background image

ZT2545 

INSTALLAZIONE / INSTALLATION 

ZT2545 - ZT2645 - ZT2750 - ZT2751 

Summary of Contents for R97900

Page 1: ...BINETTERIE F MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN D INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA E ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ RU INSTRUKCJE INSTALACJI ARMATURY PL Zucchetti Rubinetteria S p A Via Molini di Resiga 29 28024 Gozzano No Italy Tel 39 0322 954700 Fax 39 0322 954823 zucchettidesign it A30547 07 13 R00 ZT2545 ZT2645 ZT2750 ZT2751 R97900 ...

Page 2: ... 2 3 16 Max 80mm 3 1 16 COLLEGARE AL RUB D ARRESTO CONNECTING WITH STOP VALVE TAPPARE SE NON UTILIZZATO PLUG IF NOT USED INSTALLAZIONE INSTALLATION ZT2545 ZT2645 ZT2750 ZT2751 40 mm 1 9 16 58 mm 2 3 1 6 110 mm 4 5 16 70 mm 2 11 16 ...

Page 3: ...INSTALLAZIONE INSTALLATION ZT2545 ZT2645 ZT2750 ZT2751 ...

Page 4: ... ZT2545 INSTALLAZIONE INSTALLATION ZT2545 ZT2645 ZT2750 ZT2751 ...

Page 5: ...eassemble the thermostatic handle SERVICE INSTRUCTIONS The thermostatic mixer is set at the factory at the temperature of 38 C 100 F If the temperature of the mixed water should not result at 38 C 100 F proceed as follows By keeping the temperature handle upward take off the cap and the fixing screw of the thermostatic han dle then the handle itself Remove the white stop sleeve Turn the thermostat...

Page 6: ... Z9126P Should the water pressure be higher than 5 bar a pressure reducer should be fitted upstream of the supply pipes Excessively high pressure values can cause acoustic vibrations and whis tling in the taps and irregular und uneven temperature regulation CLEANING To clean all our taps in the chromed gold plated or varnished versions or those with special finishes we strongly advice against the ...

Reviews: