COMMISSIONING THE SYSTEM, INCLUDING P.S.E. 

 

 

The commissioning of this fire alarm system should be performed by a qualified commissioning engineer, who has 
an understanding of sections 2,3,& 4 of BS5839 pt 1:2002 (i.e. Design considerations, Limitations of false alarms, 
Installation recommendations) 

 

 

The system layout drawing should be checked for accuracy & stored in a safe place, accessible to any fire officer. 

 

 

The system summary section should be checked for accuracy. 

 

 

The fire alarm log book contact details should be checked for completeness.  

 

 

The insulation of cables should be checked in accordance with BS5839 Pt1: 2002 clause 38.2 for compliance. 

 

 

The Earthing should be checked in accordance with BS5839 Pt1: 2002 clause 38.2 for compliance. 

 

 

The PSE mains feed from a 3A spur should be checked

. It should be protected by an over current device (MCB) 

NOT an earth leakage device (RCD). 

 

 

The PSE Charger voltage should be checked & adjusted if necessary (28.3 with batteries disconnected). 

 

 

The battery voltage should be checked (should be between 24 & 27V) 

 

 

All call points & detectors can signal an alarm condition and indicate the correct zone (and text message) on the fire 
alarm panel. 

 

The Sound pressure level throughout the building should be checked for compliance with the recommendations of 
BS5839 Pt1: 2002 clause 16.2 

 

 

Any deviations from BS5839 Pt1 clause 7.2 should be listed in the Certificate of Installation & Commissioning. 

 

 

The Certificate of Installation & Commissioning should be completed, and the whole user manual passed to the 
relevant person on site. (They should be given a brief training on the basic operation of the FACP) 

 
 

DESIGN, INSTALLATION & COMMISSIONING CERTIFICATES 

 

The guidelines in BS 5839 Pt1: 2002 say that each stage of the system design and installation should have a separate 
certificate. Before this User Manual is handed over to the relevant person(s) on site, the following certificates (or the 
relevant company’s equivalent) should be completed by the system designer, the installation engineer and the 
commissioning engineer.  The System Description sheet should also be completed on Page 12 as should the relevant 
parts of the Log Book section on Page 13. 
 
The user, or responsible person should then complete the acceptance certificate to acknowledge that they have been 
instructed in the use of the fire alarm, have witnessed that it is operational, and have been given all the relevant 
paperwork (drawings, log book, user manual, etc) 
 

Summary of Contents for Premier M Plus 48

Page 1: ... M 48 LOG BOOK CERTIFICATES ...

Page 2: ...Date 26 4 2007 FIRE ALARM SYSTEM SUMMARY FIRE ZONE INFORMATION ZONE NO ZONE DESCRIPTION A brief description of all the rooms and areas contained in each zone QTY Smoke QTY MCP QTY Heat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 ...

Page 3: ...f all the rooms and areas contained in each circuit QTY SNDR QTY BELLS QTY Flasher CIRCUIT 1 CIRCUIT 2 CIRCUIT 3 CIRCUIT 4 ANY OTHER INFORMATION ABOUT THE SOUNDER CIRCUITS OUTPUT ROUTING INFORMATION TYPE OF OUTPUT CONNECTED WHAT HAPPENS WHEN ACTIVATED FIRE RELAY YES NO FAULT RELAY YES NO F A R E OUTPUT YES NO ADDITIONAL INFORMATION THE ABOVE INFORMATION WAS COMPLETED BY NAME COMPANY POSITION DATE ...

Page 4: ...es for when this book is full BS5839 part 1 recommends that fire alarm events should be subdivided recorded on separate sheets in the log book The event categories are Maintenance work to be completed by any engineer undertaking any work on the system False Alarms any alarm on the system not caused by a genuine fire This includes ENVIRONMENTAL FIRE LIKE PHENOMENA INAPROPRIATE ACTION ACCIDENTAL DAM...

Page 5: ...PREMIER M PLUS USER MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT MAN 122 PAGE 7 Issue 1 0 Authorised GH Date 26 4 2007 MAINTENANCE WORK ...

Page 6: ...R MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT MAN 122 PAGE 8 Issue 1 0 Authorised GH Date 26 4 2007 MAINTENANCE WORK DATE TIME ZONE LOCATION REASON FOR WORK WORK CARRIED OUT ADDITIONAL WORK REQUIRED SIGNED ...

Page 7: ...R MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT MAN 122 PAGE 9 Issue 1 0 Authorised GH Date 26 4 2007 MAINTENANCE WORK DATE TIME ZONE LOCATION REASON FOR WORK WORK CARRIED OUT ADDITIONAL WORK REQUIRED SIGNED ...

Page 8: ...PREMIER M PLUS USER MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT MAN 122 PAGE 10 Issue 1 0 Authorised GH Date 26 4 2007 FALSE UNWANTEDALARMS ...

Page 9: ...LSE ALARMS DATE TIME ZONE LOCATION CAUSE IF KNOWN OR ACTIVITIES IN ALARM AREA MAINTENANCE VISIT NEEDED YES NO MAINTENANCE FINDINGS CATEGORY OF FALSE ALARM FURTHER ACTION REQUIRED SIGNED CATEGORIES OF FALSE ALARMS ENVIRONMENTAL FIRE LIKE PHENOMENA INAPROPRIATE ACTION ACCIDENTAL DAMAGE MALICIOUS ACTION GENUINE BELIEF EQUIPMENT FALSE ALARM ...

Page 10: ...LSE ALARMS DATE TIME ZONE LOCATION CAUSE IF KNOWN OR ACTIVITIES IN ALARM AREA MAINTENANCE VISIT NEEDED YES NO MAINTENANCE FINDINGS CATEGORY OF FALSE ALARM FURTHER ACTION REQUIRED SIGNED CATEGORIES OF FALSE ALARMS ENVIRONMENTAL FIRE LIKE PHENOMENA INAPROPRIATE ACTION ACCIDENTAL DAMAGE MALICIOUS ACTION GENUINE BELIEF EQUIPMENT FALSE ALARM ...

Page 11: ...PREMIER M PLUS USER MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT MAN 122 PAGE 13 Issue 1 0 Authorised GH Date 26 4 2007 GENUINE ALARMS AND ALARM SYSTEM FAULTS ...

Page 12: ...OG BOOK Approved Document No GLT MAN 122 PAGE 14 Issue 1 0 Authorised GH Date 26 4 2007 ALL EVENTS OTHER THAN MAINTENANCE WORK OR FALSE ALARMS DATE TIME ZONE LOCATION DETAILS OF EVENT INCLUDING CAUSE IF KNOWN ACTION REQUIRED DATE COMPLETED INITIALS ...

Page 13: ...OG BOOK Approved Document No GLT MAN 122 PAGE 15 Issue 1 0 Authorised GH Date 26 4 2007 ALL EVENTS OTHER THAN MAINTENANCE WORK OR FALSE ALARMS DATE TIME ZONE LOCATION DETAILS OF EVENT INCLUDING CAUSE IF KNOWN ACTION REQUIRED DATE COMPLETED INITIALS ...

Page 14: ...nts detectors can signal an alarm condition and indicate the correct zone and text message on the fire alarm panel The Sound pressure level throughout the building should be checked for compliance with the recommendations of BS5839 Pt1 2002 clause 16 2 Any deviations from BS5839 Pt1 clause 7 2 should be listed in the Certificate of Installation Commissioning The Certificate of Installation Commiss...

Page 15: ...tions of section 2 of BS 5839 1 2002 for the system category described below except for the variations if any stated in this certificate Name in block letters Position Signature Date For and on behalf of Address Postcode The extent of liability of the signatory is limited to the system described below Variations from the recommendations of section 2 of BS 5839 1 2002 see Clause 7 Brief description...

Page 16: ... been provided to the user to enable limitation of false alarms Other measures as follows INSTALLATION COMMISSIONING RECOMMENDATIONS It is strongly recommended that installation and commissioning be undertaken in accordance with the recommendations of section 4 and section 5 of BS 5839 1 2002 respectively In accordance with the recommendations of clause 35 2 6 of BS 5839 1 2002 it is recommended t...

Page 17: ...certificate Name in block letters Position Signature Date For and on behalf of Address Postcode The extent of liability of the signatory is limited to the system described below Extent of the installation work covered by this certificate Specification against which the system was installed Variations from the specification and or section 4 of BS 5839 1 2002 see clause 7 The wiring has been tested ...

Page 18: ...M 48 Fire Alarm System installed at Address Installation work is as far as can be reasonably ascertained of an acceptable standard The entire system has been inspected and tested in accordance with the recommendations of 39 2 c of BS 5839 1 2002 The system performs as required by the specifications prepared by Taking into account the guidance contained in section 3 of BS 5839 1 2002 I we have not ...

Page 19: ...installed at Address The following work is required before the system can be accepted All installation work appears to be satisfactory The system is capable of giving a fire alarm signal The facility for remote transmission of alarms to an alarm receiving centre operates correctly Delete if not applicable The following documents have been provided to the purchaser or user As fitted drawings Operat...

Reviews: