ZXHN H267N Maintenance Management Guide
6.11 Configure the ETH Uplink Management
This page will help you convert LAN to WAN interface.
Steps
1.
On the main page of the ZXHN H267N, select
Management & Diagnosis > ETH
Uplink Management
to go to the
ETH Uplink Management
page, as shown in
.
Figure 6-19 ETH Uplink Management Page
2.
Once radio button
On
is set and
Apply
button is pressed, the device will reboot and
will work as WAN interface. Otherwise, when
Off
is applied, the device will work as
LAN interface.
3.
Click
Apply
button to apply the changes.
– End of Steps –
6.12 Configure the IPv6 Switch
This page provides
switch function.
Steps
1.
On the main page of the ZXHN H267N, select
Management & Diagnosis > IPv6
Switch
to go to the
IPv6 Switch
page, as shown in
.
6-16
SJ-20140702105807-002|2014-11-13 (R1.0)
ZTE Proprietary and Confidential