background image

Shanghai ZLAN Information Technology Co., Ltd          Tel: +86-17321037177          http://www.zlmcu.com 

Figure 1 ZLAN8100 GPRS DTU 

Can be applied to: 

 

Industrial remote control/sensing/measurement 

 

Meteorological Data Acquisition 

 

Three-Proofing & Hydrology Monitor 

 

Finance, GPRS, etc. 

Typical  application  connections  are  shown  in  FIG.  2.  Connect  the  232/485  devices  on 

site  to  ZLAN8100,  then  connect  to  the  Internet  via  GPRS  network  so  that  the  remote 

data center can be connected to ZLAN8100 GPRS DTU. 

 

Figure 2 Connection Diagram 

2.  Feature 

1)  Support user data transparent transmission 

2)  Support  connecting  data  center  through  fixed  IP  and  dynamic  domain  name 

resolution methods 

3)  Support TCP/UDP/SMS three data link communication modes 

4)  Support two working mode: real-time online and data triggering online 

5)  Support TCP/UDP link online to send custom registration packet function 

6)  Support TCP/UDP link sending custom heartbeat packet function 

7)  Support TCP/UDP link offline sending custom deactivation packet function 

8)  Support query and configure device parameter via remote SMS command 

Summary of Contents for ZLAN8100

Page 1: ...1 ZLAN8100 GPRS DTU Data Transmission Device User Manual RS232 485 To GPRS Solution Copyright Shanghai ZLAN Information Technology Co Ltd All right reserved Document DI ZL DUI 20140421 1 0 ...

Page 2: ...t notice It is against the law to copy the document on any medium except as specifically allowed in the license or nondisclosure agreement The purchaser may make one copy of the document for backup purposes No part of this manual may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying recording or through information storage and retrieval system...

Page 3: ...ce Parameters 10 3 Landing Device 11 4 Setting Parameters 11 5 Advanced Parameters 11 7 Usage 12 8 Parameter Instruction 14 8 1 General Parameters 14 8 2 Advanced Parameters 14 8 3 Equipment AT instruction 15 1 Enter Configuration Mode 15 2 Login 15 3 Acquisition Device Status 15 4 Get Serial Parameters 15 5 Set Serial Parameters 16 6 Get Network Parameters 16 7 Setting Network Parameters 17 8 Dev...

Page 4: ... with built in watchdog it has stable and reliable performance The product use 2 band GSM GPRS module the working frequency band is EGSM 900MHZ and DCS 1800MHZ It provides standard RS232 485 data interface can conveniently connect with devices such as RTU PLC IPC only needs one time to finish initialization configuration The user device can establish connections with data center through GPRS wirel...

Page 5: ...nter can be connected to ZLAN8100 GPRS DTU Figure 2 Connection Diagram 2 Feature 1 Support user data transparent transmission 2 Support connecting data center through fixed IP and dynamic domain name resolution methods 3 Support TCP UDP SMS three data link communication modes 4 Support two working mode real time online and data triggering online 5 Support TCP UDP link online to send custom registr...

Page 6: ...x 1400mA 9V Operating Temperature 40 85 Running temperature 40 125 Storage temp 0 95 Non Condensing Size 9 4cm 6 5cm 2 5cm 4 Hardware Instruction The front view of ZLAN8100 DTU is shown as FIG 1 Installation instructions 1 Antenna installation the device antenna interface adopts 50Ω SMA female the external antenna must use the antenna suitable for GPRS work band if use other antenna that not match...

Page 7: ...ght 2 LINK 64ms on 3000ms off indicating that GPRS is normally registered and other scintillation frequency indicates GPRS registration abnormality 3 POWER red indicates that ZLAN8100 has already been power on 4 GPRS light GPRS operating status indicator Figure 3 Interface ZLAN8100 side interface The interface is shown as FIG 3 1 Power input terminal type DC9 24V 2 RS485 signal input 3 RJ45 interf...

Page 8: ...heir own configuration code please refer to ZLAN8100 Configuration Instructions 6 Optional Work Station Instruction The GPRS DTU device of ZLAN technology supports the following two working modes and users can set reasonable working mode in combination with actual communication requirements In general the system needs real time query and timely reporting using real time online working mode to ensu...

Page 9: ...time Until there is data from the serial port it will be triggered online and the data will be reported After that if the data is not available for a period of time it will be automatically removed 6 2User Configuration Mode In this mode the basic working parameters of the device can be obtained and the user can modify the work parameters according to the locale The specific steps are as follows 1...

Page 10: ... the device will be checked out vi This process lasts for up to 30 seconds and the timeout cannot enter configuration mode The basic information of the device is shown in FIG 5 and the more commonly used is the TCP IP parameter which is listed here in the main interface The information box section is the data returned by the AT command Figure 5 Device Information 2 Obtain Device Parameters When th...

Page 11: ... the LOGIN is successful the LOGIN status will change otherwise LOGIN failed please confirm whether the password is correct or not 4 Setting Parameters Modify the parameters you need to change if the parameters need to be valid and click Set Param After setting the parameters there is no obvious prompt information If the information of the parameter box is consistent with the set information the m...

Page 12: ... for the client s connection request If the server is an Intranet connected to a router a port mapping is required to establish a connection Here we assume that the user server has a public network IP address Next is the 8100 DTU Settings as shown in FIG 8 sets the destination address using the configuration tool to fill the Dest IP Name with Server IP and fill the Dest with port put the device on...

Page 13: ...Shanghai ZLAN Information Technology Co Ltd Tel 86 17321037177 http www zlmcu com 13 Figure 8 Setting Destination Address Wait a moment 8100 will connect to the server ...

Page 14: ...the serial port will be set according to the saved parameters 2 Login Password The password is used in when login in the device to modify parameters 3 Baud Rate Baud rate for device normal communication 4 Destination IP or Domain Name The IP address of the server 5 Destination Port Server software port 6 Protocols Network communication transport protocol TCP UDP 8 2Advanced Parameters 7 Work Param...

Page 15: ... enter configuration mode after the device is started Return CFG MODE r 2 Login Command ZL LOGIN 666666 r n Function log in modify the device parameters to be successful when must be logged in Return LOGIN OK r n success or LOGIN NG r n failure 3 Acquisition Device Status Command ZL STAT The r n Function check the signal strength temperature and voltage of the device Return STAT strength temperatu...

Page 16: ... Returns BAUD n r n Command ZL CHECKB N O E r n Function set parity bit Returns CHECKB N O E r n N None Parity O Odd Parity E Even parity Command ZL DATAB 5 6 7 8 r n Function sets the data bit Returns DATAB 5 6 7 8 r n 6 Get Network Parameters Command ZL PIPADD r n Role gets the destination IP or domain name Returns PIPADD ip r n Command ZL PPORT r n Role gets the destination port Returns PPORT n...

Page 17: ...eturns PIPADD ip r n Command ZL PPORT n r n Role set destination port Returns PPORT n r n Directive ZL PROTOCOL TCP UDP r n Role set work mode Returns PROTOCOL TCP UDP r n Command ZL PDNS ip r n Role sets the DNS server IP address Returns PDNS ip r n 8 Device Working Mode Command ZL WORKTYPE r n Role get the device working mode Returns WORKTYPE 0 1 9 After Service Shanghai ZLAN Information Technol...

Page 18: ...Shanghai ZLAN Information Technology Co Ltd Tel 86 17321037177 http www zlmcu com 18 District Shanghai CN Tel 86 21 64325189 Fax 86 21 64325200 Web http www zlmcu com Email support zlmcu com ...

Reviews: