background image

8

 Pure Air Control

LOCATION

THE LIGHT ABOVE SHOWS THAT THE INDICATED 

FILTER IS OVERFILLED. IN THAT CASE, FOR THE 

SYSTEM TO WORK CORRECTLY,  PLEASE CONTACT 

YOUR DISTRIBUTOR TO REPLACE THEM.

GRSV       F7          G4         H14

FILTER

REPLACEMENT

(*) The electronic board includes an LED system to indicate the condition of the filters. If they 

are off, the filters are in correct condition. When they turn red, the filter of the LED that is 

switched on must be replaced.

(**) Details of the plug and play cables (see Installation Manual - QR code link).

IMPORTANT:

- If the customer has NOT purchased the sensor, do NOT touch ANY part of the terminal 

strip supplied, i.e. cables 18 and 20 must be together (bridge mode).
- If the customer HAS purchased the sensor, separate the grey cables 18 and 20 from the 

terminal strip for the equipment to work correctly. This will ensure the sensor controls the 

equipment in line with the air quality.

· Side black cable = 230V electrical power supply

· Lower grey cable = for connection to Z3D air quality sensor to indicate filter inspection, 

2 cables marked 5 and 6 that correspond to the numbers where they should be connected 

inside the sensor.

· Side grey cable = for connection to Z3D air quality sensor for ON/OFF control of the 

purifier according to the indoor air quality limits. These are 2 cables marked 18 and 20 

that correspond to the numbers where they should be connected inside the sensor.

Mai

nten

ance

suspended 

on mount

M

ai

nt

en

an

ce

M

ain

ten

an

ce

HORIZONTAL                                                         VERTICAL                                            

TRANSVERSAL                    

Maintenance

Summary of Contents for PURE AIR CONTROL 500V

Page 1: ...PUESTA EN MACHA START UP PROCEDURE PROC D DE MISE EN MARCHE MESSA IN FUNZIONE PROCEDIMENTO DE ARRANQUE PURE AIR CONTROL 500 800 1200V...

Page 2: ...registro para verificar que durante el transporte no haya habido movimientos asegurando que el pre filtro el GRSystem y el filtro absoluto est n correctamente colocados y fijados en su posici n El pan...

Page 3: ...de aire Flujo de aire Flujo de aire Flujo de aire Flujo de aire Flujo de aire CON TAPA DE REGISTRO LATERAL 1 PRESOSTATO H14 2 PCB Placa electr nica de gesti n 3 INTERRUPTOR ROTATIVO 4 SONDA DE PRESI N...

Page 4: ...cliente S ha adquirido la sonda debe separar los cables gris 18 y 20 de la regleta para el correcto funcionamiento del equipo de este modo la sonda gobernar el equipo en funci n de la calidad de aire...

Page 5: ...i n Plug Play por lo que no es necesario configurar nada La unidad se pone en marcha autom ticamente a la puesta en tensi n Ir a la p gina 9 del MANUAL DEL INSTALADOR para revisar el procedimiento de...

Page 6: ...this start up guide Open the inspection panel to check that nothing has moved during transport making sure the pre filter the GRSystem and the absolute filter are correctly in place and secure The ins...

Page 7: ...ntenance Maintenance Air flow Air flow Air flow Air flow Air flow Air flow WITH SIDE INSPECTION COVER 1 H14 PRESSURE SWITCH 2 PCB Printed circuit board 3 ROTARY SWITCH 4 DIFFERENTIAL PRESSURE SENSOR5...

Page 8: ...0 must be together bridge mode If the customer HAS purchased the sensor separate the grey cables 18 and 20 from the terminal strip for the equipment to work correctly This will ensure the sensor contr...

Page 9: ...7 08029 Barcelona www eurofred es Please read the Installation Manual at the following link for more information https www zonair3d com installation manual pac_v START UP PROCEDURE The equipment is su...

Page 10: ...che Il est recommand d ouvrir le panneau de registre pour v rifier que durant le transport il n ait pas subi de secousses et s assurer que le pr filtre le GRSystem et le filtre absolu soient correctem...

Page 11: ...air Flux d air Flux d air Flux d air Flux d air Flux d air AVEC COUVERCLE DE REGISTRE LAT RAL 1 PRESSOSTAT H14 2 PCB Plaque lectronique de gestion 3 INTERRUPTEUR ROTATIF 4 CAPTEUR DE PRESSION DIFF RE...

Page 12: ...de la qualit de l air C ble noir lat ral alimentation lectrique 230V C ble gris inf rieur pr vision de connexion capteur de qualit de l air Z3D pour notification de r vision des filtres 2 c bles marqu...

Page 13: ...L INSTALLATEUR pour r viser le proc d de mise en marche ZONAIR3D Distribu par DAITSU En cas de besoin d assistance technique ou de pi ces de rechange veuillez contacter le Service Client d Eurofred T...

Page 14: ...e il prefiltro il GRSystem e il filtro assoluto siano correttamente posizionati e fissati in posizione Il pannello si apre allentando le 8 viti a stella M6 4 su ciascun lato ed di fondamentale importa...

Page 15: ...MOTORE SEZIONE PREFILTRO E GRSYSTEM Manutenzione Manutenzione Flusso d aria Flusso d aria Flusso d aria Flusso d aria Flusso d aria Flusso d aria 1 2 3 4 5 H L CON COPERCHIO LATERALE 1 PRESSOSTATO H1...

Page 16: ...il cliente ha acquistato la sonda dovr separare i cavi grigi 18 e 20 dalla striscia per il corretto funzionamento del dispositivo in questo modo la sonda controller il dispositivo in base alla qualit...

Page 17: ...LL INSTALLATORE per rivedere la procedura di avviamento ZONAIR3D Distribuito da DAITSU Per ricevere assistenza tecnica o parti di ricambio contattare il servizio di assistenza clienti Eurofred ai segu...

Page 18: ...e il prefiltro il GRSystem e il filtro assoluto siano correttamente posizionati e fissati in posizione Il pannello si apre allentando le 8 viti a stella M6 4 su ciascun lato ed di fondamentale importa...

Page 19: ...MOTORE SEZIONE PREFILTRO E GRSYSTEM Manutenzione Manutenzione Flusso d aria Flusso d aria Flusso d aria Flusso d aria Flusso d aria Flusso d aria 1 2 3 4 5 H L CON COPERCHIO LATERALE 1 PRESSOSTATO H1...

Page 20: ...bo preto lateral alimenta o el trica a 230V Cabo cinzento inferior previs o de liga o a sonda de qualidade do ar Z3D para aviso de revis o dos filtros dois cabos marcados com os n meros 5 e 6 que corr...

Page 21: ...enat 97 08029 Barcelona www eurofred es Para mais informa es pode consultar o Manual do instalador na seguinte liga o https www zonair3d com installation manual pac_v PROCEDIMENTO DE ARRANQUE O aparel...

Page 22: ...22 Pure Air Control...

Page 23: ...23 Pure Air Control...

Page 24: ...QUICK USER GUIDE_PAC500 800 1200V PURE AIR JUST BREATHE...

Reviews: