4
Install the Nature
2
Spa
The Nature
2
Spa is designed to fit most spas.
Zodiac assumes no liabilities for the product if installed in
any way other than the methods described in this manual.
1 Drain and refill your spa. Balance the water per spa
manufacturer guidelines.
2 Install the Nature
2
Spa after water is balanced. Refer to
Assembly and Installation Diagrams below for instructions
regarding your particular model’s installation.
3 Superoxidize the spa water with an approved source
of chlorine according to manufacturer's instructions to
burn off contaminants and activate cartridge.
Important:
Initial superoxidation with dichlor
*
*
is required to burn
off contaminants and activate cartridge.
• Add 1.5 tablespoons of dichlor to spa per 1000 litres.
Note: 1.5 tablespoons is approximately 24 grams.
• Do not enter the spa if the free available chlorine
residual is over 5 ppm.
4 Run spa according to recommendations supplied to you
by the manufacturer of your spa.
Assembly and Installation Diagrams
The Nature
2
Spa comes in three parts; the main body (A)
and two support stems (B, and C).
1 Connect the support stems together and press onto main
body to create a single device as shown.
A
B
C
A
B
C