background image

It is recommended that the swing barrier turnstile must be installed on a horizontal solid platform 
with a height of 50mm to 100mm.

1.

After installation, check if the connection is done correctly at the connecting points of the ground 
wire, at the connector assemblies and wiring points of the circuits, as well as at each movable part 
of  the  swing  barrier  turnstile.  Any  loose  nuts,  screws  and  other  fasteners  should  be  tightened  in 
time to avoid any failures caused by long-time operations. 

4.

1

1  Installation Requirements 

3.

Make sure the ground wire of the system is reliably connected to avoid personal injuries or other 
accidents.

2.

It  is  also  recommended  that  the  swing  barrier  turnstile  should  not  be  used  in  the  corrosive 
environment.

The installation position of the swing barrier turnstile depends on its size. A distance of 100mm between 
the  swing  barrier  turnstile  and  the  wall  needs  to  be  reserved  for  ease  of  opening  the  top  cover  of  the 
machine to perform maintenance and adjustment. The reference figure is shown below: 

2  Installation Position 

1947 

1

0

2

2

4

8

7

650 

50 

50 

650 

100 

100 

120.00 

120.00 

120.00 

Summary of Contents for Mars-S1011

Page 1: ...o regular upgrades of systems and products ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual Version 1 0 Applicable Models Mars S1000 1...

Page 2: ...s caused by long time operations 4 1 1 Installation Requirements 3 Make sure the ground wire of the system is reliably connected to avoid personal injuries or other accidents 2 It is also recommended...

Page 3: ...allation site A Screwdriver To remove or install the screw on the device A Pencil To mark the device size and the screw hole A Electric Drill To drill holes according to the marked screw holes A Wrenc...

Page 4: ...4 Installation Remove the screws xing the top lid and remove the top lid 2 3 Remove the side lid that hang on the device 3...

Page 5: ...4 Mark the oor following the periphery of the legs 4 853 00 60 00 1282 1182 913 60 00 650...

Page 6: ...the electric drill according to the drawn screw holes 5 5 6 Clean up the soil and dust after the drilling is completed place the turnstile to the installation site again Insert the M12 expansion scre...

Page 7: ...id of the device 6 9 It is recommended that a warning line be marked on the ground after installing the device so as to prompt the pedestrian to stand behind the warning line when veri cation 42 1033...

Page 8: ...7 10 If you need to assemble the swing arm by yourself please refer to the diagram below for installation Note The swing arm is already installed in the factory...

Page 9: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com...

Reviews: