2/10
PROCEDURE FOR PUTTING THE BOAT INTO USE
To identify the boat, turn to the APPENDIX:
•
technical specifications (page A-2, A-3),
•
description (page A-4, A-5).
ATTENTION
BOAT ASSEMBLY PROCEEDS IN A CERTAIN ORDER THAT WE
RECOMMEND YOU FOLLOW CAREFULLY. REFER TO THE PAGES
INDICATED BELOW FOR THE STEP BY STEP INSTRUCTIONS
Procedure for putting the boat into use and storage
Page Section
1. Inventory upon opening
2
INVENTORY
2. Turn the valves to the inflation position
3
INFLATION SYSTEM
3. Lightly inflate the buoyancy tube
5
BOAT INFLATION
4. Assemble the floorboards and stringers
4
BOAT ASSEMBLY
5. Inflate the buoyancy tube
5
BOAT INFLATION
6. Inflate the keel
5
BOAT INFLATION
7. Adjust the pressures
6 - 7
AIR PRESSURE
8. Store the boat
8
DEFLATION/FOLDING
INVENTORY UPON OPENING
WARNING
DO NOT USE CUTTING INSTRUMENTS SUCH AS KNIVES OR
CUTTERS TO OPEN CARDBOARD BOXES
MARK 2
MARK 3
Carrying bag 1
1
1
1. Buoyancy tube
1
1
2. Inflation Pump
1
1
3. Owner’s Manual (Vol. 2)
1
1
4. Repair kit (repair materials,
pressure indicator)
1
1
Carrying bag 2
1
1
1. Floorboard
Number of elements
Aluminum
3 Alu + 2 Wood
Aluminum
3 Alu + 2 Wood
2. Stringers
2
2
3. Paddles
2
2
You can equip your boat with many optional accessories (wheels, ladder, lifting rings, etc…).
Ask your agent for advice.
NOTE
If you wish to add lifting rings (for davits) you must attach them to the
buoyancy tube, under no circumstancies to the floorboard.