QWIK JON
®
ULTIMA QWIK REFERENCE GUIDE
STEP 1
LOCATION SELECTION
GFCI
OUTLET
WATER
SUPPLY
DISCHARGE
PIPE
VENT
PIPE
LEVEL FLOOR
BALL OR GATE VALVE
SOLD SEPARATELY.
SK2588
STEP 2
LEVELING OF PUMP UNIT
SK2614
SK2615
STEP 3-1
STEP 3-3, 3-4
STEP 3-2
1/8"
plan your new installation carefully.
floor:
The floor should be structurally sound and level within
1
/
8
". If the floor is not level, use hydraulic
cement or similar material to level the floor.
Water:
A water supply will be needed to operate the shower and lav.
Electrical:
A 115 volt GFCI receptacle will be needed to supply electrical power to the pump.
Sewage:
Access to a sewage line is required. The Qwik Jon
®
Ultima requires a 1" (or 3/4" if codes
permit) sewage discharge line to connect to an existing sewage line. A ball or gate valve should be
installed in the discharge line.
Vent:
Access to a vent pipe is required. The use of a mechanical vent system is NOT recommended.,
as the toilet will not flush.
NOTE:
If a built-in installation is to be used, locate the pump unit in an area that will allow access
to the pump and switch.
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do not puncture the pump unit!
Level the pump unit within
1
/
8
" using hydraulic cement or similar material.
STEP 3
ROUGH-IN
1)
Position the pump unit a minimum of 1/8" from the wall with the
inlet facing forward. Attach the bellows to the inlet using the
worm drive clamp provided.
2)
Place the toilet in front of pump unit aligning the discharge of the
toilet with the inlet of the pump unit. Make sure that the bellows
will bridge the gap adequately for final installation. The toilet
tank should be a minimum of 1/2" from the wall.
3)
Lightly mark the locations of the pump unit, toilet and closet
bolt locations on the floor. Lightly mark the wall with the height
of the pump unit and the bottom and sides of the toilet tank to
ensure against interference from pipe runs later.
4)
Remove the toilet from the pump unit and set it aside.
(STAND-ALONE INSTALLATION)
(BEHIND THE WALL INSTALLATION)
1)
Installing the grinder unit behind a wall will require an
extension kit (P/N 10-2123) sold separately.
2)
Place the toilet assembly a minimum of 1/2" from the wall
and mark the closet bolt locations on the floor.
3)
Measure the appropriate length of 3½" Schedule 40 PVC
pipe provided with the extension kit and cut it to length.
See sketch at right.
4)
Set toilet aside.
Toilet assembly is top heavy. Take special
precautions to ensure that toilet does not tip over and break.
STEP 4-4
STEP 4-3
STEP 4-2
STEP 4-1
SK2616