background image

PIPING

1.

6.

7.

2.

3.

4.

5.

Proper  venting is required.

  STEP 4 

 

Cut cleanly and remove burrs and rough edges to avoid

Note:

Adding other bathroom

-The Qwik Jon

®

Choice is designed

to accept additional bathroom

utilizing the two side inlets.

Available for connecting DN25 (1") pipe. Simply reverse the pipe adaptor 

fixtures

fixtures

and cut out the molded-in plug at the provided indentation.

the potential for clogging. 

Cut and dry-fit the pipe and fittings as required for DN25 (1") diameter 

discharge pipe (may be reduced to DN20 [3/4"] diameter of local code 

allows it.)

 

        When applying solvent weld to discharge fitting, ensure 

that none gets into the check valve assembly. Pay close attention to the 

proper alignment of the discharge fitting previously marked.
For markets requiring a pipe vent, clean and solvent weld the vent piping 

as required for proper venting.
Optional carbon filter vent:

For markets where a carbon filter vent is allowed, please replace the 

carbon filter periodically to keep ventilation functioning properly.

While dry-fitting the discharge pipe, position and mark the location of the 

pump unit discharge fitting.

Temporarily set the toilet in place to check that there is no piping interfer-

ence. Remove the toilet and set it aside.
Clean, prime and solvent weld the discharge piping and pump unit 

discharge fitting.

Cut and dry-fit DN40 (1-1/2") vent pipe as required to ensure that the vent 

pipe does not interfere with other components. Make the connection to 

the pump unit with the provided street elbow. A 2" x 1" 90° discharge 

fitting has been provided. However, it may be easier to pipe straight up 

depending on the installation.

 

© Copyright 2022 Zoeller   Co. All rights reserved.

®

 - 7 - 

   

Summary of Contents for QWIK JON PREMIER 201

Page 1: ...e m i t t a s n o i t i d n o c s t c e of publication Consult factory r o s e i c n a p e r c s i d g n i d r a g e r s e i c n e t s i s n o c n i Register your Zoeller Pump Company Product on our...

Page 2: ...oduct failure repair or replacement This warranty does not apply to and there shall be no warranty for any material or product that has been disassembled without prior approval of Manufacturer subject...

Page 3: ...Copyright 2022 Zoeller Co All rights reserved 3 SERVICE PARTS 201 0008 084993 084993 220V 110V 084994 085006 084995 084996 084998 085087 084840 085180 085002 084858 TYPICAL PIPING CONFIGURATIONS...

Page 4: ...lush out debris Low or incorrect voltage Have a qualified electrician check house wiring Damaged Impeller Contact a Zoeller Authorized Service and Warrenty Center Incorrect float adjustment Contact Pr...

Page 5: ...level the pump unit Ensure that nails screws or other sharp objects do not puncture the pump unit Level the pump unit to within 3 mm 1 8 using hydraulic cement or similar material STEP 2 LEVELING OF...

Page 6: ...STEP 3 ROUGH IN Copyright 2022 Zoeller Co All rights reserved 6...

Page 7: ...d For markets requiring a pipe vent clean and solvent weld the vent piping as required for proper venting Optional carbon filter vent For markets where a carbon filter vent is allowed please replace t...

Page 8: ...Copyright 2022 Zoeller Co All rights reserved 8...

Page 9: ...POWER STEP 5 Copyright 2022 Zoeller Co All rights reserved 9...

Page 10: ...oeller Co All rights reserved 10 MAINTENANCE STEP 6 Mechanical and Electrical Hazard Disconnectpowerprior to maintenance or opening Thisequipmentis only to be serviced and maintained by a quali ed pro...

Page 11: ...the lid o the Qwik Jon Premier Copyright 2022 Zoeller Co All rights reserved 11 These drawings are for reference only Exact components may di er by region These drawings are for reference only Exact...

Page 12: ...can be disconnected from the volute of the pump to be cleared of debris Copyright 2022 Zoeller Co All rights reserved 12 These drawings are for reference only Exact components may di er by region The...

Page 13: ...62 m 534 6 m 20 5 m 15 4 m 13 3 m 10 1 5 m 5 1 DN25 pipe max 42 m 139 3 4 DN20 pipe max 28 m 92 7 m 23 PUMP PERFORMANCE CURVE TOTAL DYNAMIC HEAD FLOW TOTAL DYNAMIC HEAD FLOW MODEL 115V 220V Feet Meter...

Page 14: ...30mA 1 2 3 4 5 6 7 8 9 10 11 12 104 40 1 2 3 4 5 6 1 7 6 Qwik Jon Premier 201 6 1 2 3 2 1 2 60 Hz Visit our website www zoellerpumps com 2022 Zoeller 1...

Page 15: ...1 2 3 4 5 3mm 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 2022 Zoeller 2...

Page 16: ...3 3 1 Qwik Jon Premier 201 0007 115V 2 084993 3 084994 4 084996 085006 5 084998 6 085087 7 084840 8 085000 9 085002 084858 201 0008 084993 084994 084995 085006 084998 085087 084840 085180 085002 0848...

Page 17: ...15 30 E A B C D 2 5 QWIK JON CHOICE 2022 Zoeller 4...

Page 18: ...ik Jon Premier 081887 38 mm 178 mm 89 mm 384 mm 307 mm 233 mm 121 mm 488 mm 188 mm SK2588 QWIK JON PREMIER MODEL 201 1 3mm 1 2 20mm 115 220 Qwik Jon Choice 1 2 5 m m 3 2 m m 3 4 19mm 25mm 2022 Zoeller...

Page 19: ...3 2 3mm 3mm 13mm 1 2 3 4 10 3050 13mm 89mm 3 1 2 PVC Schedule 40 3 1 2 3 4 2022 Zoeller 6...

Page 20: ...38 mm 178 mm 89 mm 384 mm 307 mm Qwik Jon Premier 1 32mm 3 4 25mm 1 2 3 4 4 Qwik Jon Premier 1 32mm O 5 2022 Zoeller 7...

Page 21: ...Qwik Jon Premier 1 3 4 44 Qwik Jon Premier 2022 Zoeller 8...

Page 22: ...Qwik Jon Premier 5 2022 Zoeller 9...

Page 23: ...6 2022 Zoeller 10...

Page 24: ...Qwik Jon Premier 2022 Zoeller 11...

Page 25: ...2022 Zoeller 12...

Page 26: ...42 DN20 25 mm 3 4 28 DN25 32 mm 1 77 DN20 25 mm 3 4 52 DN25 32 mm 1 112 DN20 25 mm 3 4 77 DN25 32 mm 1 147 DN20 25 mm 3 4 101 DN25 32 mm 1 182 DN20 25 mm 3 4 126 DN25 32 mm 1 234 DN20 25 mm 3 4 162 2...

Reviews: