLATION ZBR309 ZBR382 1 2 3 X1 ...

Page 4: ...INSTALLAZIONE INSTALLATION ZBR309 ZBR382 5 6 7 8 X1 ...

Page 5: ...INSTALLAZIONE INSTALLATION ZBR674 ZBR675 Z92222 Z92221 1 Min 40 Max 70 2 3 MAX X X 4 5 6 ...

Page 6: ...INSTALLAZIONE INSTALLATION ZBR674 ZBR675 Z92222 Z92221 7 8 9 10 11 12 ...

Page 7: ...INSTALLAZIONE INSTALLATION ZBR674 ZBR675 Z92222 Z92221 13 14 15 16 ...

Page 8: ...INSTALLAZIONE INSTALLATION ZBR103 ZBR106 150 mm 1 2 3 4 5 6 ...

Page 9: ...INSTALLAZIONE INSTALLATION ZBR103 ZBR106 7 8 9 10 ...

Page 10: ...INSTALLAZIONE INSTALLATION ZBR122 ZBR127 1 2 3 4 ...

Page 11: ... Z9126P Should the water pressure be higher than 5 bar a pressure reducer should be fitted upstream of the supply pipes Excessively high pressure values can cause acoustic vibrations and whis tling in the taps and irregular und uneven temperature regulation CLEANING To clean all our taps in the chromed gold plated or varnished versions or those with special finishes we strongly advice against the ...

Page 12: ...ng through the pipework is not covered under warranty Installation should comply to AS NZS3500 or the relevant local requirements Maximum hot water temperature is 75 Not suitable for gravity feed applications MAINTENANCE AND CARE Using a soft cloth with a mild detergent or soap is all that is required to clean surfaces Do not use abrasive cream cleaners or citrus based cleaning products These will...

Reviews: