
4.
Tap “Quick Test” or “Full Test”. Then, tap “Execute”.
The card performance test will start.
Quick testing
Full testing
The Quick Test should take about 30 seconds.
The amount of time required for the full test will
be shown.
The result of the test will be shown when it completes.
During a full test, if the access rate MAX reaches
100%,
the card will fail (NG).
NOTE
:
Even if a performance test result is "OK", there is no guarantee that writing errors will not occur. This
information is just to provide guidance.
HINT:
Tap
to cancel a test.
156
Summary of Contents for R20
Page 5: ...MIDI implementation chart 166 Specifications 167 5 ...
Page 11: ...Connection example This is an example of connections to record a band in a studio 11 ...
Page 78: ... Move playback position Slide playback header left right or tap the ruler 78 ...
Page 96: ...Completing editing 1 Tap on the Waveform Editing Screen The Track View Screen will reopen 96 ...
Page 128: ...4 Tap Option This opens the Project Option Screen for the selected project 128 ...
Page 137: ...5 When Done appears tap Close This completes importing and opens the Projects Screen 137 ...