Page 22 of 26
BUOYANCY CHAMBER – Main steps
II-2-SETTING UP THE BUOYANCY CHAMBER – MAIN STEPS
When assembling the boat, it is important that you follow the procedure in the correct order.
Proceed step by step, referring each time to the pages indicated for explanations.
INFLATION PROCEDURE
PAGE
SECTION
1. Make an inventory of all your boat’s components
and learn to recognize them
5 to 7
Inventory
Location
2. Start inflating the buoyancy chamber
using working pressure
20-21
Installing the buoyancy
chamber
22 to 25
Air pressure
II -3-INFLATION SYSTEM
THE INFLATION PUMP
a. adaptor
b. tube nozzle
c. tube connector
d. inflation port
a
b
c
d
EASY PUSH VALVES
To change position
In inflating position
In deflating position
Push
The membrane is closed, the
knob is up
The membrane is open, the
knob is down
NOTE:
The plugs of the easy push valves are designed to
screw in and unscrew without forcing.
Never force the caps as you will run the risk of
unscrewing the whole of the valve’s internal
inflation system.