background image

4

© Copyright 2012 Zoeller Co. All rights reserved.

QWIK JON

® 

ULTIMA QWIK REFERENCE GUIDE

  STEP 1 

LOCATION SELECTION

GFCI

OUTLET

WATER

SUPPLY

DISCHARGE

PIPE

VENT

PIPE

LEVEL FLOOR

BALL OR GATE VALVE

SOLD SEPARATELY.

SK2588

  STEP 2 

LEVELING OF PUMP UNIT

SK2614

SK2615

STEP 3-1

STEP 3-3, 3-4

STEP 3-2

1/8"

plan your new installation carefully.
floor:

 The floor should be structurally sound and level within 

1

/

8

". If the floor is not level, use hydraulic 

cement or similar material to level the floor.

Water:

 A water supply will be needed to operate the shower and lav.

Electrical:

 A 115 volt GFCI receptacle will be needed to supply electrical power to the pump.

Sewage:

 Access to a sewage line is required. The Qwik Jon

®

 Ultima requires a 1" (or 3/4" if codes 

permit) sewage discharge line to connect to an existing sewage line. A ball or gate valve should be 

installed in the discharge line.

Vent:

 Access to a vent pipe is required. The use of a mechanical vent system is NOT recommended., 

as the toilet will not flush.

NOTE:

 If a built-in installation is to be used, locate the pump unit in an area that will allow access 

to the pump and switch.

 Do not use wooden shims to level the pump unit!

 Ensure that nails, screws or other sharp objects do not puncture the pump unit!

Level the pump unit within 

1

/

8

" using hydraulic cement or similar material.

  STEP 3 

ROUGH-IN

 

1) 

Position the pump unit a minimum of 1/8" from the wall with the 

inlet facing forward. Attach the bellows to the inlet using the 

worm drive clamp provided.

  2) 

Place the toilet in front of pump unit aligning the discharge of the 

toilet with the inlet of the pump unit. Make sure that the bellows 

will bridge the gap adequately for final installation. The toilet 

tank should be a minimum of 1/2" from the wall.

  3) 

Lightly mark the locations of the pump unit, toilet and closet 

bolt locations on the floor. Lightly mark the wall with the height 

of the pump unit and the  bottom and sides of the toilet tank to 

ensure against interference from pipe runs later.

  4) 

Remove the toilet from the pump unit and set it aside.

(STAND-ALONE INSTALLATION)

(BEHIND THE WALL INSTALLATION)

 

1) 

Installing  the grinder unit behind  a wall will require an 

extension kit (P/N 10-2123) sold separately. 

  2) 

Place the toilet assembly a minimum of 1/2" from the wall 

and mark the closet bolt locations on the floor.

  3) 

Measure the appropriate length of 3½" Schedule 40 PVC 

pipe provided with the extension kit and cut it to length. 

See sketch at right.

  4) 

Set toilet aside.

 

  Toilet  assembly  is  top  heavy.  Take  special 

precautions to ensure that toilet does not tip over and break.

STEP 4-4

STEP 4-3

STEP 4-2

STEP 4-1

SK2616

Summary of Contents for QWIK JON ULTIMA 203

Page 1: ...ANDLING DO NOT UNDER ANY CIRCUMSTANCES REMOVE THE GROUND PIN The 3 prong plug must be inserted into a mating 3 prong grounded receptacle If the installation doesnothavesuchareceptacle itmustbechangedtothepropertype wired and grounded in accordance with the local electrical code and all applicable local codes and ordinances 7 Risk of electrical shock Do not remove power supply cord and strain relie...

Page 2: ...r from date of purchase by the end user or 18 months from date of original manufacture of the product whichever comes first Parts that fail within the warranty period one year from date of purchase by the end user or 18 months from the date of original manufacture of the product whichever comes first that inspections determine to be defective in material or workmanship will be repaired replaced or...

Page 3: ...twostops C WATER LEVEL EXCESSIVE BEFORE PUMP TURNS ON Float ON point adjusted too high Lower the upper float stop D PUMP WILL NOT SHUT OFF OR RUNS TOO LONG BEFORE WATER IS PUMPED Pump not plugged into piggyback float switch receptacle Ensure pump is not plugged directly into the outlet Plug pump into piggyback float switch receptacle Debris under float Remove debris from around float Faulty float ...

Page 4: ...arp objects do not puncture the pump unit Level the pump unit within 1 8 using hydraulic cement or similar material STEP 3 ROUGH IN 1 Position the pump unit a minimum of 1 8 from the wall with the inlet facing forward Attach the bellows to the inlet using the worm drive clamp provided 2 Place the toilet in front of pump unit aligning the discharge of the toilet with the inlet of the pump unit Make...

Page 5: ...sly marked above 6 Clean and solvent weld vent piping as required for proper venting SK2673 SK2591 DRILL POINT 1 1 2 SLIP INSIDE 2 MPT OUTSIDE SK2586 Figure 3 1 Figure 3 2 Figure 3 3 Discharge Vent Do not put glue in this area 1 Install the closet bolts at the points marked earlier 2 Place the toilet assembly over the closet bolts Install the anchoring hardwareandtighteninanalternatingpattern Chec...

Page 6: ...40 5 10 0 2 5 25 100 80 60 20 50 TOTAL DYNAMIC HEAD FLOW PER MINUTE SEWAGE PUMP PERFORMANCE CURVE MODEL 202 FEET METERS 4 10 15 6 20 Shut off Head 15 4 6 Feet Meters 5 10 1 5 3 0 MODEL 30 ft 9 1m 35 132 Gal Liters 45 40 170 151 202 45 40 35 30 25 30 35 120 140 160 180 8 10 20 6 1 27 102 25 7 6 16 61 018512 ...

Page 7: ... rights reserved MAIL TO P O BOX 16347 Louisville KY 40256 0347 SHIP TO 3649 Cane Run Road Louisville KY 40211 1961 502 778 2731 1 800 928 PUMP FAX 502 774 3624 Your Peace of Mind is OurTop Priority visit our web site www zoeller com ...

Page 8: ... Copyright 2012 Zoeller Co All rights reserved ...

Reviews: