2
2.
Rotating the arms to the connection points until it was
fastening, and use the Hex key to fasten the one screw
on each arm, as shown in Figure 2-2
Figure 2-2
2.2 Power-on test before the installation of device
1.
Please make sure that the power requirements are strictly met to avoid permanent damage to the unit. Input voltage: AC
100~120V /200~240V.
Note:
The tripod turnstile must be connected to the ground (earth).
2.
Power on and wait 30s for the tripod turnstile to finish the self-check program.
3.
Lift the arms manually, as shown in Figure 2-4.
4.
Check whether the tripod turnstile and the LED indicators work properly.
If there is any problem, please contact the supplier.
Figure 2-3 Figure 2-4
Tighten the one screw on each
arm in clockwise direction.
Lift upwards
There is a power switch in the side direction of this power supply.
Power switch
Earth wiring
terminal