Chapter 3

Installing a Cable

A CAT5e UTP cable is used as the Ethernet cable. For the cable overview, see

Figure 3-1

.

Figure 3-1 CAT5e Ethernet Cable

Prerequisite

The Ethernet cable is as long as needed.

Caution!

l

Do not use STP Ethernet cables.

l

The maximum length of an Ethernet cable from the ZXSDR R8119 to the Pbridge

should be less than 100 m.

Steps

1.

Connect one end of the Ethernet cable to the

ETH

interface of the ZXSDR R8119, see

Figure 3-2

.

3-1

SJ-20150805085318-002|2016-08-18 (R1.3)

ZTE Proprietary and Confidential

Summary of Contents for ZXSDR R8119

Page 1: ...Remote Radio Unit Hardware Installation Version V2 0 ZTE CORPORATION No 55 Hi tech Road South ShenZhen P R China Postcode 518057 Tel 86 755 26771900 Fax 86 755 26770801 URL http support zte com cn E mail 800 zte com cn ...

Page 2: ...TION or its licensors may have current or pending intellectual property rights or applications covering the subject matter of this document Except as expressly provided in any written license between ZTE CORPORATION and its licensee the user of this document shall not acquire any license to the subject matter herein ZTE CORPORATION reserves the right to upgrade or make technical change to this pro...

Page 3: ...Installing the Device on a Pole 2 1 2 2 Installing the Device on a Concrete Wall 2 4 2 3 Installing the Device on a Concrete Ceiling 2 8 2 4 Installing a Removable Ceiling 2 11 Chapter 3 Installing a Cable 3 1 Figures I Tables III Glossary V I SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 4: ...This page intentionally left blank II SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 5: ...s the interfaces involved in installation Chapter 2 Installing the ZXSDR R8119 Describes how to install the ZXSDR R8119 Chapter 3 Installing a Cable Describes how to install cables Conventions This manual uses the following conventions Caution indicates a potentially hazardous situation Failure to comply can result in moderate injury equipment damage or interruption of minor services Note provides...

Page 6: ...This page intentionally left blank II SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 7: ...terface Descriptions No External Interfaces Description 1 U shape grooves Mounts the ZXSDR R8119 to installation components 2 ETH interface RJ45 network interface supports the PoE function used for the ZXSDR R8119 to connect to the ETH interface of the Pbridge a remote convergence unit through an Ethernet cable 3 ANT interface Interface complete with external antenna connection 1 1 SJ 201508050853...

Page 8: ...ZXSDR R8119 Hardware Installation This page intentionally left blank 1 2 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 9: ...against a ceiling 2 4 Installing a Removable Ceiling Caution The device does not need to be grounded Table of Contents Installing the Device on a Pole 2 1 Installing the Device on a Concrete Wall 2 4 Installing the Device on a Concrete Ceiling 2 8 Installing a Removable Ceiling 2 11 2 1 Installing the Device on a Pole This procedure describes how to install the ZXSDR R8119 against a vertical pole ...

Page 10: ...iew Pole holder 2 Vertical pole fixture 1 M5 25 countersunk screw 2 Wing nut and washer 2 Slide proof rubber mat 2 Steps 1 Wrap the slide proof rubber mat around the pole see Figure 2 1 2 2 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 11: ... shaped bracket with two countersunk head screws M5 25 and two wing nuts and washers see Figure 2 2 Figure 2 2 Securing the Two Point Mounting Plate to the L shaped Bracket 3 Install the L shaped bracket and the Pole holder on the pole and tighten the screws see Figure 2 3 2 3 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 12: ...the two point hanging board and push the ZXSDR R8119 to the end to fix it on the two point hanging plate see Figure 2 4 Figure 2 4 Mounting the ZXSDR R8119 End of Steps 2 2 Installing the Device on a Concrete Wall This procedure describes how to install the ZXSDR R8119 against a wall 2 4 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 13: ...aped bracket 1 Wing nut and washer 2 M5 25 countersunk screw 2 ST4 2 32 countersunk self tapping screws 3 φ6 30 Expansion pipe 3 Steps 1 Secure the two point mounting plate to the horizontal mounting bracket with two countersunk head screws M5 25 and two wing nuts and washers see Figure 2 5 2 5 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 14: ... holes based on the hole positions of the L shaped bracket and drill four holes at the marks with an electric drill The holes must be at least 55 mm deep see Figure 2 6 Figure 2 6 Drilling Holes 3 Hammer the expansion tubes into the holes with a rubber hammer see Figure 2 7 2 6 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 15: ...ping screws ST4 2 32 see Figure 2 8 Figure 2 8 Securing the L shaped Bracket to the Wall 5 Align the two U shape grooves of the ZXSDR R8119 with the two rivets on the two point hanging plate and push the ZXSDR R8119 to the end to fix it on the two point hanging plate see Figure 2 9 2 7 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 16: ...mount fixture between the ZXSDR R8119 and the cement ceiling Note For non cement ceilings for example irremovable plasterboard ceiling and PVC board ceiling you must fix a wooden bar on the ceiling For how to install the wooden bar refer to Figure 2 15 It is not allowed to fix the two point hanging board to the ceiling by using self tapping screws Context For the installation components refer to t...

Page 17: ...s of the wall mount fixture to determine the locations of the holes to be drilled b Use an electric hammer drill to make three holes in the cement ceiling in accordance with the marks made on the cement ceiling The holes must be at least 35 mm deep Note After the holes are drilled clear the dust by using a dust collector 2 Hammer expansion pipes into the holes in the ceiling by using a rubber hamm...

Page 18: ...ging board to the wall mount fixture see Figure 2 11 Figure 2 11 Fixing Two Point Hanging Plate to the Wall Mount Fixture 4 Use three ST4 2 32 countersunk self tapping screws to fix the wall mount fixture to the expansion pipes on the ceiling torque 2 4 N m see Figure 2 12 2 10 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 19: ...he two point hanging plate and push the ZXSDR R8119 to the end to fix it on the two point hanging plate see Figure 2 13 Figure 2 13 Mounting the ZXSDR R8119 End of Steps 2 4 Installing a Removable Ceiling This procedure describes how to install the ZXSDR R8119 against a removable ceiling board 2 11 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 20: ...Overview Two point hanging board 1 L shaped bracket 1 M5 25 countersunk head screw 2 Wing nut and washer 2 Steps 1 Remove the ceiling mark the positions for drilling holes on the wall based the hole positions of the L shaped bracket see Figure 2 14 2 12 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 21: ... Board 1 Installation hole of the network cable 2 Installation hole of the two point hanging board Caution The network cable hole must be drilled in accordance with the size specified on the hole template If the hole size is smaller than that of the template hole the network cable will be stuck when the ZXSDR R8119 is dismounted 2 13 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confid...

Page 22: ...re 2 16 Securing the Bracket 4 Align the two U shape grooves of the ZXSDR R8119 with the two rivets on the two point hanging plate and push the ZXSDR R8119 to the end to fix it on the two point hanging plate see Figure 2 17 Figure 2 17 Mounting the ZXSDR R8119 5 Install the ceiling board to the original location End of Steps 2 14 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidenti...

Page 23: ... The Ethernet cable is as long as needed Caution l Do not use STP Ethernet cables l The maximum length of an Ethernet cable from the ZXSDR R8119 to the Pbridge should be less than 100 m Steps 1 Connect one end of the Ethernet cable to the ETH interface of the ZXSDR R8119 see Figure 3 2 3 1 SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 24: ...en every two cable ties with a proper tension and towards the same direction Cut up extra ties smoothly and cleanly 3 Root and bind the cable 4 Stick a label on the cover of the ZXSDR R8119 and write information on the label to indicate the port and Pbridge that the ZXSDR R8119 is connected For example PB1 PORT1 indicates that the ZXSDR R8119 is connected to the first port on the first Pbridge End...

Page 25: ... Figure 2 8 Securing the L shaped Bracket to the Wall 2 7 Figure 2 9 Mounting the ZXSDR R8119 2 8 Figure 2 10 Installing Expansion Pipes 2 10 Figure 2 11 Fixing Two Point Hanging Plate to the Wall Mount Fixture 2 10 Figure 2 12 Fixing the Wall Mount Fixture to the Ceiling 2 11 Figure 2 13 Mounting the ZXSDR R8119 2 11 Figure 2 14 Marking Holes 2 13 Figure 2 15 Hole Template of the Removable Ceilin...

Page 26: ...Figures This page intentionally left blank II SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 27: ...Tables Table 1 1 Interface Descriptions 1 1 Table 2 1 ZXSDR R8119 Installation Mode 2 1 III SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 28: ...Tables This page intentionally left blank IV SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Page 29: ...Glossary PoE V SJ 20150805085318 002 2016 08 18 R1 3 ZTE Proprietary and Confidential ...

Reviews: