Page 39 / 65
Issue 2
E
N
G
L
I
S
H
INSTALLATION AND CIRCUIT
With twin engines, a second battery is
required. A load insulator is often built
into the engine’s design. It job is to
recharge the batteries while the engine
is running.
The coupler system enables the engines
to be started with either one battery, or
by coupling the batteries (in parallel), or
start them with a single battery if the
other is faulty.
Engine A starts with batteries 1 and 2.
Engine B starts with batteries 1 and 2.
Summary of Contents for MEDLINE 9
Page 15: ...Page 15 65 Issue 2 E N G L I S H DESCRIPTION Handling...
Page 34: ...Page 34 65 Issue 2 INSTALLATION AND CIRCUIT ELECTRICAL V 2 1 COMFORT Fuse box...
Page 35: ...Page 35 65 Issue 2 E N G L I S H INSTALLATION AND CIRCUIT V 2 1 EQUIP NAV fuse box...
Page 55: ...Page 55 65 Issue 2 E N G L I S H LABELLING VI LABELLING VI 1 POSITION OF LABELS 3 4 5 6 1 2 7...
Page 56: ...Page 56 65 Issue 2 LABELLING VI 2 DESCRIPTION OF LABELS...