ZKTeco Mars-F1000 Installation Manual Download Page 3

1355.00 

1

0

1

0

.0

3  Preparation

2

To install the Mars-F1000 Series/Mars Pro-F1000 Series you must have:

4  Installation

1.       Place the turnstile to the installation site.

A Screwdriver:  

To remove or install the screw on the device. 

A Pencil:  

To mark the device  size and the screw hole. 

A Electric Drill: 

To drill holes according to the marked screw holes.

 

A Wrench: 

To secure the M12 expansion screw on the device.

A Tapeline:

 To measure the dimensions that need to be measured during the installation of the device.

Summary of Contents for Mars-F1000

Page 1: ...o regular upgrades of systems and products ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual Version 1 0 Applicable Models Mars F1000 1...

Page 2: ...ns 4 1 1 Installation Requirements The installation position of the ap barrier depends on its size A distance of 100mm between the ap barrier and the wall needs to be reserved for ease of opening the...

Page 3: ...allation site A Screwdriver To remove or install the screw on the device A Pencil To mark the device size and the screw hole A Electric Drill To drill holes according to the marked screw holes A Wrenc...

Page 4: ...4 Installation Remove the screws xing the top lid and remove the top lid 2 3 Remove the side lid that hang on the device 3...

Page 5: ...the legs 4 120 00 1253 00 781 24 120 00 Take the turnstile aside and use the electric drill according to the drawn screw holes 5 6 Clean up the soil and dust after the drilling is completed place the...

Page 6: ...wrench 7 8 Connect the online cables and perform the power on test If the test is OK install the side lid and top lid of the device M12 Expansion Screw Tether Cable Power Line 100 00 1202 49 180 00 3...

Page 7: ...6 Power Supply Air Switch 9 It is recommended that a warning line be marked on the ground after installing the device so as to prompt the pedestrian to stand behind the warning line when veri cation...

Page 8: ...10 If you need to assemble the swing arm by yourself please refer to the diagram below for installation Note The swing arm is already installed in the factory 7...

Page 9: ...ZKTeco Industrial Park No 32 Industrial Road Tangxia Town Dongguan China Phone 86 769 82109991 Fax 86 755 89602394 www zkteco com...

Reviews: