Installation and Care Instructions
IMPORTANT INFORMATION
• Hot and cold water inlet pressures should be equal.
• Operating static pressure is 150—500kpa. If pressure exceeds this, then an approved
pressure limiting valve must be fixed.
• Pipework must be flushed out prior to installation of the mixer. Damage caused to the
mixer by debris coming through the pipework is not covered under warranty.
• Installation should comply to AS/NZS3500 or the relevant local requirements.
• Maximum hot water temperature is 75°.
• Not suitable for gravity feed applications.
MAINTENANCE AND CARE
• Using a soft cloth with a mild detergent or soap is all that is required to clean surfaces.
• Do not use abrasive cream cleaners or citrus based cleaning products. These will
damage the surface.
• Aerator may be removed and cleaned should it become blocked.
WM-004006
AS/NZS 3718-2005
Zucchetti Rubinetteria S.p.A
Summary of Contents for NIKKO Z92225
Page 2: ...INSTALLAZIONE INSTALLATION ZKK697 ZKK699 ZKK698 ZKK700 ZKK320 1 X1 2 3 4 5 6 X1...
Page 3: ...INSTALLAZIONE INSTALLATION ZKK697 ZKK699 ZKK698 ZKK700 ZKK320 ZKK701 ZKK702 11 7 8 9 10...
Page 4: ...INSTALLAZIONE INSTALLATION ZKK672 ZKK673 Z92225 Z92226 1 MAX X X 4 5 6 2 3 Min 40 Max 70...
Page 5: ...INSTALLAZIONE INSTALLATION ZKK672 ZKK673 Z92225 Z92226 7 8 9 10 11 12...
Page 6: ...INSTALLAZIONE INSTALLATION ZKK672 ZKK673 Z92225 Z92226 13 14 15 16...
Page 7: ...INSTALLAZIONE INSTALLATION ZKK106 ZKK108 150 mm 1 2 3 4 5 6...
Page 8: ...INSTALLAZIONE INSTALLATION ZKK106 ZKK108 7 8 9 10...
Page 9: ...INSTALLAZIONE INSTALLATION ZKK122 ZKK127 1 2 3 4...