background image

1

© Copyright 2021 Zoeller

®

 Co. All rights reserved.

SECTION: Z4.10.305

ZM2609

0621

Supersedes

0318

NOTICE TO INSTALLER:  Instructions must remain with installation.

Model Number: ______________   Date Code: _______________

 

Simplex 

  

 

Duplex 

 

Packaged System

 

 

Field Assembled System

 

Job Name: ____________________________________________

Distributor: ____________________________________________

Date of Purchase: _________  Zoeller S/O No.: ______________

Contractor: ____________________________________________

Date of Installation: ____________________________________

System Readings During Start-up:   Voltage _____ Amps ______

 

OWNER’S MANUAL

MODELS 7011, 7012 & 7013 SUBMERSIBLE GRINDER UNITS

the ownership of a Zoeller submersible wastewater product.  Please 
read and review this manual before installing the product.  Follow 
the steps in this manual for a proper start-up.  Many items contained 
within, when followed correctly, will not only ensure a long and 
problem-free life for the pump, but also save time and money during 
installation.  Reference ZM2634 for model 7011, ZM2635 for model 
7012 and ZM2636 for model 7013 replacement parts.  Should further 
assistance be necessary please call our Technical Service Department 
at 1-800-928-PUMP (7867).

Owner’s Information

Safety Instructions

TO AVOID SERIOUS OR FATAL PERSONAL INJURY OR MAJOR 
PROPERTY DAMAGE, READ AND FOLLOW ALL SAFETY  
INSTRUCTIONS IN THIS MANUAL AND ON THE PUMP.

THIS MANUAL IS INTENDED TO ASSIST IN THE INSTALLATION AND 
OPERATION OF THIS UNIT AND MUST BE KEPT WITH THE PUMP.

This is a 

SAFETY ALERT SYMBOL

.

When you see this symbol on the pump or in the 

manual, look for one of the following signal words 

and be alert to the potential for personal injury or 

property damage.

Warns of hazards that 

WILL

 cause serious personal    

injury, death or major property damage.

Warns of hazards that 

CAN

 cause serious personal 

injury, death or major property damage.

Warns of hazards that 

CAN

 cause personal injury or 

property damage.

INDICATES SPECIAL INSTRUCTIONS WHICH ARE 
VERY IMPORTANT AND MUST BE FOLLOWED.

THOROUGHLY REVIEW ALL INSTRUCTIONS AND WARNINGS PRIOR 
TO PERFORMING ANY WORK ON THIS PUMP.

MAINTAIN ALL SAFETY DECALS.

PUMPS WITH THE “UL” MARK AND PUMPS WITH THE “US” MARK 
ARE TESTED TO UL STANDARD UL778. CSA CERTIFIED PUMPS ARE 
CERTIFIED TO CSA STANDARD C22.2 NO. 108.

CAUTION

Table of Contents

Safety Instructions .................................................................................... 1
Limited Warranty and Application ......................................................... 2
Preinstallation Checklist ......................................................................... 3
General Information .................................................................................. 4
Pump Wiring Instructions ........................................................................ 5
Typical Indoor Prepackaged System..................................................... 6
Indoor Prepackaged Installation Instructions ..................................... 7
Typical Outdoor Prepackaged System .................................................. 8
Outdoor Prepackaged Installation Instructions .................................. 9
Operation .................................................................................................. 10
Cutter Maintenance ................................................................................ 11
Service Checklist .................................................................................... 12

REFER TO WARRANTY ON PAGE 2.

 

Congratulations on the purchase of a Zoeller submersible grinder 

pump.  For over seventy years the name Zoeller has represented the 
standard for submersible dewatering and sewage pumps.  The same 
high quality workmanship and easy maintenance design has been 
incorporated into this line of heavy-duty submersible grinder pumps.  
This Zoeller pump will provide years of trouble-free service when 
installed according to the manufacturer’s recommendations.
 

This manual incorporates the installation, operation, 

maintenance, and service instructions into one document to aid in 

P/N 151086

MAIL TO:

  P.O. BOX 16347 • Louisville, KY  40256-0347

SHIP TO:

  3649 Cane Run Road • Louisville, KY  40211-1961

(502) 778-2731 • 1 (800) 928-PUMP • 

FAX

 (502) 774-3624

Visit our website:

zoellerengineered.com

Product information presented 

here reflects conditions at time 

of  publication. Consult factory 

regarding discrepancies or 

inconsistencies.

Register your 

Zoeller Engineered Product 

on our website:

http://reg.zoellerengineered.com/

Summary of Contents for 7011

Page 1: ...s personal injury death or major property damage Warns of hazards that CAN cause serious personal injury death or major property damage Warns of hazards that CAN cause personal injury or property dama...

Page 2: ...urer subjected to misuse misapplication neglect alteration accidentoractofGod thathasnotbeeninstalled operatedormaintained inaccordancewithManufacturer sinstallationinstructions thathasbeen exposedtoo...

Page 3: ...ntrol switches will not hang up on the grinder pump or other pit peculiarities and are secured so that the grinder pump will shut off It is recommended to use rigid pipe and fittings and the pit be 24...

Page 4: ...n on system installation 3 Allelectricalconnectionsincludingpumptocontrolboxandpower supply to control panels must comply with the National Electrical Code and applicable local codes Conduit and panel...

Page 5: ...f electrical shock Do not remove the power supply cord and strain relief or connect conduit directly to pump Installation and checking of electrical circuits and hardware should be performed by a qual...

Page 6: ...All installations must comply with all applicable electrical and plumbing codes including but not limited to the National Electrical Code local regional and or state plumbing codes etc Indoor Prepack...

Page 7: ...perly 5 Dig a hole for the basin The basin should be located in a very low trafficareawithin15 ofthepowerdisconnect Theholeshouldbeat least8 largerindiameterthanthebasininordertoleave4 ofbackfill all...

Page 8: ...LASS AFD 1 25 2 Z RAIL 2 CAST IRON CHECK VALVE 3 4 GUIDE RAILS 2 SCH 80 BALL VALVE 2 FLEX BOOT FITTING LOCATION VARIES WITH BASIN DEPTH FLOAT TREE ASSEMBLY 2HP GRINDER PUMP 2 PVC SCH 80 PLBG 1 8 302 S...

Page 9: ...alled in the basin s side wall in a 5 hole drilled with a hole saw at a location lining up with the inlet pipe 6 The bottom of the excavation can now be properly backfilled compacted and leveled Set b...

Page 10: ...curely installed Floats positioned properly Discharge valves open 3 16 vent hole drilled in pipe between check valve and pump Once the above has been verified proceed with the following checks Pump po...

Page 11: ...t and remove the spacer shims located behind the star cutter 5 Remove the three cap screws holding the disc and remove disc from the pump 6 The disc and star cutter can be replaced with new service pa...

Page 12: ...ng insulated protective sole shoes and not standing in water Under flooded conditions contact your local electric company or a qualified licensed electrician for disconnecting electrical service to th...

Reviews: